Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
| Company name | Viện Quy hoạch Xây dựng Đà Nẵng |
|
| International name | Institute for construction planning of Danang city | |
| Views | 1837 | |
| Business Tax ID | 0400447762 | |
| Tax ID issue date | 17/07/2003 | |
| Tax ID issue country | Việt Nam | |
| Business Registration ID | vn0400447762 | |
| Company Address | Số 163, 165 Trần Phú, Hải Châu I Ward, Hải Châu District, City Đà Nẵng | |
| Company Address (After merge) | Số 163, 165 Trần Phú, Phường Hải Châu, City Đà Nẵng | |
| Company Website | http://danangupi.vn | |
| Business | Consulting | |
| Form of Business | Administrative units, non-business units | |
| Company Establishment Date | 17/07/2003 | |
| The number of workers | 113 | |
| Date of registration on the Public procurement system | 13/08/2014 | |
| Payment Status |
Paid
According to Circular 06/2021, from March 3, 2022, investors and contractors will be stopped from trading if they do not pay fees for posting information, selecting contractors, investors on the national bidding network system. |
|
| Legal representative | Nguyễn Phúc Thọ | |
| Position | Parson | |
| Attached files |
Adjust business operations Organizational chart Business registration certificate
|
|
| Enterprise scale | Other | |
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:01 AM 03/21/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:26 PM 03/21/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors Institute for construction planning of Danang city are as follows:
You need to Login or Sign up to view all informations.
- Participated in 203 bidding packages, of which 193 were won, 7 were lost, 2 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 28.5% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.2% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (79), Quảng Ngãi (1), Huế (1), Undefined (122)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (70), Quảng Ngãi (1), Huế (1), Undefined (131)
- Has relationships with 44 Bid Solicitors
- Has relationships with 41 Bid Investors
- Has competed against 44 contractors in 28 bidding packages, won 21 packages, lost 7 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 27 contractors in 33 bidding packages, won 30 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 63 bidding packages with 13 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 13 | 6.7% |
| Lower by 10% to 20% | 9 | 4.7% |
| Lower by 5% to 10% | 52 | 26.9% |
| Lower by 1% to 5% | 55 | 28.5% |
| Lower by 0% to 1% | 13 | 6.7% |
| 0% | 45 | 23.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 6 | 3.1% |
| Unknown | 0 | 0% |
| Total | 193 | 100% |
Institute for construction planning of Danang city Won the bidding for the Prepare local adjustments to detailed planning at 1/500 scale at Da Nang City Employment Service Center, location 278 Au Co, Lien Chieu Ward, Da Nang City package, which was invited for bidding by the Trung tâm Dịch vụ việc làm thành phố Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
28/07/2026 16:30
Institute for construction planning of Danang city Won the bidding for the Prepare a project to adjust the zoning plan package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng, công nghiệp và hạ tầng kỹ thuật Đà Nẵng through an assign shorthand as master consortium of Liên danhViện Quy hoạch Xây dựng Đà Nẵng vàViện Kiến trúc quốc gia.
- Result: Won
18/05/2026 16:02
Institute for construction planning of Danang city Won the bidding for the Prepare a map of the height limit surface of aviation obstacles in Da Nang city area package, which was invited for bidding by the Danang Contruction Department through an assign shorthand as an independent entity.
- Result: Won
24/04/2026 14:12
Institute for construction planning of Danang city Won the bidding for the Prepare detailed planning adjustments TL 1/500 Hoa Lien 4 Resettlement Area - Phases 3, 4 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng, công nghiệp và hạ tầng kỹ thuật Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
13/04/2026 17:45
Institute for construction planning of Danang city Won the bidding for the Prepare a plan to expand and adjust the boundaries of the Commercial Area on a map of 1:10,000-1:25,000 scale package, which was invited for bidding by the Da Nang Department Of Industry And Trade through an assign shorthand as an independent entity.
- Result: Won
08/04/2026 16:57
Institute for construction planning of Danang city Won the bidding for the Survey consulting, feasibility study report preparation, building information modeling (BIM) steps to prepare a feasibility study report package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an Open bidding as master consortium of LIÊN DANH VIỆN QUY HOẠCH XÂY DỰNG ĐÀ NẴNG, CÔNG TY CỔ PHẦN NƯỚC VÀ MÔI TRƯỜNG VIỆT NAM, CÔNG TY TNHH TƯ VẤN KHẢO SÁT XÂY DỰNG TOÀN CHÍNH VÀ CÔNG TY CỔ PHẦN XÂY DỰNG & CÔNG NGHỆ BIM4C (VIẾT TẮT: LIÊN DANH UPI-VIWASE-TCC-BIM4C). One other contractors also participated.
- Result: Won
06/04/2026 15:13
Institute for construction planning of Danang city Won the bidding for the Set up the task of adjusting the detailed planning TL 1/500 of Hoa Lien 4 Resettlement Area - Phases 3 and 4 package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng, công nghiệp và hạ tầng kỹ thuật Đà Nẵng through an assign shorthand as an independent entity.
- Result: Won
16/03/2026 11:13
Institute for construction planning of Danang city join for the Survey consulting, feasibility study report preparation, building information modeling (BIM) steps to prepare a feasibility study report package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an Open bidding as master consortium of Viện Quy hoạch Xây dựng Đà Nẵng. One other contractors also participated.
- Result: Tender opening completed
11/03/2026 09:46
Institute for construction planning of Danang city Won the bidding for the Consulting on route planning, project locations, and total area layout in urban areas package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an assign shorthand as an independent entity.
- Result: Won
26/01/2026 09:14
Institute for construction planning of Danang city Won the bidding for the Consulting on detailed planning TL1:500 package, which was invited for bidding by the Da Nang Project Management Unit of Investment - Construction of Transport and Agriculture Works through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 14:42
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder Institute for construction planning of Danang city participated in 203 package, of which 193 package was won, failed 7 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Institute for construction planning of Danang city is related to 44 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Institute for construction planning of Danang city has a relationship with 41 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Institute for construction planning of Danang city competed with 44 contractors in 28 package, won 21 package, lost 7 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor Institute for construction planning of Danang city once entered into a partnership with 27 contractors in 33 package, won bid 30 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor Institute for construction planning of Danang city participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Institute for construction planning of Danang city participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,935 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor