Building route after 110kV Van Don 2 TBA connects the circuit with the 110kV Van Don 1 TBA
Project number
PR2500041668-00
Notice type
Real announcement
Project name
Building route after 110kV Van Don 2 TBA connects the circuit with the 110kV Van Don 1 TBA
Project objective
- Ensuring appropriate and meeting the electricity development planning of Quang Ninh province
- Ensure stable and continuous power supply for regional loads- Reducing radius of power supply, meeting the current and future load needs of
area.....
Authority
Director Nguyen Thanh Tinh
Project management Type
The investor directly manages the project
Implementation location
Đặc khu Vân Đồn, Quang Ninh province
Project approval ID
2124/QĐ-PCQN
Project approval date
08/07/2025
Approval authority
CÔNG TY ĐIỆN LỰC QUẢNG NINH - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
5.3. QD-PD. BCKTKT_XT sau TBA 110kV Van Don 2.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
12.924.578.157 VND |
Total amount |
12.924.578.157 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
1 |
0 |
0 |
1 |
1
|
1 |
12.74
|
1
|