Form No. 4B is used to prepare the E-HSMT applying the form of open bidding, limited bidding according to the one-stage, two-envelope method.
Subject | Ministry of Planning and Investment | Code | 4B |
Category | Circulars | Signer | Nguyễn Chí Dũng |
Area | Đấu thầu | Publtime | 15/02/2024 |
Package No. and E-Invitation No. (on the System): | _________________ |
Package Name (as stated in the E-Invitation on the System): | _________________ |
Project/Procurement Estimate (as stated in the E-Invitation on the System): | _________________ |
Issued on (as stated in the E-Invitation on the System): | _________________ |
Issued along with Decision No. (as stated in the E-Invitation on the System): | _________________ |
1. Scope of the Package | 1.1. The investor, as specified in the Electronic Bidding Document List, issues this set of Electronic Bidding Document to select the contractor for the procurement of goods package using the one-stage two-envelope method. 1.2. The name of the package, project/procurement estimate, the quantity, and the numbers of the parts of the package (in case the package is divided into multiple independent parts) are specified in Electronic Bidding Document List. |
2. Definitions in Online Bidding | 2.1. The bidding closing time is the deadline for receiving Electronic Pre-qualification application and is specified in the E-TBMT on the System. 2.2. The date is according to the Gregorian calendar, including weekends, holidays, and Tet holidays as prescribed by labor law. 2.3. The time and date on the System are the time and date displayed on the System (GMT+7). |
3. Funding Source | The funding source for the package is specified in the Electronic Bidding Document List. |
4. Prohibited Acts | 4.1. Offering, accepting, or brokering bribes. 4.2. Abusing position or power to unlawfully influence or interfere with bidding activities in any form. 4.3. Collusive bidding includes the following acts: a) Arranging, agreeing, or coercing one or more parties to prepare or withdraw E-Bid submissions so that one party wins the bid; b) Arranging or agreeing to refuse to supply goods, services, or sign subcontract agreements, or engaging in other agreements to restrict competition to favor one party in winning the bid; c) A capable and experienced contractor participates in the bidding and meets the requirements of the Electronic Bidding Document but intentionally does not provide documentation to prove capability and experience when requested for clarification or document verification, to favor another party in winning the bid. 4.4. Fraud includes the following acts: a) Forging or falsifying information, documents, or records in the bidding process; b) Intentionally providing false or biased information in the E-Bid submission to distort the results of contractor selection. 4.5. Obstruction includes the following acts: a) Destroying, deceiving, altering, concealing evidence, or falsely reporting; threatening or suggesting to any party to prevent the clarification of acts of giving, receiving, or brokering bribes, fraud, or collusion with the competent authorities in charge of supervision, inspection, audit; b) Obstructing the authority, investor, procuring entity, or contractor in the selection of a contractor; c) Obstructing the competent authorities from supervising, inspecting, auditing procurement activities; d) Intentionally filing false complaints, accusations, or petitions to hinder the procurement process; đ) Violating cybersecurity laws to interfere with or hinder online bidding activities. 4.6. Failing to ensure fairness and transparency includes the following acts: a) Participating in bidding as a contractor for a package for which the bidder is also the procuring entity, investor, or performs tasks of the procuring entity or investor, in violation of the Bidding Law; b) Involvement in both preparing and appraising the Electronic Bidding Document for the same package; c) Involvement in both evaluating the Electronic Pre-qualification application and appraising the contractor selection results for the same package; d) Individuals from the procuring entity or investor directly participating in the contractor selection process or being part of the expert or appraisal group for contractor selection results, or are authorized personnel or heads of the investor, procuring entity for packages in which their family members, as defined by the Law on Enterprises, bid or legally represent a bidding contractor; đ) Contractors participating in procurement packages for goods provided by the same contractor offering consulting services: preparing, appraising, or verifying cost estimates, technical designs, construction drawings, overall engineering designs (FEED); preparing or appraising Electronic Pre-qualification invitation Documents, Electronic Bidding Document; evaluating Electronic Pre-qualification application documents, Electronic Pre-qualification application; inspecting goods; appraising contractor selection results; supervising contract implementation; e) Bidding for a package under a project where the procuring entity, investor, is an agency or organization where they worked and held leadership or management positions within 12 months from the date they left that organization; g) Specifying particular brands or origins of goods in the Electronic Bidding Document, except as stipulated in point e, clause 3, Article 10, clause 2, Article 44, and clause 1, Article 56 of the Bidding Law; h) Including conditions in the Electronic Bidding Document to limit contractor participation or to favor one or several contractors, causing unfair competition in violation of clause 3, Article 44 of the Bidding Law; 4.7. Disclosing documents or information about the contractor selection process, except for providing information as stipulated in point b, clause 8, Article 77, clause 11, Article 78, point h, clause 1, Article 79, clause 4, Article 80, clause 4, Article 81, clause 2, Article 82, point b, clause 4, Article 93 of the Bidding Law, including: a) Contents of the Electronic Bidding Document before the issuance time as stipulated; b) Contents of the Electronic Pre-qualification application; clarification requests from the procuring entity and responses from the contractor during the Electronic Pre-qualification application evaluation; reports from the procuring entity, expert group, appraisal group, consultant contractor, and relevant technical authorities during contractor selection; meeting minutes of bidding evaluations, comments, and assessments of each Electronic Pre-qualification application before they are officially disclosed as stipulated; c) Contractor selection results before they are officially disclosed as stipulated; d) Other documents during contractor selection determined to contain state secrets under the law. 4.8. Transferring contracts in the following cases: a) A contractor transfers to another contractor a portion of work outside the maximum value for subcontractors and the volume of work reserved for special subcontractors as stipulated in the contract; b) A contractor transfers to another contractor a portion of work not exceeding the maximum value for subcontractors stipulated in the contract but outside the scope of work allocated for subcontractors proposed in the Electronic Pre-qualification application without approval from the investor or supervising consultant; c) The investor or supervising consultant approves the contractor's transfer of work as specified in point a of this clause; d) The investor or supervising consultant approves the contractor's transfer of work as specified in point b of this clause, exceeding the maximum value for subcontractors stipulated in the contract. |
5. Eligibility of the Bidder | 5.1. The bidder is an organization that meets the following conditions: a) Independent financial accounting; b) Not in the process of dissolution or having its enterprise registration certificate, cooperative registration certificate, union of cooperatives registration certificate, or cooperative group certificate revoked; not in a state of insolvency under bankruptcy laws; c) Ensures competition in bidding as stipulated in Electronic Bidding Document List; d) Not currently under a bidding ban as prescribed by the Law on Bidding; đ) Not currently under criminal investigation; e) Not in a state of suspension or termination of participation in the System. 5.2. The bidder is a business household that meets the following conditions: a) Has a business registration certificate as required by law; b) Not in the process of terminating operations or having its business registration certificate revoked; the business household owner is not under criminal investigation; c) Meets the conditions stipulated in points c, d, and e of Section 5.1 Electronic Competitive Dialogue and Negotiated Tendering. 5.3. The bidder is an individual or group of individuals submitting bids for their innovative products that meet the provisions of Clause 4, Article 5 of Decree No. 24/2024/ND-CP detailing the implementation of several articles and measures of the Law on Bidding regarding contractor selection (hereinafter referred to as Decree No. 24/2024/ND-CP) and is eligible to participate when meeting the following conditions: a) Has full legal capacity according to the laws of the country in which the individual is a citizen; b) Meets the conditions stipulated in points c, d, đ, and e of Section 5.1 Electronic Competitive Dialogue and Negotiated Tendering. 5.4. For packages valued below VND 500 million under the procurement estimates, the application of procurement from contractors with 50% or more of their workforce consisting of persons with disabilities, wounded soldiers, or ethnic minorities, with labor contracts of 03 months or more, and where contracts are still valid at the bid closing time, is regulated in Clause 1, Article 7 of Decree No. 24/2024/ND-CP and shall be implemented according to Bidding Document List. |
6. Contents of the E-Bidding Document | 6.1. The E-Bidding Document includes the E-Notice of Bid Invitation and Parts 1, 2, 3A (or Part 3B), Part 4 along with documents amending and clarifying the E-Bidding Document as prescribed in Section 7 of the E-Procurement Document (if any), which includes the following contents: Part 1. Bidding Procedures: - Chapter I. Instructions to Bidders; - Chapter II. Bidding Data Sheet; - Chapter III. Evaluation Criteria for E-Bids; - Chapter IV. Bidding and Tender Forms. Part 2. Technical Requirements: - Chapter V. Technical Requirements. Part 3A. Contract Conditions[1]: - Chapter VI. General Conditions of Contract; - Chapter VII. Specific Conditions of Contract; Part 3B. Framework Agreement[2] (Applicable in case of centralized procurement using framework agreements) - Chapter VI. General Conditions of the Framework Agreement; - Chapter VII. Specific Conditions of the Framework Agreement; - Chapter VIII. Framework Agreement; Part 4. Contract Forms. 6.2. The investor will not be responsible for the accuracy or completeness of the E-Bidding Document, clarification documents, or amended documents as prescribed in Section 7 of the E-Procurement Document if these documents are not provided by the investor on the System. The E-Bidding Document issued by the investor on the System will be the basis for review and evaluation. 6.3. Bidders must study all information in the E-Notice of Bid Invitation, E-Bidding Document, and amendments or clarifications to the E-Bidding Document, including the minutes of the pre-bid conference (if any), to prepare the E-Bid in compliance with the requirements of the E-Bidding Document. |
7. Amendments and Clarifications of the E-Bidding Document | 7.1. In case of amendments to the E-Bidding Document, the Procuring Entity shall publish the amendment decision along with the amended contents and the revised E-Bidding Document (webform and attached file). Amendments to the E-Bidding Document must be made at least 10 days before the bid closing date; for packages with a bid value not exceeding 10 billion VND, amendments must be made at least 3 working days before the bid closing date, ensuring sufficient time for the bidder to complete the E-Bid; if the aforementioned timeline is not met, the bid closing date must be extended. 7.2. In case clarifications of the E-Bidding Document are needed, bidders must submit a request for clarification to the Procuring Entity via the System no later than 3 working days before the bid closing date for the Procuring Entity to review and process. The Procuring Entity shall receive the clarification request, review, and respond via the System no later than 2 working days before the bid closing date, describing the clarification request without mentioning the name of the bidder requesting the clarification. If the clarification results in the need to amend the E-Bidding Document, the Procuring Entity shall amend the E-Bidding Document in accordance with Section 7.1 of the E-Procurement Document. 7.3. The Procuring Entity is responsible for monitoring the System to promptly clarify the E-Bidding Document upon the bidder's request. 7.4. Bidders are responsible for monitoring the System to update information regarding amendments to the E-Bidding Document, changes in the bid closing date (if any), to ensure the proper preparation of the E-Bid. In case of any errors due to failure to monitor or update information on the System that result in disadvantages for the bidder during the bidding process, such as changes or amendments to the E-Bidding Document, the bid closing date, contract negotiation dates, and other contents, the bidder must take responsibility and accept the disadvantages during the bidding process. 7.5. If necessary, the Procuring Entity may hold a pre-bid conference to discuss unclear issues in the E-Bidding Document as prescribed in Electronic Bidding Document List. The Procuring Entity shall post an announcement on the System regarding the pre-bid conference; all interested bidders may attend the pre-bid conference without prior notification to the Procuring Entity. The content of discussions between the Procuring Entity and bidders must be recorded and documented as a clarification of the E-Bidding Document, which shall be posted on the System within 2 working days after the conclusion of the pre-bid conference. 7.6. If the E-Bidding Document needs to be amended after the pre-bid conference, the Procuring Entity shall amend the E-Bidding Document in accordance with Section 7.1 of the E-Procurement Document. The minutes of the pre-bid conference are not considered an amendment to the E-Bidding Document. 7.7. The bidder's failure to attend the pre-bid conference or provide a confirmation of attendance does not constitute a reason for rejecting the bidder's E-Bid. |
8. Bidding Costs | The E-Bidding Document is issued free of charge on the System immediately after the Procuring Entity successfully uploads the E-Notice of Bid Invitation on the System. The bidder shall bear all costs related to the bidding process. The cost of submitting the E-Bid shall comply with the Electronic Bidding Document List. Under no circumstances shall the Investor be responsible for any costs related to the bidder's participation in the bidding process. |
9. Language of the E-Bid | The E-Bid and all documents and materials related to the E-Bid must be written in Vietnamese. Supplementary documents in the E-Bid (catalogs, etc.) may be written in other languages, accompanied by a Vietnamese translation. In the absence of a translation, the Procuring Entity may request the bidder to provide one (if necessary). |
10. Components of the E-Bid | The E-Bid includes the E-Technical Proposal (Electronic Technical Proposal) and the E-Financial Proposal (Electronic Financial Proposal), as follows: 10.1. The E-Technical Proposal (Electronic Technical Proposal) must include the following components:a) The Bid Form in the E-Technical Proposal (Electronic Technical Proposal), which is extracted by the System in accordance with Section 11 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering);b) The joint venture agreement extracted by the System according to Form No. 03, Chapter IV (for joint venture bidders);c) Bid security as prescribed in Section 18 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering);d) Declaration of the bidder's capacity and experience as prescribed in Section 16 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering);đ) Technical proposal and documentation as prescribed in Section 15 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering);e) Alternative technical proposal in the E-Bid as prescribed in Section 12 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering) (if any).The technical proposal must not contain any financial information. If the technical proposal includes significant financial information, the bidder will face disadvantages during the evaluation of the E-Bid. 10.2. The E-Financial Proposal (Electronic Financial Proposal) must include the following components:a) The bid form in the E-Financial Proposal (Electronic Financial Proposal) extracted by the System in accordance with Section 11 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering);b) Financial proposal and forms fully filled out as prescribed in Sections 11 and 13 of the E-Procurement Document (Electronic Competitive Dialogue and Negotiated Tendering).10.3. Other contents as prescribed in the Electronic Bidding Document List. |
11. Bid Form and Price Schedules | The bidder must complete all Forms in Chapter IV. The bidder should review the information in the Bid Form and price schedules extracted by the System to complete the E-Bid. |
12. Alternative Technical Proposal in the E-Bid | 12.1. An alternative technical proposal will only be considered if the E-Bidding Document specifies in the Electronic Bidding Document List that the bidder is allowed to propose an alternative technical solution. 12.2. The alternative technical proposal will only be considered if the primary proposal is evaluated as meeting the requirements and the bidder is ranked first. In such cases, the bidder must provide all necessary information for the Procuring Entity to evaluate the alternative technical proposal, including explanations, drawings, specifications, supply schedules, costs, and other relevant information. The evaluation of the alternative technical proposal in the E-Bid shall be conducted in accordance with Section 5, Chapter III. |
13. Bid Price and Discounts | For procurement packages that do not involve centralized purchasing, where bidder selection is based on the bidder's supply capability, the System will extract the following: 13.1. The bid price stated in the bid form and price schedules, along with any discounts, must comply with the provisions in this section: a) The bid price is the price offered by the bidder in the bid form, including all costs to execute the package (before discounts). The System will automatically extract the bid price from Form 11.1 or Form 11.2 in Chapter IV into the bid form. b) All parts (for packages divided into multiple parts) and items must be priced separately in the bid price schedules; c) For packages not divided into parts, if the bidder offers a discount, the percentage discount must be entered in the bid form. This discount is understood to be uniformly applied to all items in the bid price schedules. For fixed-price or adjustable-price contracts, the discount is calculated on the bid price excluding contingencies. d) The bidder must submit an E-Bid for all the required work in the E-Bidding Document and list bid prices for all work items in the columns "List of Goods" and "Service Description" according to Form 12.1 (12.1A, 12.1B, or 12.1C) or Form 12.2 (12.2A, 12.2B, or 12.2C), Form 13 (13A or 13B), Chapter IV. 13.2. If the package is divided into independent parts and allows bidding for each part, the bidder may bid on one or more parts of the package. The bidder must bid on all items in the part they are participating in. If the bidder offers a discount, it can be done in one of two ways: a) First method: enter the percentage discount in the bid form (in this case, it is understood that the bidder applies the same discount to all the parts they are bidding on). b) Second method: enter the percentage discount for each part into the webform on the System. 13.3. The bidder is responsible for the bid price to execute and complete the works as required in the E-Bidding Document. If the bidder provides an abnormally low unit price that affects the package quality, the Procuring Entity shall request the bidder to clarify the feasibility of such an abnormally low price in accordance with Clause 11, Article 131 of Decree No. 24/2024/ND-CP. 13.4. The bidder's bid price must include all taxes, fees, and charges (if any), applying the tax rates and fees in effect 28 days before the bid closing date. If the bidder declares that the bid price does not include taxes, fees, or charges (if any), the bidder's E-Bid will be disqualified. 13.5. The bidder shall offer the bid price as prescribed in the Electronic Bidding Document List. For procurement packages involving centralized purchasing, where bidder selection is based on supply capability, the System will extract the following: 13.1. The bid price stated in the bid form and price schedules, along with any discounts, must comply with the provisions in this section: a) The bid price is the price offered by the bidder in the bid form, including all costs to execute the work scope offered by the bidder based on their supply capability (before discounts). The System will automatically extract the bid price from Form 11.1 or Form 11.2 in Chapter IV into the bid form. b) One or more parts (for packages divided into multiple parts) and one or more items must be separately priced in the bid price schedules; c) For packages not divided into parts, if the bidder offers a discount, the percentage discount must be entered in the bid form. This discount is understood to be uniformly applied to all items in the bid price schedules. For fixed-price or adjustable-price contracts, the discount is calculated on the bid price excluding contingencies. d) The bidder submits an E-Bid for the work scope they are capable of supplying from the list of work items in the E-Bidding Document and lists the unit prices for these work items in the columns "List of Goods" and "Service Description" according to Form 12.1 (12.1A, 12.1B, or 12.1C) or Form 12.2 (12.2A, 12.2B, or 12.2C), Form 13 (13A or 13B), Chapter IV. 13.2. If the package is divided into independent parts and allows bidding for each part, the bidder may bid on one or more parts of the package. For each part, the bidder may either offer the full quantity and items as required by the E-Bidding Document for that part or offer based on the quantity and items they are capable of supplying (even if not meeting the full quantity required by the E-Bidding Document for that part). If the bidder offers a discount, it can be done in one of two ways: a) First method: enter the percentage discount in the bid form (in this case, it is understood that the bidder applies the same discount to all the parts they are bidding on). b) Second method: enter the percentage discount for each part into the webform on the System. 13.3. The bidder is responsible for the bid price to execute and complete the works based on the scope of work offered by the bidder. If the bidder offers an abnormally low unit price that affects the package quality, the Procuring Entity shall request the bidder to clarify the feasibility of such an abnormally low price in accordance with Clause 11, Article 131 of Decree No. 24/2024/ND-CP. 13.4. The bidder's bid price must include all taxes, fees, and charges (if any), applying the tax rates and fees in effect 28 days before the bid closing date. If the bidder declares that the bid price does not include taxes, fees, or charges (if any), the bidder's E-Bid will be disqualified. 13.5. The bidder shall offer the bid price as prescribed in the Electronic Bidding Document List |
14. Bid Currency and Payment Currency | The bid currency and payment currency is VND. |
15. Documents Demonstrating the Compliance of Goods and Related Services | 15.1. To demonstrate the compliance of the goods and related services with the requirements of the E-Bidding Document, the bidder must provide documents to prove that the goods offered comply with the technical requirements set out in Chapter V. These documents are part of the E-Bid. 15.2. The term “goods” includes machinery, equipment, raw materials, fuels, materials, supplies, spare parts; products; vehicles; consumer goods; medicines, chemicals, testing supplies, medical equipment; commercial software... 15.3. The term “origin” is understood as the country or territory where the goods are extracted, bred, cultivated, produced, manufactured, or processed in that country or territory, through a process of manufacture, processing, or assembly that results in a product recognized commercially and that is substantially different in basic characteristics from the initial components. 15.4. The term “related services” includes services such as insurance[3], installation, maintenance, initial repairs, or other after-sales services such as training, technology transfer... 15.5. The bidder must declare the origin of goods in Form No. 10B, Chapter IV. If the bidder offers multiple origins for a single unit of goods (one item, one piece, etc.) but from the same manufacturer and at the same unit price, the Procuring Entity shall request the bidder to clarify the specific origin of such goods. 15.6. Requirements for the origin of goods are carried out according to Form No. 01A, 01B, 01C in Chapter IV. If the Investor requires the origin from a group of countries or territories as prescribed in Clause 2, Article 44 of the Law on Bidding, the bidder must offer goods with the required origin or Vietnamese origin, even if the group of countries or territories requested by the Investor does not include Vietnam. If the bidder offers goods without the required origin in the E-Bidding Document or not of Vietnamese origin, the bidder will be disqualified. If the Investor requires the bidder to offer goods of Vietnamese origin according to Point e, Clause 3, Article 10 of the Law on Bidding, and the bidder offers goods not of Vietnamese origin, they will be disqualified. 15.7. Documents demonstrating the compliance of goods and related services may include records, documents, drawings, and data, described in detail for each item, regarding the technical specifications and basic functions of the goods and related services. These documents should demonstrate the basic compliance of the goods and services with the requirements of the E-Bidding Document and provide a list of discrepancies and exceptions (if any) compared to the provisions in Chapter V. 15.8. The bidder must provide a full list of materials, prices, suppliers of spare parts, specialized tools, and consumables... (hereinafter referred to as materials and spare parts) necessary to ensure the proper and continuous operation of the goods for the period specified in Electronic Bidding Document List. 15.9. The standards for the manufacture, production processes of materials and equipment, as well as references to the brand or catalog numbers stipulated by the Investor in Chapter V, are for description purposes only and not intended to limit the bidder. The bidder may propose alternative quality standards, brands, or catalogs as long as the bidder can demonstrate to the Procuring Entity that such alternatives still ensure basic or superior equivalence to the requirements set forth in Chapter V. |
16. Documents Demonstrating the Bidder's Capability and Experience | 16.1. The bidder must fill out the necessary information in the Forms in Chapter IV to provide details on capability and experience as required in Chapter III. If invited for document verification, the bidder must have the documents ready for verification against the information declared in the E-Bid and for the Investor's record. 16.2. Requirements for documents to demonstrate the bidder's capability to perform the contract if awarded the bid are carried out according to the Electronic Bidding Document List. 16.3. If the package involves pre-qualification and there is a change in the bidder's capability and experience between the time of submitting the E-Bid and the pre-qualification phase, the bidder must update their capability and experience accordingly. |
17. Validity Period of E-Bid | 17.1. The E-Bid shall be valid for no less than the period specified in the Electronic Bidding Document List. 17.2. If necessary, before the expiration of the E-Bid validity period, the Procuring Entity may request bidders to extend the validity of their E-Bids, and at the same time, request the bidder to extend the validity period of the bid security (by the extended E-Bid validity period plus an additional 30 days). If the bidder does not agree to extend the E-Bid validity period, the E-Bid will no longer be considered, and in such cases, the bidder is not required to submit the original bid security to the Procuring Entity. Bidders agreeing to the extension of the E-Bid validity period shall not be permitted to modify any content of the E-Bid, except for the extension of the bid security. The request for and agreement to the extension shall be conducted via the System. |
18. Bid Security | 18.1. When participating in online bidding, the bidder must secure the bid before the bid closing time through one or more forms of a bid security letter issued by a legal representative of a domestic credit institution or a branch of a foreign bank established in accordance with Vietnamese law, or a bid security insurance certificate issued by a domestic non-life insurance company, or a branch of a foreign non-life insurance company established in accordance with Vietnamese law. issued. In cases where the bid security value is less than 20 million VND, follow the regulations in Section 18.8 of the Electronic Competitive Dialogue and Negotiated Tendering. For paper-based bid security guarantees or insurance certificates, the bidder shall scan the bank guarantee letter or insurance certificate and attach it when submitting the E-Bid. For electronic bid security, the bidder shall select the electronic bid security issued and stored on the System. If the E-Bid validity period is extended as specified in Section 17.2 of the Electronic Competitive Dialogue and Negotiated Tendering, the bid security must also be extended accordingly. For joint ventures, all members must use the same form of bid security: either electronic bid security or paper-based. In the case of a joint venture, the bid security can be carried out in one of two ways: a) Each member of the joint venture will separately provide bid security, but the total value must not be less than the required amount specified in Section 18.2 of the Electronic Competitive Dialogue and Negotiated Tendering; if the bid security of one member in the joint venture is deemed invalid, the E-Bid of that joint venture will not be considered or evaluated further. If any member of the joint venture violates the law, leading to forfeiture of the bid security as specified in point b of Section 18.5 of the Electronic Competitive Dialogue and Negotiated Tendering, the bid security of all members in the joint venture will be forfeited; b) The joint venture members agree that one member will be responsible for providing the bid security on behalf of the joint venture members. In this case, the bid security can include the name of the joint venture or the name of the member responsible for providing the bid security for the other members in the joint venture, but the total value must not be less than the required amount specified in Section 18.2 of the Electronic Competitive Dialogue and Negotiated Tendering. If any member of the joint venture violates the law, leading to forfeiture of the bid security as specified in point b of Section 18.5 of the Electronic Competitive Dialogue and Negotiated Tendering, the bid security of all members in the joint venture will be forfeited. 18.2. The value, currency, and validity period of the bid security are specified in detail in the Electronic Bidding Document List, for procurement packages involving centralized purchasing where bidder selection is based on supply capability, the bid security of the bidder corresponds to the bid price stated in the bid form after discounts (if any) with the bid security percentage specified in the Electronic Bidding Document List. The validity period of the bid security is calculated from the bid closing date to the last valid day of the bid security (the end of the bid security validity period is within the last day of its validity without needing to reach the end of the 24-hour period of that day). 18.3. The bid security is deemed invalid if it falls under one of the following cases: its value is lower, its validity period is shorter than required under Section 18.2 of the Electronic Competitive Dialogue and Negotiated Tendering, it is addressed to an incorrect beneficiary, it lacks a valid signature (or electronic signature for electronic bid security), it was signed before the Investor issued the E-Bidding Document, or it contains conditions unfavorable to the Investor or the Procuring Entity (including failure to meet all commitments as required in Form No. 04A, Form No. 04B in Chapter IV). In cases of bid security letters or insurance certificates, the security letter or insurance certificate must be signed and stamped (if any) by a legal representative of a domestic credit institution, or a branch of a foreign bank established under Vietnamese law, or a domestic non-life insurance company, or a branch of a foreign non-life insurance company established under Vietnamese law. 18.4. Unsuccessful bidders will have their bid security returned or released within the time limit specifiedElectronic Bidding Document List. For the successful bidder, the bid security will be returned or released when the contract comes into effect. 18.5. Cases where the original bid security letter or insurance certificate (for paper-based bid security) must be submitted to the Procuring Entity: a) The bidder is invited for document verification, contract negotiation (if any); b) The bidder violates the bidding regulations leading to forfeiture of the bid security in the following cases: - After the bid closing time and during the E-Bid validity period, the bidder submits a written withdrawal of the E-Bid or refuses to perform one or more tasks proposed in the E-Bid as required by the E-Bidding Document; - The bidder commits an act in violation of the Law on Bidding, leading to the cancellation of the bid as specified in points d and dd, Clause 1, Article 17 of the Law on Bidding; - The bidder fails to implement the contract performance security measures as prescribed in Article 68 of the Law on Bidding; - The bidder fails to carry out or refuses to verify documents within 5 working days from the date of receiving the invitation for document verification or has verified the documents but refuses to sign the verification minutes, except for cases of force majeure; - The bidder fails to carry out or refuses to negotiate the contract (if any) within 5 working days from the date of receiving the contract negotiation invitation or has negotiated the contract but refuses to sign the contract negotiation minutes, except for cases of force majeure; - The bidder fails to complete or refuses to finalize the contract, framework agreement within 10 days from the date of receiving the notice of bid selection from the Procuring Entity, except for cases of force majeure; - The bidder fails to carry out or refuses to sign the contract, framework agreement within 10 days from the date of completing the contract, framework agreement, except for cases of force majeure;. 18.6. Within 5 working days from the date of receiving the request from the Procuring Entity, if the bidder refuses or fails to submit the original bid security letter, insurance certificate (for paper-based bid security) as requested by the Procuring Entity, the bidder will be subject to sanctions in accordance with the commitments in the bid submission. 18.7. In the case of a procurement package divided into multiple independent parts, the bidder may choose to submit bid security in one of the following two ways: a) Joint bid security for all parts for which the bidder is participating (the bid security value will be equal to the total value of the parts the bidder is participating in). If the bid security value submitted by the bidder is less than the cumulative total value, the Procuring Entity reserves the right to decide which part(s) the bid security will be applied to from the parts the bidder is participating in; b) Separate bid security for each part in which the bidder is participating. In case the bidder violates and results in forfeiture of bid security as stipulated in point b of Section 18.5 of the Electronic Competitive Dialogue and Negotiated Tendering, the forfeiture will be applied to the part in which the bidder violated. 18.8. For packages with bid security amounts under Section 18.2 of the Electronic Competitive Dialogue and Negotiated Tendering less than 20 million VND, at the time of bid closing, the bidder is not required to attach a bid guarantee letter or an insurance guarantee certificate as specified in Section 18.1 of the Electronic Competitive Dialogue and Negotiated Tendering, but must commit in the bid submission (no separate written commitment is needed) that if invited for document verification or if violating point b of Section 18.5 of the Electronic Competitive Dialogue and Negotiated Tendering, they will submit an amount of money or a cashier’s check (if the cashier’s check meets the investor's requirements for validity) or a bid security or insurance guarantee certificate with the value specified in Section 18.2 of the Electronic Competitive Dialogue and Negotiated Tendering. If the bidder does not comply with this commitment, they will be subject to penalties according to their commitment in the bid submission (being named on the System and having their account locked for 6 months, starting from the date the Bidding Management Department, Ministry of Planning and Investment receives the investor's request). If the bidder violates the provision in point b of Section 18.5 of the Electronic Competitive Dialogue and Negotiated Tendering, they will not be refunded the bid security amount. |
19. Bid Closing Time | 19.1. The bid closing time is as specified in the E-TBMT. 19.2. The investor may extend the bid closing time by amending the E-TBMT. When the bid closing time is extended, all responsibilities of the investor and the bidder related to the previous bid closing time will be adjusted according to the new extended bid closing time. |
20. Submission, Withdrawal, and Amendment of E-Bids | 20.1. Submission of E-Bids: The bidder may only submit one E-Bid for one E-TBMT when participating in online bidding. In the case of a joint venture, the leading member of the joint venture (as agreed in the joint venture agreement) submits the E-Bid after obtaining the approval of all members in the joint venture. 20.2. Amendment and Resubmission of E-Bids: If it is necessary to amend an already submitted E-Bid, the bidder must withdraw the entire previously submitted E-Bid to make appropriate amendments. After completing the revised E-Bid, the bidder must resubmit the new E-Bid. If the bidder submitted the E-Bid before the investor amended the E-Bidding Document (if any), the bidder must resubmit a new E-Bid in accordance with the amended E-Bidding Document. 20.3. Withdrawal of E-Bids: The bidder may withdraw the E-Bid before the bid closing time. The system will notify the bidder of the status of the E-Bid withdrawal (successful or unsuccessful). The system will record information on the bidder's E-Bid withdrawal time. 20.4. The bidder may only withdraw, amend, or resubmit the E-Bid before the bid closing time. After the bid closing time, all successfully submitted E-Bids on the system will be opened for evaluation. |
21. Opening of Electronic Technical Proposal | 21.1. The Procuring Entity must open the Electronic Technical Proposal and publicly disclose the minutes of the opening of the Electronic Technical Proposal on the system within no more than 2 hours from the bid closing time. In the case of only 1 or 2 bidders submitting E-Bids, the Procuring Entity must report to the Investor for consideration and handling in accordance with Clause 5, Article 131 of Decree No. 24/2024/ND-CP; in case no bidders submit E-Bids, the Investor may consider extending the bid closing time or reorganizing the online bidding process (cancel this E-TBMT and post a new E-TBMT) in accordance with Clause 4, Article 131 of Decree No. 24/2024/ND-CP. 21.2. The minutes of the opening of Electronic Technical Proposal are publicly posted on the system, including the following main contents: a) Information about the package: - E-TBMT number; - Package name; - Investor’s name; - Selection method; - Contract type; - Time of bid opening completion; - Total number of bidders. b) Information about the participating bidders: - Bidder’s name; - Bid security value and validity[4]; - Validity period of the Electronic Technical Proposal; - Contract implementation time; - Other related information (if any). c) In case the package is divided into independent parts, the bid price for each part must be included as per point b of this clause. |
22. Evaluation of Electronic Technical Proposal | 22.1. The procuring entity applies the evaluation method as stipulated in Electronic Bidding Document List to evaluate Electronic Technical Proposal. 22.2. The process for evaluating Electronic Technical Proposal is as follows: a) Step 1: Evaluate eligibility in accordance with Section 1 of Chapter III. - The system automatically evaluates based on the bidder's commitments in the bid submission regarding the following: + The legal eligibility of the bidder; + Within 3 years prior to the bid closing date, the bidder has not had personnel (who signed labor contracts with the bidder at the time of the violation) convicted by a court for serious violations of bidding regulations under criminal law to favor the bidder in winning the bid. . In case the expert team discovers that the bidder's commitments are dishonest, leading to distortion of the bidding results, the bidder will be considered to have committed fraud in bidding. - The expert team evaluates the validity of the bid security, joint venture agreement (for joint ventures). For bid security in centralized procurement, where bidder selection is based on supply capability, the determination of the validity of bid security is done during the financial evaluation step. - The bidder who is evaluated as passing all eligibility criteria will proceed to the capacity and experience evaluation. b) Step 2: Evaluate capacity and experience in accordance with Section 2 of Chapter III - The system automatically evaluates the following aspects: history of contract non-fulfillment, tax declaration and payment obligations, financial performance, and average annual revenue based on the information declared and extracted in the Electronic Pre-qualification application. For the contents evaluated automatically by the system, the bidder does not need to attach documents to prove them when submitting the Electronic Pre-qualification application. - For the evaluation of similar contracts, production capacity of goods, the expert team will evaluate based on the information declared by the bidder on the webform and the attached documents. - For the key personnel evaluation, the expert team will evaluate based on the information declared by the bidder. - The bidder who is evaluated as passing all capacity and experience criteria will proceed to the technical evaluation. c) Step 3: Evaluate the technical aspects in accordance with Section 3 of Chapter III. The bidder whose Electronic Technical Proposal does not meet the requirements will not proceed to the opening of the Electronic Financial Proposal for evaluation. The procuring entity will publish the list of bidders who meet the technical requirements on the system.. 22.3. Principles for evaluating Electronic Technical Proposal: a) For the contents evaluated automatically by the system, including legal eligibility, the bidder has no personnel convicted by a court for serious violations of bidding regulations, contract non-fulfillment history due to the bidder's fault, tax declaration and payment obligations, financial performance, average annual revenue. In cases where the bidder does not declare information or declares incorrectly, incompletely, or fails to meet the Electronic Bidding Document requirements, the system will evaluate the bidder as "fail" for that content. The expert team cannot change the evaluation from "fail" to "pass" once the system has evaluated it as "fail." If the bidder's committed or declared information in the Electronic Pre-qualification application is dishonest, leading to distortion of the Electronic Pre-qualification application evaluation results, the bidder will be considered to have committed fraud; b) In case of discrepancies between the bid security information declared by the bidder on the webform and the scanned bid security file, the evaluation will be based on the information in the scanned bid security file (in the case of a bid guarantee letter or a written insurance guarantee). c) In case of inconsistencies between the information on similar contracts declared on the webform and the supporting documents attached, the procuring entity will request the bidder to clarify the Electronic Pre-qualification application. If the contracts declared or attached in the Electronic Technical Proposal do not meet the Electronic Bidding Document requirements or the bidder does not declare or incompletely declares similar contracts on the webform, the procuring entity will request the bidder to clarify or submit additional contracts (updated from the bidder's capability profile on the system) to meet the Electronic Bidding Document requirements within an appropriate timeframe but not less than 3 working days. If the bidder does not have contracts that meet the Electronic Bidding Document requirements, the bidder will be disqualified; d) In case the key personnel proposed by the bidder in Electronic Technical Proposal do not meet the requirements or fail to demonstrate the ability to mobilize personnel (including the case where personnel have already been mobilized for another contract with a working time that overlaps with the execution time of this bidding package), the procuring entity allows the bidder to supplement or replace them. The bidder is allowed to supplement or replace personnel for each position only once within an appropriate timeframe, but not less than 3 working days. If the bidder does not have replacement personnel that meet the Electronic Bidding Document requirements, the bidder will be disqualified. In all cases, if the bidder declares personnel dishonestly, the bidder is not allowed to replace the personnel, their Electronic Pre-qualification application will be disqualified, and the bidder will be considered fraudulent as per Clause 4 of Article 16 of the Law on Bidding and handled according to the provisions in point a, Clause 1, Article 125 of Decree No.24/2024/NĐ-CP. đ) For the origin of goods, in case of inconsistencies between the information declared on the webform and the attached file, the procuring entity shall request clarification of the Electronic Pre-qualification application; e) For contents other than those specified at points a, b, c, d, and đ of this clause, in case of inconsistencies between the information declared on the webform and the attached file, the information on the webform will serve as the basis for review and evaluation; g) At the financial evaluation stage, if the bidder does not declare information in the form regarding the preferences for domestically produced goods as a basis for calculating preferences, the bidder will not be entitled to the preferences. |
23. Opening of Electronic Financial Proposal | 23.1. The Electronic Financial Proposal of the bidders listed as meeting the technical requirements will be opened and publicly disclosed by the procuring entity on the system. 23.2. The minutes of the opening of the Electronic Financial Proposal will be publicly posted on the system, including the following key information: a) Information about the bidding package: - E-TBMT number; - Name of the bidding package; - Name of the investor; - Bidder selection method; - Type of contract; - Time of bid opening completion; b) Information about the bidders whose Electronic Financial Proposals were opened: - Name of the bidder; - Bid price; - Percentage (%) discount (if any); - Bid price after discount (if any) (the system automatically calculates based on recalculation of contingency costs after discount); - Technical scores of bidders who passed the technical evaluation (if any); - Validity period of Electronic Financial Proposal; - Other related information (if any). c) In case the bidding package is divided into multiple independent parts, the bid price information for each part must be included as per point b of this clause. |
24. Evaluation of Electronic Financial Proposal and Bidder Ranking | 24.1. The evaluation of Electronic Financial Proposal is carried out in accordance with Section 4, Chapter III and as stipulated in Electronic Bidding Document List. For bid security in centralized procurement, where bidder selection is based on supply capability, the determination of the validity of bid security is done at this stage. 24.2. After the evaluation of Electronic Financial Proposal, the procuring entity prepares a bidder ranking list. Bidder ranking is done according to the provisions of Electronic Bidding Document List. The first-ranked bidder is invited for document verification as stipulated in Section 32 of the Electronic Competitive Dialogue and Negotiated Tendering. If the invited bidder does not meet the Electronic Bidding Document requirements, the next-ranked bidder will be invited for verification. If there are contract negotiations, the verification of documents will be combined with contract negotiations. In cases where only one bidder passes the financial evaluation, bidder ranking is not required. For centralized procurement with bidder selection based on supply capability, the bidder ranking list is arranged from lowest to highest bid prices after discounts (if any), calculated per unit of the items the bidders are bidding for. Bidders invited for document verification will be a combination of the lowest to highest-ranked bidders, ensuring that the total quantity of goods offered by the bidders is not less than the quantity of goods specified in the Electronic Bidding Document. 24.3. In case of inconsistencies between the information declared on the webform and the attached file, the information on the webform will be the basis for review and evaluation; 24.4. The bidder invited for document verification must prepare the documents to verify and prove the information declared in the Electronic Pre-qualification application. For the contents of eligibility, contract non-fulfillment history due to the bidder's fault, tax declaration and tax payment, average annual revenue, net asset value that the system automatically evaluated as "pass" based on the declared information extracted in the Electronic Pre-qualification application, but the expert team reevaluated as "fail," the expert team will change the evaluation result from "pass" to "fail." In such cases, the procuring entity will invite the next-ranked bidder for document verification without re-ranking the bidders. Regarding the information about tax declaration, tax payment, average annual revenue from 2021 onwards, the procuring entity only verifies if the bidder updates the information, and no verification is required if the information is automatically extracted by the system from the National Business Registration System and the Electronic Tax System. |
25. Confidentiality | 25.1. Information related to the evaluation of the Electronic Pre-qualification application and the contract award proposal must be kept confidential and must not be disclosed to the bidders or any individuals not officially involved in the bidding process until the results are made public. Under no circumstances should information in one bidder's Electronic Pre-qualification application be disclosed to another bidder, except for the information made public in the bid opening minutes. 25.2. Except for clarifications of the Electronic Pre-qualification application (if necessary), document verification, and contract negotiation (if any), the bidder is not allowed to contact the Investor or the Procuring Entity regarding their Electronic Pre-qualification application or any other issues related to the bidding package from the time of bid opening until the bidding results are made public. |
26. Clarification of Electronic Pre-qualification application | 26.1. After bid opening, the bidder is responsible for clarifying the Electronic Pre-qualification application at the request of the Procuring Entity, including matters related to eligibility, capacity, experience, tax declaration and payment obligations, and specific personnel documents proposed in the bidder’s Electronic Pre-qualification application. For eligibility matters, the clarification must ensure that it does not alter the nature of the bidder participating in the bidding. For matters related to the validity of the Electronic Pre-qualification application (except for eligibility), technical and financial proposals, the clarification must ensure that it does not change the basic content of the submitted Electronic Pre-qualification application, nor change the bid price. 26.2. During the evaluation process, clarification of the Electronic Pre-qualification application between the bidder and the Procuring Entity is carried out directly on the system. 26.3. Clarification of the Electronic Pre-qualification application is only conducted between the Procuring Entity and the bidder whose Electronic Pre-qualification application needs clarification. For clarifications that directly affect the evaluation of eligibility, capacity, experience, and technical and financial requirements, if the bidder fails to clarify by the deadline or provides clarification that does not meet the requirements of the Procuring Entity, the Procuring Entity will evaluate the bidder’s Electronic Pre-qualification application based on the submission before the bid closing time. The Procuring Entity must give the bidder a reasonable time to clarify the Electronic Pre-qualification application. 26.4. The bidder cannot clarify the Electronic Pre-qualification application after the bid closing time. 26.5. In case of inconsistencies in the content of the Electronic Pre-qualification application or unclear information, the Procuring Entity shall request the bidder to clarify in accordance with Section 26.1 of the Electronic Competitive Dialogue and Negotiated Tendering. 26.6. In case of suspicion about the authenticity of the documents provided by the bidder, the Investor or the Procuring Entity is entitled to verify with the organizations or individuals related to the content of the documents. 26.7. In case the Electronic Bidding Document requires commitments, provisional warranty, maintenance, and service agreements, but the Electronic Pre-qualification application does not include these documents, the Procuring Entity shall request the bidder to clarify the Electronic Pre-qualification application and supplement the documents within an appropriate timeframe but not less than 3 working days as a basis for evaluating the Electronic Pre-qualification application. |
27. Deviations, Conditions, and Omissions | 27.1. “Deviation” refers to differences from the requirements stated in the Electronic Bidding Document; 27.2. “Condition” refers to setting restrictive conditions or expressing incomplete acceptance of the requirements stated in the Electronic Bidding Document; 27.3. “Omission” refers to the bidder’s failure to provide part or all of the information or documents required in the Electronic Bidding Document. |
28. Determining the Responsiveness of the Electronic Pre-qualification application | 28.1. The Procuring Entity will determine the responsiveness of the Electronic Pre-qualification application based on the content of the Electronic Pre-qualification application in accordance with Section 10 of the Electronic Competitive Dialogue and Negotiated Tendering. 28.2. A basically responsive Electronic Pre-qualification application is one that meets the requirements stated in the Electronic Bidding Document without any material deviations, conditions, or omissions. Material deviations, conditions, or omissions refer to points in the Electronic Pre-qualification application that: a) If accepted, would significantly affect the scope, quality, or performance of the related goods or services; significantly limit or be inconsistent with the rights of the Investor or the obligations of the bidder under the contract, as set forth in the Electronic Bidding Document; b) If corrected, would unfairly affect the competitive position of other bidders with basically responsive Electronic Pre-qualification applications that meet the requirements of the Electronic Bidding Document. 28.3. The Procuring Entity must check the technical aspects of the Electronic Pre-qualification application in accordance with Sections 15 and 16 of the Electronic Competitive Dialogue and Negotiated Tendering to ensure that all the requirements stipulated in the Electronic Bidding Document have been met and that the Electronic Pre-qualification application contains no material deviations, conditions, or omissions. 28.4. If the Electronic Pre-qualification application does not basically meet the requirements stated in the Electronic Bidding Document, that Electronic Pre-qualification application will be disqualified; material deviations, conditions, or omissions in the Electronic Pre-qualification application cannot be modified to make the Electronic Pre-qualification application meet the Electronic Bidding Document requirements. |
29. Minor Errors | 29.1. Provided that the Electronic Pre-qualification application basically meets the requirements stated in the Electronic Bidding Document, the Procuring Entity and the expert team may accept minor errors that are not material deviations, conditions, or omissions in the Electronic Pre-qualification application. 29.2. Provided that the Electronic Pre-qualification application basically meets the requirements stated in the Electronic Bidding Document, the Procuring Entity and the expert team may request the bidder to provide the necessary information or documents within a reasonable time to correct any minor discrepancies or non-material errors in the Electronic Pre-qualification application related to document requirements. The request for such information and documents must not relate to any elements of the bid price. The bidder's Electronic Pre-qualification application will be disqualified if the bidder fails to meet this request from the Procuring Entity. 29.3. Provided that the Electronic Pre-qualification application basically meets the requirements stated in the Electronic Bidding Document, the Procuring Entity and the expert team may correct minor and quantifiable errors related to the bid price; the bid price will be adjusted to reflect the cost of missing or unmet items. This adjustment is only for the purpose of comparing Electronic Pre-qualification applications. |
30. Subcontractors | 30.1. A subcontractor is an organization or individual contracted by the bidder to perform related services. 30.2. Subcontractor requirements are stipulated in Electronic Bidding Document List. 30.3. The use of subcontractors does not change the responsibilities of the bidder. The bidder is responsible for the volume, quality, schedule, and other obligations for the portion of work performed by the subcontractor. The capacity and experience of subcontractors will not be considered when evaluating the bidder's Electronic Pre-qualification application. The bidder must meet the capacity and experience criteria itself (without considering the subcontractor's capacity and experience). 30.4. The bidder may contract with subcontractors listed in the Electronic Pre-qualification application or with a subcontractor approved by the investor to participate in providing related services. 30.5. If the bidder commits an act of contract transfer as stipulated in Clause 8, Article 16 of the Law on Bidding, it will be handled in accordance with point b, Clause 1, Article 125 of Decree No. 24/2024/NĐ-CP. 30.6. The investor or Procuring Entity shall not approve the use of a subcontractor by the bidder if the subcontractor was involved in providing consulting services for the bidding package awarded to the bidder, including services such as valuation; contract supervision, inspection; preparation and appraisal of Electronic Pre-qualification invitation Documents and Electronic Bidding Document; evaluation of Electronic Pre-qualification application documents and Electronic Pre-qualification application; appraisal of prequalification results, bidder selection results; project management consulting, contract management consulting, and other consulting services related directly to the bidding package. |
31. Preferences in Bidder Selection | 31.1. Preference Principle: The bidder will be granted a preference if they provide goods where the cost of domestic production accounts for 30% or more. 31.2. For information technology software products, the criteria for domestic software products to be eligible for preference shall follow the regulations of the law on information technology, without requiring the domestic production cost ratio as stipulated in Section 31.3 Electronic Competitive Dialogue and Negotiated Tendering; 31.3. The preference calculation is conducted during the evaluation of the Electronic Pre-qualification application for comparison and ranking of Electronic Pre-qualification applications: Goods are only eligible for preference when the bidder can prove that the cost of domestic production accounts for 30% or more of the total price of the goods. The determination of goods produced in Vietnam can be done using the direct or indirect formulas below: Direct formula: D (%) = G*/G x 100% Indirect formula: D (%) = (G - C)/G x 100% Where: G*: Domestic production cost G: The bid price of the goods in the bidding document, excluding tax; for manufacturers, G is the ex-works price (EXW) of the goods. C: The value of imported costs, excluding taxes and fees related to imports. D: The percentage of domestic production cost of the goods. D ≥ 30% means the goods are eligible for preference as stipulated in Articles 5, 6, 7, 8, 9, and 10 of Decree No. 24/2024/NĐ-CP. 31.4. The method of calculating preferences is carried out in accordance with Electronic Bidding Document List. 31.5. The bidder must declare information about the type of goods eligible for preference according to Forms 15A, 15B, and 15C in Chapter IV to serve as a basis for considering and evaluating the preference. If the bidder does not declare, their goods are considered ineligible for preference. 31.6. If the goods offered by the bidders are not eligible for preference, the preference evaluation and determination will not be carried out. |
32. Document Comparison | 32.1. The invited bidder for document comparison must submit a set of documents proving eligibility, capacity, and experience to the Procuring Entity for comparison with the information declared in the Electronic Pre-qualification application, including: a) The original bid guarantee (in the case of a letter of guarantee or insurance certificate in paper form) or cash or certified check as stipulated in Section 18.8 Electronic Competitive Dialogue and Negotiated Tendering; b) For bidders who self-update tax data on the system from 2021 onwards (not automatically extracted by the system), documents proving tax declaration and payment for the most recent year consistent with the tax data on the electronic tax system. In cases where the bidder's data is extracted by the system from the electronic tax system, the bidder is not required to present documents for verification; c) For bidders who self-update financial data on the system from 2021 onwards (not automatically extracted by the system), documents proving the financial status as per Form 08 Chapter IV consistent with the financial data on the electronic tax system. In cases where the bidder's data is extracted by the system from the electronic tax system, the bidder is not required to present documents for verification; d) Documents proving similar contracts declared and attached in the Electronic Pre-qualification application (contracts, acceptance minutes, liquidation, invoice information as per legal requirements…); documents proving production capacity (for bidders who are manufacturers); đ) Documents proving the ability to mobilize personnel, diplomas, certificates of personnel declared in the Electronic Pre-qualification application; e) Other documents (if any). 32.2. Bidders with compliant documents will proceed to contract negotiation (if any) and award consideration. If tax data or revenue self-updated by the bidder from 2021 onwards does not match the data on the electronic tax system, resulting in the distortion of the bidding outcome, the bidder will be disqualified and deemed to have engaged in fraudulent activity as stipulated in point b, Section 4.4 Electronic Competitive Dialogue and Negotiated Tendering. 32.3. In cases where contract negotiation is applicable under Section 33 Electronic Competitive Dialogue and Negotiated Tendering, the document comparison will take place during the contract negotiation. If the invited bidder for document comparison does not meet the requirements of the Electronic Bidding Document, the next-ranked bidder will be invited for document comparison. |
33. Contract Negotiation | 33.1. Contract negotiation is conducted in accordance with Electronic Bidding Document List; 33.2. Contract negotiation must be based on the following: a) The Electronic Pre-qualification application evaluation report; b) The Electronic Pre-qualification application and any clarifying documents (if any) from the bidder; c) The Electronic Bidding Document including the general and specific conditions of the contract and any clarifying or amendment documents related to the Electronic Bidding Document (if any). 33.3 Principles of contract negotiation: a) No negotiation for contents that the bidder offered as per the requirements of the Electronic Bidding Document. b) Unit prices determined during the financial evaluation stage cannot be changed. 33.4. Contents of contract negotiation: a) Items that are not detailed, unclear, or inconsistent between the Electronic Bidding Document and the Electronic Pre-qualification application or between different parts of the Electronic Pre-qualification application, which could lead to disputes or affect the responsibilities of the parties during contract execution; b) Proposals for changes or alternative technical solutions from the bidder if allowed in the Electronic Bidding Document as per Section 12.1 Electronic Competitive Dialogue and Negotiated Tendering; c) Negotiation on key personnel: During the negotiation process, the bidder cannot change key personnel (personnel proposed in the Electronic Pre-qualification application or those already replaced once according to Clause 2, Article 27 of Decree No. 24/2024/NĐ-CP), unless the evaluation period extends beyond the expected timeline or due to force majeure, in which the key personnel proposed cannot participate in the contract execution. In this case, the bidder may replace personnel but must ensure that the replacement personnel have equivalent or higher qualifications, experience, and capacity compared to the proposed personnel, and the bid price cannot be changed.; d) Negotiation on issues arising during the bidder selection process (if any) to finalize the detailed contents of the package; đ) Negotiation on minor errors as stipulated in Section 29 Electronic Competitive Dialogue and Negotiated Tendering; e) In cases where Section 13.5 Electronic Bidding Document List requires the bidder to quote according to Form 12.2 (12.2A, 12.2B, or 12.2C) Chapter IV, the negotiation must clarify the taxes the bidder must pay as per tax law, including: import-related taxes, fees, special consumption tax (if any), VAT, and other tax-related matters. The tax rate and amount the bidder must pay must be clearly stated in the contract. đ) Negotiation on other necessary contents. 33.5. During the contract negotiation, the parties will finalize the draft contract documents, the specific conditions of the contract (Specific Terms and Conditions of the Contract), and appendices including detailed lists of scope, pricing tables, and supply schedules. 33.6. If contract negotiation is unsuccessful, the Procuring Entity will report to the Investor for consideration and decision to invite the next-ranked bidder for negotiation. If negotiations with the next-ranked bidders are unsuccessful, the Procuring Entity will report to the Investor for consideration and decision to cancel the bidding as stipulated in point a, Section 35.1 Electronic Competitive Dialogue and Negotiated Tendering. 33.7. If due to objective reasons or force majeure, the bidder is unable to negotiate the contract directly with the Procuring Entity, the Procuring Entity may consider conducting the negotiation online. |
34. Conditions for Bid Approval | A bidder will be considered and proposed for approval when the following conditions are met: 34.1. A valid Electronic Pre-qualification application as per Section 1 Chapter III; 34.2. Sufficient capacity and experience as per Section 2 Chapter III; 34.3. A technical proposal that meets the requirements as per Section 3 Chapter III; 34.4. Meets the conditions stipulated in Electronic Bidding Document List; 34.5. The proposed bid price (including taxes, fees, charges (if any)) does not exceed the approved package price. In cases where the package estimate is lower or higher than the approved package price, the estimate will replace the package price as the basis for bid approval. |
35. Bid Cancellation | 35.1. The cases for bid cancellation include: a) All Electronic Pre-qualification application fail to meet the requirements of Electronic Bidding Document; b) Changes in objectives, investment scope in the approved investment decision that alter the workload, evaluation criteria stated in Electronic Bidding Document; c) Electronic Bidding Document does not comply with the provisions of the Law on Bidding and other relevant legal regulations, resulting in the selected bidder being unable to fulfill the package requirements; d) The winning bidder engages in prohibited conduct as stipulated in Article 16 of the Law on Bidding; đ) Other entities or individuals, apart from the winning bidder, engage in prohibited conduct as stipulated in Article 16 of the Law on Bidding, leading to a distorted bidding result. 35.2. Organizations or individuals that violate the law on bidding, leading to bid cancellation as stipulated in points c, d, and đ of Section 35.1 Electronic Competitive Dialogue and Negotiated Tendering, must compensate related parties and will be dealt with according to the law. 35.3. In the case of bid cancellation as per this Section, within 05 working days, the Investor and the Procuring Entity must return or release the bid security for the bidder who submitted the original bid security, except in cases where the bidder violates the provisions at points d and đ of Section 35.1 Electronic Competitive Dialogue and Negotiated Tendering. |
36. Announcement of Bid Results | 36.1. The Investor shall publish the bid result announcement on the System along with the Electronic Pre-qualification application evaluation report within 05 working days from the date of approval of the bid result. The bid result announcement includes the following: a) Information about the bidding package: - E-TBMT number; - Name of the bidding package; - The approved package price or estimate (if any); - Name of the Investor; - Procurement method; - Contract type; - Package implementation time; b) Information about the winning bidder: - Tax code; - Bidder's name; - Bid price; - Bid price after discount (if any); - Technical score (if any); - Evaluation price (if any); - Winning bid price; - Package implementation time; - Contract implementation time. c) For each type of goods or equipment in the package, the Investor must publish the following information: - Name of the goods; - Capacity; - Features, technical specifications; signs, models, brands; - Origin; - Winning bid unit price. d) List of unsuccessful bidders and a summary of the reasons for not being selected for each bidder. 36.2. In case there is a request to explain the specific reasons why a bidder was not selected, the bidder submits a request on the System or directly meets the Investor. The Investor is responsible for responding to the bidder’s request within 02 working days from the date of receiving the bidder's request. 36.3. In the event of bid cancellation under point a Section 35.1 Electronic Competitive Dialogue and Negotiated Tendering, the reason for the cancellation must be clearly stated in the bid result announcement and on the System. |
37. Changes in the Quantity of Goods and Services | 37.1. At the time of contract award, the Investor has the right to increase or decrease the quantity of goods and services stated in Chapter IV, provided that such changes do not exceed the percentage stipulated in Electronic Bidding Document List and that there are no changes to unit prices or other terms and conditions of the Electronic Pre-qualification application and Electronic Bidding Document. The increase or decrease in quantity shall not exceed 10%. 37.2. Option to Purchase Additional Goods: Before the contract expires, the Investor and the bidder may agree to purchase additional quantities of goods and services beyond what is stated in Chapter IV, provided that such an increase does not exceed the percentage stipulated in Electronic Bidding Document List and complies with Clause 8 Article 39 of the Law on Bidding. The additional work must be similar to the work specified in the signed contract and already have an established unit price. The additional quantity of goods and services shall not be used to evaluate the bidder’s capacity and experience. In the case of a consortium, the allocation of responsibilities for the additional work shall follow the original work division in the contract unless otherwise agreed by the parties. |
38. Notification of Electronic Pre-qualification application Acceptance and Contract Award | After the Investor publishes the announcement of the bidding result, the Procuring Entity shall send the notification of Electronic Pre-qualification application acceptance and contract award through the System, including the requirements for contract performance security, the time for finalizing and signing the contract in accordance with Form No. 17 Part 4 to the winning bidder. The notification of Electronic Pre-qualification application acceptance and contract award is part of the contract documentation. If the winning bidder does not complete, sign the contract, or fails to provide the contract performance security within the timeframe specified in the notification of Electronic Pre-qualification application acceptance and contract award, the bidder will be disqualified and will not be refunded the bid security as stipulated in point b Section 18.5 Electronic Competitive Dialogue and Negotiated Tendering. The timeframe mentioned in the notification of Electronic Pre-qualification application acceptance and contract award is calculated from the day the Procuring Entity sends the notification to the winning bidder via the System. |
39. Conditions for Contract Signing | 39.1. At the time of contract signing, the selected bidder’s Electronic Pre-qualification application must still be valid. 39.2. At the time of contract signing, the selected bidder must ensure compliance with the technical and financial capacity requirements to execute the package in accordance with the Electronic Bidding Document. If it is found that the bidder no longer meets the basic technical and financial capacity requirements as stipulated in the Electronic Bidding Document, the Investor will refuse to sign the contract with the bidder. The Investor will cancel the decision to approve the bidding result, the notification of Electronic Pre-qualification application acceptance, and the previous contract award, and invite the next-ranked bidder for document comparison and contract negotiation (if applicable). 39.3. The Investor must ensure conditions regarding advance capital, payment capital, and other necessary conditions to implement the package on schedule. |
40. Contract Performance Security | 40.1. Before signing the contract or before the contract takes effect, the winning bidder must provide contract performance security as stipulated in Section 5 E-ĐKC Chapter VI. If a performance guarantee letter is used, it must follow the template in Part 4 or another template approved by the Investor. 40.2. The bidder will not be refunded the contract performance security in the following cases: a) Refusal to perform the contract when the contract takes effect; b) Breach of contract terms; c) Delayed performance of the contract due to the bidder’s fault but refusal to extend the validity of the contract performance security. |
41. Addressing Complaints in Bidding | 41.1. If a bidder, agency, or organization believes that its legal rights and interests are affected, they may file a complaint to the competent authority or the Investor to review issues during the bidder selection process or the bidding result, in accordance with Articles 89, 90, and 91 of the Law on Bidding. 41.2. If filing a complaint with the Investor, the bidder, agency, or organization submits the complaint directly via the System. If filing a complaint with the Competent Authority, the bidder submits the complaint to the address specified in Electronic Bidding Document List. |
42. Monitoring the Bidder Selection Process | If the bidder detects any behavior or content that violates the provisions of the Law on Bidding, the bidder must notify the organization or individual responsible for monitoring in accordance with Electronic Bidding Document List. |
E-BDDT 1.1 | Name of Investor: ___ [Automatically extracted by the system]. |
E-BDDT 1.2 | Package name: ___ [Automatically extracted by the system]. Project/Procurement estimate name: ___ [Automatically extracted by the system]. Quantity, part number of package: According to section E-BDDT 18.2 of this Chapter. |
E-BDDT 3 | Funding source: ___ [According to E-TBMT]. |
E-BDDT 5.1 (c) | Ensuring competition in bidding as follows: - Bidders do not hold more than 30% shares or contributed capital with ___ [fully state the name and address of the Investor, Bidder], except in the following cases: (i) The bidder is a member company, subsidiary of a state-owned group, corporation with major business areas relevant to the nature of the bidding package of that group, corporation. (ii) The bidder is a parent company, subsidiary, member company in an economic group, state-owned corporation where the products and services of the package belong to the main business sector of the economic group or corporation and the package belongs to the subsidiary or member company. - Bidders do not hold shares or contributed capital with consulting contractors; and do not jointly hold more than 20% shares or contributed capital of an organization or individual with each side, specifically as follows: + Consultant for design development:___[fully state the name and address of the consulting unit (if any)]; + Consultant for valuation:___[fully state the name and address of the consulting unit (if any)]; + Consultant for contract supervision and inspection:___[fully state the name and address of the consulting unit (if any)]; + Consultant for developing Electronic Bidding Document:___[fully state the name and address of the consulting unit (if any)]; + Consultant for appraisal of Electronic Bidding Document:___[fully state the name and address of the consulting unit (if any)]; + Consultant for evaluation of Electronic Pre-qualification application:___[fully state the name and address of the consulting unit (if any)]; + Consultant for appraisal of contractor selection results:___[fully state the name and address of the consulting unit (if any)]; + Project management, contract management, and other consulting services where these consulting services have work directly related to the package:___[fully state the name and address of the consulting unit (if any)]; Bidders do not belong to the same organization or agency directly managing the consulting contractors (listed above)[5]. - Bidders do not belong to the same organization or agency directly managing the Investor, the inviting party, except in cases where the bidder is a public administrative unit under a state management agency with assigned functions and duties appropriate to the nature of the bidding package of that state management agency. - Public administrative units and enterprises with the same managing agency do not need to meet legal and financial independence requirements between the bidder and the investor or inviting party when participating in each other's packages. The shareholding ratio between the parties is determined at the closing time and according to the ratio stated in the business registration certificate, establishment decision, and other equivalent documents. In cases where bidders participate as a joint venture or consulting contractors are selected as a joint venture, the capital ownership ratio of other organizations or individuals in the joint venture is determined by the following formula: Capital ownership ratio =i=1nXi x Yi Where: Xi: Capital ownership ratio of other organizations or individuals in the i-th member of the joint venture; Yi: Percentage (%) of the work volume of the i-th member of the joint venture in the joint venture agreement; n: Number of members participating in the joint venture |
Electronic Competitive Dialogue and Negotiated Tendering 5.4 | [Based on the contractor selection plan or the decision of the authorized person, the investor records “Applicable” or “Not Applicable”. In case of applicability, the contractor must provide documents to prove the procurement of goods from a contractor with 50% or more employees being people with disabilities, war veterans, ethnic minorities who have employment contracts with a duration of 03 months or more, and the contract remains valid at the time of bid submission to be eligible to participate in the bidding. |
Electronic Competitive Dialogue and Negotiated Tendering 7.5 | Pre-bid conference: _____ [Record “Yes” or “No”. In case of "Yes", specify the time, location of the pre-bid conference, and the contact number of the person responsible for organizing the pre-bid conference] |
Electronic Competitive Dialogue and Negotiated Tendering 8 | Electronic Pre-qualification application submission fee:____ System automatically extracts according to the current regulations. |
Electronic Competitive Dialogue and Negotiated Tendering 10.3 | The contractor must submit the following documents along with the Electronic Pre-qualification application:__[specify the names of other necessary documents that the contractor needs to submit with the Electronic Pre-qualification application according to the requirements based on the scale and nature of the package and without restricting the contractor's participation. If not required, clearly state “not required”]. |
Electronic Competitive Dialogue and Negotiated Tendering 12.1 | The contractor____ [specify “is allowed” or “is not allowed”] to submit alternative technical proposals.. [If only allowed to propose alternative technical solutions for specific portions of the package, clearly specify which portions the contractor is permitted to submit alternative technical solutions for] |
Electronic Competitive Dialogue and Negotiated Tendering 13.5 | Pricing: ___ (Employer to specify one of the two following methods: - As per Form No. 12.1 (12.1A or 12.1B or 12.1C) Chapter IV - As per Form No. 12.2 (12.2A or 12.2B or 12.2C) Chapter IV) |
Electronic Competitive Dialogue and Negotiated Tendering 15.8 | Expected lifetime of the goods (for material and spare parts requirements):___ [specify the expected lifetime of the goods in the initial phase]. |
Electronic Competitive Dialogue and Negotiated Tendering 16.2 | Document requirements to prove the contractor's capability to execute the contract: ___ [Employer to specify “Not required for sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents” or “Required for sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents” based on the nature of the goods as follows: For standard, market-available, standardized goods with warranties as per manufacturer regulations, the contractor is not required to submit sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents. For unique, complex goods requiring the manufacturer or supplier's confirmation to ensure feasibility in supplying goods if the contractor wins the bid, and linking to the manufacturer's responsibility for after-sales services like installation, maintenance, training, and related services, the Electronic Bidding Document may require the participating contractor to provide sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents. If there is a requirement for permits or sales authorizations from manufacturers, distributors or partnership certificates or equivalent documents, Employer to specify the following: “In case the contractor does not manufacture or produce the goods offered in their Electronic Pre-qualification application, the contractor must submit sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents to demonstrate that the contractor is duly authorized by the manufacturer or distributor to supply these goods in Vietnam. The contractor may attach or not attach this document in the Electronic Pre-qualification application, even if the Electronic Bidding Document requires the contractor to have this document. The contractor's failure to attach the above document is not grounds for disqualification. The contractor will continue to be considered, evaluated, and approved to win the bid. In case the contractor wins the bid, the contractor must present the above document before signing the contract and is responsible for the accuracy of the documents and information they provide. If the contractor fails to present the sales permits, sales authorizations from manufacturers or distributors, partnership certificates, technical support or warranty commitments from manufacturers or distributors, or other equivalent documents to sign the contract, the next-ranked contractor will be invited for document verification and contract negotiation (if applicable).”]. |
Electronic Competitive Dialogue and Negotiated Tendering 17.1 | The validity period of the Electronic Pre-qualification application is: ≥ ____ days [extracted from E-TBMT], from the date of bid closing. |
Electronic Competitive Dialogue and Negotiated Tendering 18.2 | Bid security details: - Bid security value: [Extracted from E-TBMT]. - Bid security percentage in case of centralized procurement packages based on supply capability: _____[Extracted from E-TBMT following the principle of minimum bid security value that the contractor must comply with, equal to % of the reduced bid price (if applicable)]. For contractors listed under Clause 1, Article 18 of Decree No. 24/2024/NĐ-CP and published on the National Bidding Network System, bid security measures must be taken with a value three times the required value above, effective for two years from the last occurrence of these acts. In case of a joint venture, members committing acts specified in Clause 1, Article 18 of Decree No. 24/2024/NĐ-CP must take bid security measures with a value three times the corresponding bid security value based on the share of work undertaken by that member within the joint venture for two years from the last occurrence of these acts. - Bid security validity period: [Extracted from E-TBMT] (If the package is divided into multiple parts, the bid security value for each part must be clearly stated). |
Electronic Competitive Dialogue and Negotiated Tendering 18.4 | Bid security refund or release period for unsuccessful contractors: _____ days, from the date the bid selection result is approved [specify the exact number of days but not exceeding 14 days from the date the bid selection result is approved]. |
Electronic Competitive Dialogue and Negotiated Tendering 22.1 | Electronic Pre-qualification application evaluation method: - Capacity and experience evaluation: Pass/Fail. - Technical evaluation:____ [Based on the scale and nature of the package, apply either the “Pass/Fail” method or the “Scoring” method]. - Financial evaluation____ [Based on the scale and nature of the package, apply the lowest price method, the evaluated price method, or the combined technical and price method suitable to the evaluation standards specified in Chapter III].For centralized procurement applying contractor selection based on supply capability, the system extracts: the lowest price method. |
Electronic Competitive Dialogue and Negotiated Tendering 24.1 | Implementation method: ___ [The system automatically displays as follows: - If "According to Form No. 12.1 (12.1A or 12.1B or 12.1C) Chapter IV" is selected in Section 13.5 Electronic Bidding Document List, it displays: "The comparison and ranking of Electronic Pre-qualification application is determined based on the bid price, including all taxes, fees, and charges (if any)." - If "According to Form No. 12.2 (12.2A or 12.2B or 12.2C) Chapter IV" is selected in Section 13.5 Electronic Bidding Document List , it displays: "The comparison and ranking of Electronic Pre-qualification application is determined based on the bid price, excluding taxes, fees, charges related to importation, special consumption tax (if any), and VAT"]. |
Electronic Competitive Dialogue and Negotiated Tendering 24.2 | Contractor ranking: [The system extracts when the evaluation method is selected in Section 22.1 Electronic Bidding Document List as follows: - Select the lowest price method to extract: ___ + If "According to Form No. 12.1 (12.1A or 12.1B or 12.1C) Chapter IV" is selected in Section 13.5 Electronic Bidding Document List, it displays “the contractor with the lowest bid price after subtracting the discount value (if any), adding the preferential value (if any), ranked first"”; + If "According to Form No. 12.2 (12.2A or 12.2B or 12.2C) Chapter IV" is selected in Section 13.5 Electronic Bidding Document List , it displays "the contractor with the bid price excluding taxes, fees, charges related to importation, special consumption tax (if any), VAT, after subtracting the discount value (if any), adding the preferential value (if any), ranked first"; - Select the evaluated price method to extract: “the contractor with the lowest evaluated price is ranked first”. - Select the combined technical and price method to extract: “the contractor with the highest combined score is ranked first”]. |
Electronic Competitive Dialogue and Negotiated Tendering 30.2 | Maximum value for subcontractors: ____ of the contractor's bid price [If there are related service requirements specified in Form No. 01D Chapter IV, the Employer may allow the contractor to use subcontractors. Declaration of subcontractor usage shall be made according to Form No. 09A Chapter IV. Depending on the scale and nature of the package, the Employer specifies the percentage]. |
Electronic Competitive Dialogue and Negotiated Tendering 31.4 | Preference calculation: __ a) Preference for goods originating in Vietnam with a domestic production cost ratio of less than 50% and no goods with a domestic production cost ratio of 50% or more is determined as follows: - Select the lowest price method to extract: “Goods not subject to preference must be added a sum of 7.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking”; - Select the evaluated price method to extract: “Goods not subject to preference must be added a sum of 7.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking”; - Select the combined technical and price method to extract: “Goods subject to preference are awarded preference points added to the combined score according to the following formula: Preference points = 7.5% x (preference goods price/bid price after error correction, deviation adjustment, and discount deduction (if any)) x combined score Where: Preference goods price is the bid price after error correction, deviation adjustment, and discount deduction (if any) of goods subject to preference”. For cases where the contractor offers goods originating from Vietnam with a domestic production cost ratio of less than 50% but the production facility has at least 50% of its workforce being disabled, wounded soldiers, or ethnic minorities with labor contracts for at least 3 months duration during the contract performance period and the contract is still valid at the time of bid closing, the preference coefficient is 10% instead of 7.5%. b) Preference for goods originating from Vietnam with a domestic production cost ratio of 50% or more is determined as follows: [- Select the lowest price method to extract: “Goods not subject to preference must be added a sum of 10% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of less than 50% must be added a sum of 2.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking; goods originating from Vietnam with a domestic production cost ratio of less than 50% but the production facility has at least 50% of its workforce being disabled, wounded soldiers, or ethnic minorities with labor contracts for at least 3 months duration during the contract performance period and the contract is still valid at the time of bid closing, will not need to add money to the contractor's bid price for comparison and ranking”; - Select the evaluated price method to extract: “Goods not subject to preference must be added a sum of 10% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of less than 50% must be added a sum of 2.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking; goods originating from Vietnam with a domestic production cost ratio of less than 50% but the production facility has at least 50% of its workforce being disabled, wounded soldiers, or ethnic minorities with labor contracts for at least 3 months duration during the contract performance period and the contract is still valid at the time of bid closing, will not need to add money to the evaluated price of the contractor for comparison and ranking”; - Select the combined technical and price method to extract: “Goods subject to preference with a domestic production cost ratio of 50% or more are awarded preference points added to the combined score according to the following formula: Preference points = 10% x (preference goods price/bid price after error correction, deviation adjustment, and discount deduction (if any)) x combined score Where: Preference goods price is the bid price after error correction, deviation adjustment, and discount deduction (if any) of goods with a domestic production cost ratio of 50% or more. In the case of goods subject to preference with a domestic production cost ratio of less than 50%, apply the formula stipulated at point c, clause 1, Article 5 of Decree No. 24/2024/NĐ-CP; goods originating from Vietnam with a domestic production cost ratio of less than 50% but the production facility has at least 50% of its workforce being disabled, wounded soldiers, or ethnic minorities with labor contracts for at least 3 months duration during the contract performance period and the contract is still valid at the time of bid closing, the preference coefficient is 10%; For cases where the contractor offers goods originating from Vietnam with a domestic production cost ratio of 50% or more but the production facility has at least 50% of its workforce being disabled, wounded soldiers, or ethnic minorities with labor contracts for at least 3 months duration during the contract performance period and the contract is still valid at the time of bid closing, the preference coefficient is 12% instead of 10%. c) Innovative products originating from Vietnam are awarded preference as follows: [- Select the lowest price method to extract: “Goods not subject to preference must be added a sum of 15% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of less than 50% must be added a sum of 7.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of 50% or more must be added a sum of 5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the bid price after error correction, deviation adjustment, and discount deduction (if any) of the contractor for comparison and ranking”; - Select the evaluated price method to extract: “Goods not subject to preference must be added a sum of 15% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of less than 50% must be added a sum of 7.5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking; goods subject to preference with a domestic production cost ratio of 50% or more must be added a sum of 5% of the bid price after error correction, deviation adjustment, and discount deduction (if any) of that good to the evaluated price of the contractor for comparison and ranking”; - Select the combined technical and price method to extract: “Innovative products originating from Vietnam are awarded preference points added to the combined score according to the following formula: Incentive Points = 15% x (incentive goods price/bid price after error correction, adjustment for discrepancies, excluding discount value (if any)) x aggregate score Where: Incentive goods price is the bid price after error correction, adjustment for discrepancies, excluding discount value (if any) of goods that are innovative products of Vietnamese origin”] For goods that are not innovative products of Vietnamese origin, in the case where the bidder offers goods of Vietnamese origin with a domestic production cost rate of less than 50%, the 15% coefficient is replaced with 7.5% in the incentive calculation; for goods of Vietnamese origin with a domestic production cost rate of 50% or more, the 15% coefficient is replaced with 10% in the incentive calculation. d) Innovative products are eligible for incentives as stipulated in point c of this clause if one of the following conditions is met: - The product is listed in the high-tech categories prioritized for investment and development or the high-tech products encouraged for development as per the Prime Minister’s decision; - Products formed from scientific and technological achievements of scientific and technological enterprises as per the law on scientific and technological enterprises; - Products created based on patents, integrated circuit layout designs, plant varieties of the bidder, protected within a period not exceeding 05 years from the date of issuance, or software programs of the bidder within a period not exceeding 05 years from the date of copyright registration certificate issuance; - Semiconductor chips; - Products awarded the Ho Chi Minh Prize or State Prize for Science and Technology as per the law on science and technology awards; - New products formed from research and development results at one of the facilities of the National Innovation Center; - New products formed from scientific research and technological development results as per the law on technology transfer. Innovative products as stipulated in this clause are eligible for incentives within a period of 06 years from the first production and meeting market-entry requirements. |
Electronic Competitive Dialogue and Negotiated Tendering 34.4 | [The system extracts when selecting the evaluation method at Section 22.1 Electronic Bidding Document List as follows: - Select the lowest price method, the system extracts: “the bidder with the lowest bid price after deducting the discount value (if any)”; - Select the evaluated price method, the system extracts: “the bidder with the lowest evaluated price”; - Select the combined technical and price method, the system extracts: “the bidder with the highest aggregate score”]. For the package divided into several parts (lots), the evaluation of the E-Bidding Document and contract awarding will be based on ensuring that: the proposed contract price of the entire package does not exceed the approved package price without comparing with the estimated cost of each part. For centralized procurement applying bidder selection based on supply capability, [the system extracts as follows: “bidders with bid prices after deducting the discount value (if any) calculated per unit of the item the bidder bids for in ascending order until the total quantity of goods offered by successful bidders equals the quantity of goods stated in the E-Bidding Documents”.] |
Electronic Competitive Dialogue and Negotiated Tendering 37.1 | Maximum increase in volume ratio is: ___ [enter percentage but not exceeding 10%]; Maximum decrease in volume ratio is: ___ [enter percentage but not exceeding 10%]. |
Electronic Competitive Dialogue and Negotiated Tendering 37.2 | - Additional purchase option: _____ [enter "applicable" or "not applicable" according to the approved contractor selection plan. If "applicable" then clearly specify the percentage of volume, quantity of additional purchase but not exceeding 30% of the volume of corresponding goods, services in Chapter IV and in accordance with the contractor selection plan]; - Maximum additional purchase ratio is:___[enter percentage]. |
Electronic Competitive Dialogue and Negotiated Tendering 41.2 | - Authorized person:_________ [enter full name of the authorized person] + Address:_________ [enter full address, phone number, fax number of the authorized person]; + E-mail:__________ [enter email of the authorized person to receive complaints from the contractor]. - Standing unit assisting the Chairman of the Advisory Council for Complaint Resolution: + Address:_________ [enter full name, address, phone number, fax number of the standing unit assisting the Chairman of the Advisory Council for Complaint Resolution]; + E-mail:__________ [enter email of the standing unit assisting the Chairman of the Advisory Council for Complaint Resolution to receive complaints from the contractor]. |
Electronic Competitive Dialogue and Negotiated Tendering 42 | Address of the organization or individual performing the supervisory task:____[enter full name, address, phone number, fax number of the organization or individual assigned by the authorized person to perform the supervision of contractor selection for the package/project (if any)]. |
Capacity and Experience Criteria | Compliance Requirements | Required Documents to Submit | ||||
No. | Description | Requirements | Independent Contractor | Joint Venture Contractor | ||
Total of Joint Venture Members | Each Joint Venture Member | |||||
1 | History of Non-Completion Due to Contractor's Fault | From January 01, _____(2) to the bid closing date, the contractor must not have any contracts for the supply of goods, EPC, EP, PC, or turnkey projects that were not completed due to the contractor's fault(3). | Must meet this requirement | Not applicable | Must meet this requirement | Form No. 07 |
2 | Compliance with Tax Declaration and Payment Obligations | The contractor must have fulfilled the tax declaration and payment obligations(4) for the most recent fiscal year as of the bid closing date. | Must meet this requirement | Not applicable | Must meet this requirement | Bid Commitment |
3 | Financial Capability | |||||
3.1 | Financial Performance(5) | The net asset value of the contractor in the most recent fiscal year relative to the bidding closure must be positive. (Net asset value = Total assets - Total liabilities) | Must meet this requirement | Not applicable | Must meet this requirement | Form No. 08 |
3.2 | Average Annual Revenue (excluding VAT) | The average annual revenue (excluding VAT) of the contractor for the ___ (6) most recent fiscal years from the bid closing date must be at least ____(7) VND. For centralized procurement packages, selecting contractors based on supply capacity, the revenue is determined corresponding to the bid price using coefficient “k”____. | Must meet this requirement | Must meet this requirement | Not applicable | Form No. 08 |
4 | Experience in Executing Similar Goods Supply Contracts | The contractor has completed at least one similar contract as the main contractor (independently or as a joint venture member) or as a subcontractor(8) within the period from January 1, ____(9) to the bid closing date. In which the similar contract is defined as: - Of similar nature: ___(10); - Of minimum scale (value): ___ VND (11). | Must meet this requirement | Must meet this requirement | Must meet the requirement (equivalent to the portion of the work undertaken) | Form No. 05A |
5 | Capability for Warranty, Maintenance, Repair, and Provision of Spare Parts or Other After-Sales Services(12) | The contractor must demonstrate the capability to perform warranty, maintenance, repair, provision of spare parts, or provision of after-sales services in one of the following ways: - The contractor commits to having the capacity to independently perform the warranty, maintenance, repair, provision of spare parts, or provision of after-sales services as required by the Electronic Bidding Document. - The contractor signs a framework agreement with an entity capable of performing warranty, maintenance, repair, provision of spare parts, or provision of after-sales services as required by the Electronic Bidding Document. | Must meet this requirement | Must meet this requirement | Not applicable | Commitment or Framework Agreement |
No. | Goods Category | HS Code | Estimated Value (VND) |
1 | Goods A | 9025 | 10,000,000,000 |
2 | Goods B | 9030 | 8,000,000,000 |
3 | Goods C | 9030 | 12,000,000,000 |
No. | Part Name | Scope of Supply | HS Code | Estimated Value (VND) |
1 | Lot No. 01 | Goods A | 9025 | 10,000,000,000 |
2 | Lot No. 02 | Goods B | 9030 | 20,000,000,000 |
3 | Lot No. 03 | Goods C | 9025 | 30,000,000,000 |
Criteria for capacity and experience | Requirements to comply with | Documents to submit | ||||
No. | Description | Requirements | Independent contractor | Consortium contractor | ||
Total consortium members | Each consortium member | |||||
1 | History of contract non-completion due to contractor's fault | From January 1, ___(2) until the bid closing date, the contractor has no incomplete contracts for the supply of goods, EPC, EP, PC, or turnkey projects due to the contractor's fault(3). | Must meet this requirement | Not applicable | Must meet this requirement | Form No. 07 |
2 | Fulfillment of tax declaration and payment obligations | The contractor has fulfilled tax declaration and payment obligations(4) for the most recent fiscal year relative to the bid closing date. | Must meet this requirement | Not applicable | Must meet this requirement | Content of the commitment in the bid |
3 | Financial capacity(5) | |||||
3.1 | Financial performance(6) | The contractor's net worth in the most recent fiscal year relative to the bid closing date must be positive. (Net worth = Total assets - Total liabilities) | Must meet this requirement | Not applicable | Must meet this requirement | Form No. 08 |
3.2 | Average annual revenue (excluding VAT)(7) | The average annual revenue (excluding VAT) of ___(8) for the most recent fiscal year relative to the bid closing date must be at least ____(9) VND. For the concentrated procurement package applying contractor selection based on supply capability, revenue is determined according to the bid price using coefficient “k” ____. | Must meet this requirement | Must meet this requirement | Not applicable | Form No. 08 |
4 | Production capacity of goods(10) | The contractor must provide documentation proving their production capacity for the goods included in the package meets the requirements in one of the following ways: - The design capacity of the factory or production line is at least: ___ products/month; Or: - The highest production output of one month in the last five years up to the bid closing date is at least: ___ products. For the concentrated procurement package applying contractor selection based on supply capability, production capacity is determined according to the volume and quantity that the contractor can provide (not necessarily corresponding to the tendered volume) using coefficient “k” ____. | Must meet this requirement | Must meet this requirement | Must meet the requirement (equivalent to the part of the work undertaken) | Form No. 05B |
5 | Warranty capability, supply of spare parts, or provision of other after-sales services(11) | The contractor must prove the ability to fulfill warranty obligations, supply spare parts, or provide after-sales services in one of the following ways: - The contractor commits to having the capacity to fulfill warranty obligations, supply spare parts, or provide after-sales services as required by the Electronic Bidding Document. - The contractor signs a principle contract with an entity capable of fulfilling warranty obligations, supplying spare parts, or providing after-sales services as required by the Electronic Bidding Document. | Must meet this requirement | Must meet this requirement | Not applicable | Commitment from the contractor or principle contract |
No. | Lot Code | Lot Name | Estimated Value of Each Lot (VND) | Average Annual Revenue (excluding VAT)* (VND) | HS Code | Scope of Similar Contracts (applicable for trading contractors)** (VND) | Production Capacity (applicable for manufacturers) | Warranty and Maintenance Capability |
(1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) |
No. | Job Position | Quantity | Experience in Similar Work | Certificates/Professional Qualifications(2) |
1 | minimum__years or minimum___contracts | |||
2 | minimum__years or minimum___contracts | |||
3 | ||||
… |
Glowest Current technical scoreunder consideration Composite scoreunder consideration = (( ___________ × T + _________________________ × K) × 100) + ΔƯĐ Gunder consideration Highest technical score |
No. | Form | Method of Implementation | Responsibility for Implementation | |
Bidder | Contractor | |||
1 | Form No. 01A. Scope of Supply of Goods (Applicable for Lump Sum Contracts) | Webform | X | |
2 | Form No. 01B. Scope of Supply of Goods (Applicable for Unit Price Contracts) | X | ||
3 | Form No. 01C. Scope of Supply of Goods (Applicable for Mixed Contracts) | X | ||
4 | Form No. 01D. Related Services | X | ||
5 | Form No. 01E. Materials and Spare Parts | X | ||
I | Sample of Technical Proposal Documentation | |||
6 | Form No. 02A. Bid Submission Form for Electronic Technical Proposal (Applicable for Contractor as Organization) | X | ||
7 | Form No. 02B. Bid Submission Form for Electronic Technical Proposal (Applicable for Contractors who are Individuals or Groups of Individuals Producing Innovative Products) | X | ||
8 | Form No. 02C. Agreement Document (Applicable for Groups of Individuals Producing Innovative Products) | X | ||
9 | Form No. 03. Joint Venture Agreement | X | ||
10 | Form No. 04A. Bid Guarantee (Applicable for Independent Contractors) | Scan and attach | X | |
11 | Form No. 04B. Bid Guarantee (Applicable for Joint Venture Contractors) | X | ||
12 | Form No. 05A. Similar Contract Performed by Contractor (Applicable for Commercial Contractors) | Webform | X | |
13 | Form No. 05B. Declaration of Production Capacity (Applicable for Contractors who are Manufacturers) | X | ||
14 | Form No. 06A. Key Personnel Proposal Table | X | ||
15 | Form No. 06B. Professional Resume of Key Personnel | X | ||
16 | Form No. 06C. Professional Experience Table | X | ||
17 | Form No. 07. Contract Not Completed Due to Contractor's Fault | X | ||
18 | Form No. 08. Contractor's Financial Situation | X | ||
19 | Form No. 09A. Scope of Work Using Subcontractors | X | ||
20 | Form No. 09B. List of Subsidiaries and Member Companies Responsible for the Contract Work | X | ||
21 | Form No. 10A. Delivery Schedule Table | X | ||
22 | Form No. 10B. Contractor's Proposal for Goods | X | ||
II | Form in Financial Proposal Document | |||
23 | Form No. 11.1 Summary of Bid Prices(If Electronic Bidding Document requires bidding according to Form No. 12.1 of this Chapter) | X | ||
24 | Form No. 11.2 Summary of Bid Prices(If Electronic Bidding Document requires bidding according to Form No. 12.2 of this Chapter) | X | ||
25 | Form No. 12.1A. Bid Price Table for Goods (applicable for lump-sum contracts) | X | ||
26 | Form No. 12.1B. Bid Price Table for Goods (applicable for unit price contracts) | X | ||
27 | Form No. 12.1C. Bid Price Table for Goods (applicable for mixed contracts) | X | ||
28 | Form No. 12.2A. Bid Price Table for Goods (applicable for lump-sum contracts) | X | ||
29 | Form No. 12.2B. Bid Price Table for Goods (applicable for unit price contracts) | X | ||
30 | Form No. 12.2C. Bid Price Table for Goods (applicable for mixed contracts) | X | ||
31 | Form No. 13A. Bid Price Table for Related Services (applicable for lump-sum contracts and unit price contracts) | X | ||
32 | Form No. 13B. Bid Price Table for Related Services (applicable for mixed contracts) | X | ||
33 | Form No. 14A. Price Table for Materials and Spare Parts (applicable in cases where the contractor is required to propose independently) | X | ||
34 | Form No. 14B. Price Table for Materials and Spare Parts (applicable in cases where the Client requests) | X | ||
35 | Form No. 15A. List of Goods Eligible for Preferences | X | ||
36 | Form No. 15B. Domestic Production Costs for Goods Eligible for Preferences (in the case of declaring imported costs) | X | ||
37 | Form No. 15C. Domestic Production Costs for Goods Eligible for Preferences (in the case of declaring production costs in Vietnam) | X | ||
38 | Form No. 16A. Bid Application Form under Electronic Financial Proposal (applicable for contractors as organizations) | X | ||
39 | Form No. 16B. Bid Application Form under Electronic Financial Proposal (applicable for contractors as individuals or groups of individuals producing innovative products) | X |
No. | List of Goods | Unit | Quantity | Description of Goods(1) | Origin Requirements for Goods (if any)(2) | Project Location | Delivery Date(3) | |
Earliest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery in case of multiple deliveries] | Latest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery in case of multiple deliveries] | |||||||
1 | ||||||||
2 | ||||||||
3 | ||||||||
… |
No. | Goods List | Unit | Quantity | Goods Description(1) | Origin Requirements (if any)(2) | Project Location | Delivery Date(3) | |
Earliest Delivery Date [write the number of days: starting from the effective date of the contract or from the date the investor requests delivery in the case of multiple deliveries] | Latest Delivery Date [write the number of days: starting from the effective date of the contract or from the date the investor requests delivery in the case of multiple deliveries] | |||||||
1 | ||||||||
2 | ||||||||
… | ||||||||
Contingency Costs | a% |
No. | List of Goods | Unit | Quantity | Description of Goods(1) | Origin Requirements (if any)(2) | Project Location | Delivery Date(3) | |
Earliest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery for multiple deliveries] | Latest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery for multiple deliveries] | |||||||
1 | ||||||||
2 | ||||||||
… |
No. | List of Goods | Unit | Quantity | Description of Goods(1) | Origin Requirements (if any)(2) | Project Location | Delivery Date(3) | |
Earliest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery for multiple deliveries] | Latest Delivery Date [enter number of days: from the effective date of the contract or from the date the investor requests delivery for multiple deliveries] | |||||||
1 | ||||||||
2 | ||||||||
… | ||||||||
Contingency Costs | a% |
No. | Service Description | Tender Volume | Unit | Service Execution Location | Service Completion Date(2) |
1 | Enter service content 1 | ||||
2 | Enter service content 2 | ||||
.. | |||||
n | Enter service content n |
No. | Category | Unit | Volume |
(1) | (2) | (3) | (4) |
No. | Names of members in the consortium | Tasks undertaken | Percentage of value undertaken compared to total bid value |
1 | Name of the lead member of the consortium (System auto-extracted) | - ___ - ___ | - ___% - ___% |
2 | Name of the 2nd member | - ___ - ___ | - ___% - ___% |
.... | .... | .... | ...... |
Total | Total work of the bidding package | 100% |
Legal representative of the bank [insert name, title, signature, and stamp] |
Legal representative of the bank [insert name, title, signature, and stamp] |
CONTRACT FOR SIMILAR WORK TO BE PERFORMED BY THE CONTRACTOR (1) (applies to commercial contractors) |
Contractor's name: _____[insert full name of the contractor]. |
Name and number of the contract | [insert full name of the contract, designation number] | ||
Date of contract signing | [insert date, month, year] | ||
Completion date | [insert date, month, year] | ||
Contract Price(3) | [insert total contract price in figures and currency signed] | Equivalent ____ VND | |
In the case of being a joint venture member, summarize the part of the work undertaken in the joint venture and the value of the part of the contract that the contractor undertakes | [insert summary of the work undertaken in the joint venture] | [insert percentage of the value of the part of the contract undertaken in the total contract value; amount and currency signed] | Equivalent ___ VND |
Project/Procurement Plan Name: | [insert full name of the project/procurement plan with the contract being declared] | ||
Investor's Name: | [insert full name of the investor in the contract being declared] | ||
Address: Phone/Fax: E-mail: | [insert full current address of the investor] [insert phone number, fax number including country code, area code] [insert e-mail address] | ||
Description of similar characteristics according to the provisions in Section 2.1 Chapter III (2) | |||
1. Type of goods | [insert information in the contract] | ||
2. Regarding the value of the executed contract(3) | [insert actual value of the executed contract based on the accepted value, contract liquidation] | ||
3. Regarding the scale of implementation | [insert information in the contract] | ||
4. Other characteristics | [insert any other information (if any)] | ||
DECLARATION OF PRODUCTION CAPACITY OF GOODS (applicable to contractors who are manufacturers) |
Contractor's name: _____ [insert full name of the contractor]. |
Factory Name: | [Insert factory name] |
Address: | [Insert factory address] |
Total Investment: | [Insert total investment] |
Design Capacity: | [Insert design capacity] |
Actual Capacity: | [Insert actual capacity for the most recent year] |
Production Standards: | [Insert applicable production standards, if any] |
Number of Employees: | [Insert total number of employees working at the factory] |
No. | Full Name | Job Position |
1 | [The contractor selects key personnel from their database in the System] | [insert specific job position for the bidding package] |
2 | ||
… |
CV TABLE OF KEY PERSONNEL | |||||||||||||||
Personnel Information | Current Job | ||||||||||||||
No. | Name | ID Card/Passport | Position | Date of Birth | Certification/Professional Qualification | Employer's Name | Employer's Address | Position | Years of Service with Current Employer | Contact Person (Department Head / HR Officer) | Phone/Fax/Email | ||||
1 | [insert key personnel name 1] | ||||||||||||||
2 | [insert name of key personnel 2] | ||||||||||||||
… | |||||||||||||||
n | [insert name of key personnel n] | ||||||||||||||
TABLE OF PROFESSIONAL EXPERIENCE | ||||
No. | Name of Key Personnel | From Date | To Date | Company/Project/Position/Contract/ Relevant Professional and Management Experience |
1 | [insert name of key personnel 1] | … | … | … |
2 | ||||
… | … |
Contracts for supplying goods, EPC, EP, PC, turnkey that are incomplete due to the fault of the contractor in the past according to the provisions of Section 2.1 Chapter III | |||
¨ No contracts for supplying goods, EPC, EP, PC, turnkey that are incomplete due to the fault of the contractor since January 1, __ [insert year] according to the evaluation criterion 1 in the Standard Assessment Table on capacity and experience in Section 2.1 Chapter III. ¨ There are contracts for supplying goods, EPC, EP, PC, turnkey that are incomplete due to the fault of the contractor from January 1, ___ [insert year] according to the evaluation criterion 1 in the Standard Assessment Table on capacity and experience in Section 2.1 Chapter III. | |||
Year | Incomplete contract portion | Contract description | Total contract value (value, currency type, exchange rate, equivalent value in VND) |
Contract description: __________________ Investor name: ___________________ Address: _________________________ Reason for incomplete contract: ________________________ |
The contractor's financial year from ___ month ___ to ___ month ____ (the contractor fills in this content) | |||
Financial data for the most recent years as required by Electronic Bidding Document (The system automatically extracts based on the contractor's financial year) | |||
Year 1: | Year 2: | Year 3: | |
Total assets | |||
Total liabilities | |||
Net asset value | |||
Annual revenue (excluding VAT) | |||
Average annual revenue (excluding VAT) (2) | (Automatically calculated by the system) | ||
Profit before tax | |||
Profit after tax |