Form 02 Evaluation of bidding documents
Sample report on evaluation of bidding documents
Documents of the Same Type "Circulars"
Publtime:30/12/2025
Circular 60/2025/TT-BXD amending and supplementing Circular 11, 12, 13, 14/2021/TT-BXD on construction costs and norms
Circular 60/2025/TT-BXD of the Ministry of Construction amends and supplements a number of contents of Circular 11/2021/TT-BXD dated August 31, 2021 of the Minister of Construction guiding a number of contents on determining and managing construction investment costs; Circular 12/2021/TT-BXD dated August 31, 2021 of the Minister of Construction promulgating construction norms; Circular 13/2021/TT-BXD dated August 31, 2021 of the Minister of Construction guiding methods for determining technical and economic indicators and measuring the volume of works and Circular 14/2021/TT-BXD dated September 8, 2021 of the Minister of Construction guiding the determination of construction maintenance costs
Publtime:12/04/2018
Circular 01/2018/TT-BKHCN
Circular 01/2018/TT-BKHCN on organization and management of the Project to support the national innovation startup ecosystem until 2025
Publtime:08/08/2025
Model No. 2B
Form No. 2B is used to prepare a report evaluating bids for non-consulting service packages, procurement of goods, construction and installation, mixtures, machines placed, machines borrowed using the form of open bidding, limited bidding without online according to the one-stage, two-envelope method;
Publtime:08/08/2025
Model No. 2A
Form No. 2A is used to prepare a report evaluating bids for non-consulting service packages, procurement of goods, construction and installation, mixtures, machines placed, machines borrowed using the form of open bidding, limited bidding without online according to the one-stage, one-envelope method;
Documents of the Same Field "Đấu thầu"
Publtime:26/04/2024
Circular 06/2024/TT-BKHDT
Instructions for submitting and posting bidder selection and bidding document templates on the National Bidding System
Publtime:15/02/2024
Form 02C
Form No. 02C is used to prepare the Decision approving the bidder selection plan.
Publtime:15/02/2024
Form 02B
Form No. 02B is used to prepare a report on appraisal of contractor selection plan.
Publtime:15/02/2024
Form 02A
Form No. 02A is used to prepare the Bidder Selection Plan Proposal.
Publtime:15/02/2024
Form 01C
Form No. 01C is used to prepare the Decision approving the master plan for contractor selection.
Utilities for you
Legal consultation with an expert or AI Tender Consulting
If you have any questions or are having difficulty interpreting this document in a real-world situation, feel free to ask the experts at DauThau.info or the AI Tender Consulting now!
Ask your question here!