Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH as follows:
- Has relationships with 1 project owners.
- Has relationships with 26 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 22 bidding packages, of which 14 prequalification documents have not found the investment project.
- Has invited bids for 8 packages (with 9 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 24 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.25 contractors.
- Breakdown by bidding field: Goods 0%, Construction 11.11%, Consultancy 77.78%, Non-consultancy 11.11%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 31,335,637,000 VND, of which the total winning bid value is: 29,836,973,000 VND.
- The savings rate is: 4.78%.
Data analysis results of DauThau.info software for bid solicitors BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH as follows:
- Has relationships with 26 contractor.
- The average number of contractors participating in each bidding package is: 1.25 contractors.
- Proportion of bidding fields: Goods 0%, Construction 11.11%, Consulting 77.78%, Non-consulting 11.11%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 31,335,637,000 VND, in which the total winning value is: 29,836,973,000 VND.
- The savings rate is: 4.78%.
This Bid solicitor is also an investor. The analysis results of data for the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 9 contractor selection plans, of which 9 were self-published, and 0 were published by other entities.
- Is the investor of 9 Tender Notices, of which 9 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted Tender Notice Terrain survey, planning scheme of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with the form Open bidding.
25/09/2025 15:58
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG THÀNH
26/08/2025 09:47
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Making project planning projects for construction of Kim Son Industrial Park of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 3 bidding package.
21/08/2025 17:24
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Set up planning tasks of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: Công ty Cổ phần Tư vấn đầu tư và Phát triển đô thị HTG Hà Nội
19/06/2025 08:59
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request The plan to select contractors to set up the task of planning the construction zone of Yen Binh Industrial Park of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
05/03/2025 10:02
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: FEC GROUP JOIN STOCK COMPANY
26/09/2024 11:04
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
26/09/2024 10:55
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
18/09/2024 10:10
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Surveying topography, making planning projects, setting up planning boundary markers of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: NATIONAL GENERAL CONSTRUCTION CONSULTING JOINT STOCK COMPANY
03/06/2024 16:07
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Bidding package No. 4: Prepare bidding documents and evaluate bid documents for construction packages of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG THÀNH
30/05/2024 08:49
The data sheet has been partially hidden, to see the full information please Login or Register
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH announced the results of the bidding package Terrain survey, planning scheme with 3 participating contractors .
14/10/2025 09:21
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH publishes Tender Notice Terrain survey, planning scheme in the form Open bidding .
25/09/2025 15:58
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH announced the results of the bid package Prepare and Evaluate Tender documents .
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG THÀNH
26/08/2025 09:47
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH publishes the plan Making project planning projects for construction of Kim Son Industrial Park with 3 bidding package .
21/08/2025 17:24
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH announced the results of the bid package Set up planning tasks .
- Winning bidder: Công ty Cổ phần Tư vấn đầu tư và Phát triển đô thị HTG Hà Nội
19/06/2025 08:59
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH publishes the plan The plan to select contractors to set up the task of planning the construction zone of Yen Binh Industrial Park with 1 bidding package .
05/03/2025 10:02
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH announced the results of the bid package Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. .
- Winning bidder: FEC GROUP JOIN STOCK COMPANY
26/09/2024 11:04
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH publishes the plan Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. with 1 bidding package .
26/09/2024 10:55
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH publishes the plan Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. with 1 bidding package .
18/09/2024 10:10
BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH announced the results of the bid package Surveying topography, making planning projects, setting up planning boundary markers .
- Winning bidder: NATIONAL GENERAL CONSTRUCTION CONSULTING JOINT STOCK COMPANY
03/06/2024 16:07
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted Tender Notice Terrain survey, planning scheme of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with the form Open bidding.
25/09/2025 15:58
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG THÀNH
26/08/2025 09:47
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Making project planning projects for construction of Kim Son Industrial Park of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 3 bidding package.
21/08/2025 17:24
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Set up planning tasks of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: Công ty Cổ phần Tư vấn đầu tư và Phát triển đô thị HTG Hà Nội
19/06/2025 08:59
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request The plan to select contractors to set up the task of planning the construction zone of Yen Binh Industrial Park of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
05/03/2025 10:02
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: FEC GROUP JOIN STOCK COMPANY
26/09/2024 11:04
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
26/09/2024 10:55
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the request Take and analyze environmental samples to periodically check compliance with legal regulations on environmental protection for production and business establishments in industrial parks in the province in 2024. of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH with 1 bidding package.
18/09/2024 10:10
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Surveying topography, making planning projects, setting up planning boundary markers of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: NATIONAL GENERAL CONSTRUCTION CONSULTING JOINT STOCK COMPANY
03/06/2024 16:07
The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted the results of the bidding package Bidding package No. 4: Prepare bidding documents and evaluate bid documents for construction packages of the investor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH.
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG VÀ THƯƠNG MẠI HƯNG THÀNH
30/05/2024 08:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted 14 of the contractor selection plan, which contains 22 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted 9 Tender Notices in 8 bidding packages. Among these, 9 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 24 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has a relationship with 26 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity BAN QUẢN LÝ CÁC KHU CÔNG NGHIỆP TỈNH NINH BÌNH has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects