Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 207 contractor.
- Announced 58 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 240 contractor selection plans with a total of 480 bidding packages, of which 47 prequalification documents have not found the investment project.
- Has invited bids for 126 packages (with 166 tender notices), and conducted prequalification for 0 packages.
- There are 9 bidding packages with content that needs clarification.
- Announced the results of 373 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 257 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 109 packages that have not fully posted the contractor selection results. Of these 106 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.58 contractors.
- Breakdown by bidding field: Goods 0%, Construction 37.35%, Consultancy 49.40%, Non-consultancy 12.65%, Mixed 0%, Other fields 0.6%.
- The total value according to the packages with valid contractor selection results is: 9,413,392,967,258 VND, of which the total winning bid value is: 9,263,900,425,656 VND.
- The savings rate is: 1.59%.
Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình as follows:
- Has relationships with 207 contractor.
- The average number of contractors participating in each bidding package is: 1.58 contractors.
- Proportion of bidding fields: Goods 0%, Construction 37.35%, Consulting 49.40%, Non-consulting 12.65%, Mixed 0%, Other 0.6%.
- The total value according to the bidding package with valid IMP is: 9,413,392,967,258 VND, in which the total winning value is: 9,263,900,425,656 VND.
- The savings rate is: 1.59%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình are as follows:
- Is the investor of 58 development investment projects.
- Is the investor of 286 contractor selection plans, of which 199 were self-published, and 87 were published by other entities.
- Is the investor of 198 Tender Notices, of which 163 were self-invited, and 35 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 04: Consulting on task setting, survey work estimates, construction design and implementation after basic design, BIM modeling and survey work supervision .
- Winning bidder: YEN MA SURVEY DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
21/01/2026 14:44
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Additional contractor selection plan (3rd time), Construction project of extended T21 route (continuous section from the western road leading to the Van River overpass to Nguyen Minh Khong street), Hoa Lu city (now Hoa Lu ward, Ninh Binh province) with 2 bidding package .
21/01/2026 14:40
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 14: Traffic safety verification advice in the stage before putting the project into exploitation .
- Winning bidder: Road Engineering Center
21/01/2026 14:24
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Plan to select additional contractors for the Cha La Bridge Construction Investment Project, Ninh Binh City, Ninh Binh Province with 1 bidding package .
21/01/2026 14:19
Investor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has posted an investment and development project Construction of extended T21 route (continuous section from the western path of the Van River overpass to Nguyen Minh Khong street), Hoa Lu city (now Hoa Lu ward, Ninh Binh province).
21/01/2026 14:14
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 10: Verification consulting (construction design implemented after basic design (construction drawing design, construction estimate); Hydraulic calculation model, bridge hydrology) .
- Winning bidder: VIỆN KHOA HỌC VÀ CÔNG NGHỆ CÔNG TRÌNH THUỶ
21/01/2026 14:12
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 24: Consulting on auditing the final settlement report of completed volumes .
- Winning bidder: ASCO FIRM AUDITING AND VALUATION COMPANY LIMITED
19/01/2026 15:55
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Plan for selecting additional contractors, Investment project to build the East - West route, Ninh Binh province (phase I) with 1 bidding package .
19/01/2026 15:49
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 10: Construction insurance (section Km0+00- Km0+750) .
- Winning bidder: Công ty cổ phần Tập đoàn bảo hiểm DBV
06/01/2026 16:41
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Contractor selection plan, Project to upgrade and renovate the road connecting National Highway 12B with National Highway 10, Yen Mo - Kim Son section, Ninh Binh province (old DT.480E route) with 1 bidding package .
06/01/2026 16:39
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package 09: Construction insurance .
- Winning bidder: Công ty cổ phần Tập đoàn bảo hiểm DBV
06/11/2025 15:20
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH PHƯƠNG HẠNH
15/10/2025 17:36
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Bidding package: Consulting outline and cost estimates of surveys, making environmental impact assessment reports .
- Winning bidder: ACT CONSTRUCTIONS AND TRADING COMPANY LIMITED
30/09/2025 20:58
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Plan to select Contractor Bo Sung, Project of renovating and embellishing Tam Coc - Bich Dong route (section from National Highway 1A to Bich Dong Pagoda), Hoa Lu City with 1 bidding package .
30/09/2025 20:44
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package 15: Construction of traffic safety system, lighting electricity .
- Winning bidder: SON LAP PRODUCTION AND TRADING COMPANY LIMITED
30/08/2025 16:11
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Bidding package 08: Consulting verification of feasibility study reports .
- Winning bidder: Institute of Transport Science and Technology, Công ty cổ phần tư vấn xây dựng công nghiệp Trần Hoàng
26/07/2025 15:10
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 02: Survey consultancy, making reports on investment policies .
- Winning bidder: HT CONSULTANT OF BUILDING CONSTRUCTION AND DEVERLOPMENT COMPANY LIMITED
25/07/2025 10:44
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 01: Consulting on making tasks and estimates for surveying, making reports on investment policies .
- Winning bidder: YEN MA SURVEY DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
25/07/2025 10:36
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 02: Survey consultancy, making reports on investment policies .
- Winning bidder: ROAD AND BRIDGE ENGINEERING CONSULTANT JOINT STOCK COMPANY
24/07/2025 21:29
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 01: Consulting on making tasks and cost estimates, making reports on investment policies .
- Winning bidder: HT CONSULTANT OF BUILDING CONSTRUCTION AND DEVERLOPMENT COMPANY LIMITED
24/07/2025 21:25
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 04: Consulting on task setting, survey work estimates, construction design and implementation after basic design, BIM modeling and survey work supervision .
- Winning bidder: YEN MA SURVEY DESIGN AND CONSTRUCTION JOINT STOCK COMPANY
21/01/2026 14:44
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Additional contractor selection plan (3rd time), Construction project of extended T21 route (continuous section from the western road leading to the Van River overpass to Nguyen Minh Khong street), Hoa Lu city (now Hoa Lu ward, Ninh Binh province) with 2 bidding package .
21/01/2026 14:40
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 14: Traffic safety verification advice in the stage before putting the project into exploitation .
- Winning bidder: Road Engineering Center
21/01/2026 14:24
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Plan to select additional contractors for the Cha La Bridge Construction Investment Project, Ninh Binh City, Ninh Binh Province with 1 bidding package .
21/01/2026 14:19
Investor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has posted an investment and development project Construction of extended T21 route (continuous section from the western path of the Van River overpass to Nguyen Minh Khong street), Hoa Lu city (now Hoa Lu ward, Ninh Binh province).
21/01/2026 14:14
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 10: Verification consulting (construction design implemented after basic design (construction drawing design, construction estimate); Hydraulic calculation model, bridge hydrology) .
- Winning bidder: VIỆN KHOA HỌC VÀ CÔNG NGHỆ CÔNG TRÌNH THUỶ
21/01/2026 14:12
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 24: Consulting on auditing the final settlement report of completed volumes .
- Winning bidder: ASCO FIRM AUDITING AND VALUATION COMPANY LIMITED
19/01/2026 15:55
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Plan for selecting additional contractors, Investment project to build the East - West route, Ninh Binh province (phase I) with 1 bidding package .
19/01/2026 15:49
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình announced the results of the bid package Package No. 10: Construction insurance (section Km0+00- Km0+750) .
- Winning bidder: Công ty cổ phần Tập đoàn bảo hiểm DBV
06/01/2026 16:41
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình publishes the plan Contractor selection plan, Project to upgrade and renovate the road connecting National Highway 12B with National Highway 10, Yen Mo - Kim Son section, Ninh Binh province (old DT.480E route) with 1 bidding package .
06/01/2026 16:39
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has posted 240 of the contractor selection plan, which contains 480 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has posted 166 Tender Notices in 126 bidding packages. Among these, 166 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has posted 373 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 373 package, canceled the bid 0 package (among the bidding packages above).
- There are 257 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has a relationship with 207 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has a relationship with 54 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Ninh Bình has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects