Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng số 2 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 116 contractors.
- Announced 48 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 97 contractor selection plans with a total of 242 bidding packages, of which 7 prequalification documents have not found the investment project
- Has invited bids for 59 packages (with 81 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 139 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 84 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 114 packages that have not fully posted the contractor selection results. Of these 111 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.16 contractors.
- Breakdown by bidding field: Goods 0%, Construction 55.56%, Consultancy 38.27%, Non-consultancy 4.94%, Mixed 1.23%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,176,770,653,747 VND, of which the total winning bid value is: 2,085,501,634,640 VND.
- The savings rate is: 4.19%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng số 2 as follows:
- Has relationships with 116 contractors.
- The average number of contractors participating in each bidding package is: 2.16 contractors.
- Proportion of bidding fields: Goods 0%, Construction 55.56%, Consulting 38.27%, Non-consulting 4.94%, Mixed 1.23%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,176,770,653,747 VND, in which the total winning value is: 2,085,501,634,640 VND.
- The savings rate is: 4.19%.
This investor is also a bid solicitor. Analysis results data for bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 as follows:
- Is the bid solicitor of 97 CSPs, of which 96 CSPs are self-published, and 1 CSPs are published by other units.
- Is the bid solicitor of 81 TBMTs, of which 78 TBMTs are self-invited, and 3 TBMTs are invited by other units.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request KHLCNT a number of consulting packages under the investment project to build the Technical Center for Testing and Imaging Diagnosis, the Pediatrics Department and the Department of Traditional Medicine - Rehabilitation of Hung Ha General Hospital of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 5 bidding package.
18/11/2025 10:22
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the results of the bidding package Package 08: Construction and equipment of the investor Ban Quản lý dự án đầu tư xây dựng số 2.
- Winning bidder: THAI BINH HYDRAULIC CONSTRUCTION JOINT STOCK COMPANY
17/11/2025 17:30
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the results of the bidding package Package No. 08: Consulting on verification of construction drawing designs and construction estimates (including building information modeling (BIM)) of the investor Ban Quản lý dự án đầu tư xây dựng số 2.
- Winning bidder: PC ONE JOINT STOCK COMPANY
13/11/2025 16:45
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan to select contractors for a number of bidding packages to carry out construction items: Road and works on the route (section from Km0+000 to Km4+800 and section from Km6+200 to the end of the route) under the investment project to build a road from Thai Binh city to Hung Ha district connecting with Hung Yen province, phase 1 (from National Highway 10 intersection to Dong Tu intersection) of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 5 bidding package.
12/11/2025 15:52
Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted Tender Notice Package 08: Construction and equipment of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with the form Open bidding.
09/11/2025 21:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 8 bidding package.
08/11/2025 17:12
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 8 bidding package.
08/11/2025 16:28
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors to implement bidding packages for construction items of line No. 4, under the investment project to build trunk roads connecting with functional areas in Thai Binh province's economic zone of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 3 bidding package.
05/11/2025 18:10
Ban Quản lý dự án đầu tư xây dựng số 2 Posted Development Investment Project Investment project to build axial routes connected to functional areas in Thai Binh Economic Zone.
05/11/2025 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng số 2 publishes the plan KHLCNT a number of consulting packages under the investment project to build the Technical Center for Testing and Imaging Diagnosis, the Pediatrics Department and the Department of Traditional Medicine - Rehabilitation of Hung Ha General Hospital with 5 bidding package .
18/11/2025 10:22
Ban Quản lý dự án đầu tư xây dựng số 2 announced the results of the bid package Package 08: Construction and equipment .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG HẢI PHONG, THAI BINH HYDRAULIC CONSTRUCTION JOINT STOCK COMPANY
17/11/2025 17:30
Ban Quản lý dự án đầu tư xây dựng số 2 announced the results of the bidding package Package 08: Construction and equipment with 1 participating contractors .
14/11/2025 09:38
Ban Quản lý dự án đầu tư xây dựng số 2 announced the results of the bid package Package No. 08: Consulting on verification of construction drawing designs and construction estimates (including building information modeling (BIM)) .
- Winning bidder: CONSTRUCTION MACHINERY AND INDUSTRIAL WORKS CONINCO JOINT STOCK COMPANY, PC ONE JOINT STOCK COMPANY
13/11/2025 16:45
Ban Quản lý dự án đầu tư xây dựng số 2 publishes the plan Plan to select contractors for a number of bidding packages to carry out construction items: Road and works on the route (section from Km0+000 to Km4+800 and section from Km6+200 to the end of the route) under the investment project to build a road from Thai Binh city to Hung Ha district connecting with Hung Yen province, phase 1 (from National Highway 10 intersection to Dong Tu intersection) with 5 bidding package .
12/11/2025 15:52
Ban Quản lý dự án đầu tư xây dựng số 2 publishes Tender Notice Package 08: Construction and equipment in the form Open bidding .
09/11/2025 21:26
Ban Quản lý dự án đầu tư xây dựng số 2 announced the results of the bidding package Tender package No 08: Consulting on verification of construction drawing designs and construction estimates (including building information modeling (BIM)) with 1 participating contractors .
09/11/2025 15:36
Ban Quản lý dự án đầu tư xây dựng số 2 publishes the plan Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke with 8 bidding package .
08/11/2025 17:12
Ban Quản lý dự án đầu tư xây dựng số 2 publishes the plan Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke with 8 bidding package .
08/11/2025 16:28
Ban Quản lý dự án đầu tư xây dựng số 2 publishes the plan Plan for selecting contractors to implement bidding packages for construction items of line No. 4, under the investment project to build trunk roads connecting with functional areas in Thai Binh province's economic zone with 3 bidding package .
05/11/2025 18:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request KHLCNT a number of consulting packages under the investment project to build the Technical Center for Testing and Imaging Diagnosis, the Pediatrics Department and the Department of Traditional Medicine - Rehabilitation of Hung Ha General Hospital of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 5 bidding package.
18/11/2025 10:22
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the results of the bidding package Package 08: Construction and equipment of the investor Ban Quản lý dự án đầu tư xây dựng số 2.
- Winning bidder: THAI BINH HYDRAULIC CONSTRUCTION JOINT STOCK COMPANY
17/11/2025 17:30
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the results of the bidding package Package No. 08: Consulting on verification of construction drawing designs and construction estimates (including building information modeling (BIM)) of the investor Ban Quản lý dự án đầu tư xây dựng số 2.
- Winning bidder: PC ONE JOINT STOCK COMPANY
13/11/2025 16:45
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan to select contractors for a number of bidding packages to carry out construction items: Road and works on the route (section from Km0+000 to Km4+800 and section from Km6+200 to the end of the route) under the investment project to build a road from Thai Binh city to Hung Ha district connecting with Hung Yen province, phase 1 (from National Highway 10 intersection to Dong Tu intersection) of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 5 bidding package.
12/11/2025 15:52
Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted Tender Notice Package 08: Construction and equipment of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with the form Open bidding.
09/11/2025 21:26
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 8 bidding package.
08/11/2025 17:12
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors for packages under the project: Repairing and repairing damage and incidents of Dinh Cu sewer at K9+897 Huu Tra Ly estuary dyke of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 8 bidding package.
08/11/2025 16:28
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng số 2 has posted the request Plan for selecting contractors to implement bidding packages for construction items of line No. 4, under the investment project to build trunk roads connecting with functional areas in Thai Binh province's economic zone of the investor Ban Quản lý dự án đầu tư xây dựng số 2 with 3 bidding package.
05/11/2025 18:10
Ban Quản lý dự án đầu tư xây dựng số 2 Posted Development Investment Project Investment project to build axial routes connected to functional areas in Thai Binh Economic Zone.
05/11/2025 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng số 2 is the investor of 48 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng số 2 is the owner of 97 contractor selection plan. In which, they self-invite 96 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng số 2 is the investor of 81 package, of which 78 package is self-invited, other units invite bid 3 package. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Ban Quản lý dự án đầu tư xây dựng số 2 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng số 2 is an investor with 116 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.