Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Decision name | Certification period |
---|---|---|
1 | Certificate 636/GCN-BXD. | |
2 | Certificate 240/GCN-BXD |
This lab belongs to the contractor. The results of data analysis for contractor CÔNG TY TNHH TƯ VẤN XÂY DỰNG SƠN HÀ are as follows:
You need to Login or Sign up to view all informations.
- Participated in 28 bidding packages, of which 21 were won, 4 were lost, 2 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 99.12% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bà Rịa - Vũng Tàu (17), TP.Hồ Chí Minh (3), Trà Vinh (2), Khánh Hòa (1), Undefined (5)
- Has relationships with 14 Bid Solicitors
- Has competed against 15 contractors in 13 bidding packages, won 8 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 8 contractors in 10 bidding packages, won 7 packages, lost 2 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Announced Contractor selection plan of 153 project with total 669 bidding packages.
- Inviting bids 178 has been carried out package (with 185 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 100 package, cancel the bid for 0 package (among the packages above).
- Yes 5 package with results without TBMT, TBMST.
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.