Data analysis results of DauThau.info software for project owners Central Project Office as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 189 contractors.
- Announced 31 development investment project, of which 5 projects that have not announced the contractor selection plan.
- Announced 95 contractor selection plans with a total of 250 bidding packages, of which 35 prequalification documents have not found the investment project
- Has invited bids for 113 packages (with 153 tender notices), conducted prequalification for 7 packages.
- Published 0 quotation requests.
- Announced the results of 203 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 100 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 134 packages that have not fully posted the contractor selection results. Of these 125 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.23 contractors.
- Breakdown by bidding field: Goods 4.58%, Construction 22.88%, Consultancy 66.01%, Non-consultancy 4.58%, Mixed 0%, Other fields 1.95%.
- The total value according to the packages with valid contractor selection results is: 2,619,057,676,050 VND, of which the total winning bid value is: 2,520,281,309,604 VND.
- The savings rate is: 3.77%.
Data analysis results of DauThau.info software for project owners Central Project Office as follows:
- Has relationships with 189 contractors.
- The average number of contractors participating in each bidding package is: 2.23 contractors.
- Proportion of bidding fields: Goods 4.58%, Construction 22.88%, Consulting 66.01%, Non-consulting 4.58%, Mixed 0%, Other 1.95%.
- The total value according to the bidding package with valid IMP is: 2,619,057,676,050 VND, in which the total winning value is: 2,520,281,309,604 VND.
- The savings rate is: 3.77%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Central Project Office has posted the request Approve adjustments and supplements to the contractor selection plan (phase 13) of the Len river system subproject. Project: Upgrading the Len River and Hoang Mai River irrigation systems to improve the ability to control salinity, improve the ecological environment and cope with climate change (KEXIM1) of the investor Central Project Office with 2 bidding package.
31/12/2025 15:31
Bid solicitor Central Project Office has posted Tender Notice Package WB11-FS-TV1: Survey consulting, preparation of feasibility study report of the investor Central Project Office with the form Open bidding.
26/12/2025 19:18
Bid solicitor Central Project Office has posted Tender Notice Package WB11-FS-TV2: Consulting on preparing environmental impact assessment reports and documents on environmental and social safety policies of the investor Central Project Office with the form Open bidding.
24/12/2025 18:40
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
24/12/2025 10:25
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-FS-TV6: Consulting on survey tasks, hydraulic mathematical modeling and feasibility study report of the investor Central Project Office.
- Winning bidder: VIET THANH CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
19/12/2025 10:03
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-FS-TV5: Consulting on preparing environmental impact assessment reports and safety policy documents of the investor Central Project Office.
- Winning bidder: Trung tâm Hỗ trợ Cộng đồng Phát triển bền vững
16/12/2025 14:30
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
16/12/2025 14:25
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-NCTKT-TV4: Consulting on verification of pre-feasibility study report of the investor Central Project Office.
16/12/2025 09:15
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
10/12/2025 13:15
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
08/12/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
Central Project Office announced the results of the bid package Package WB11-NCTKT-TV4: Consulting on verification of pre-feasibility study report .
- Winning bidder:
16/12/2025 09:15
Central Project Office announced the results of the bid package CPO-KGCM-CW01: Construction and installation of construction equipment .
- Winning bidder: TECHNOLOGY SCIENCE PUMP AND WATER RESOURCES MACHINE JOINT STOCK COMPANY
16/07/2025 16:11
Central Project Office announced the results of the bidding package CPO-KGCM-CW01: Construction and installation of construction equipment with 2 participating contractors .
09/06/2025 09:26
Central Project Office publishes Tender Notice CPO-KGCM-CW01: Construction and installation of construction equipment in the form Open bidding .
09/05/2025 15:25
Central Project Office publishes the plan Plan for selecting contractors of the central component project under the project project combined with coastal protection and restoration of mangrove forests in Kien Giang and Ca Mau provinces (3rd time) with 3 bidding package .
29/04/2025 14:30
Central Project Office announced the results of the bid package CPO-JICA5-TV2: Consulting on surveys, preparing pre-feasibility study reports and mathematical models .
- Winning bidder: SOUTHERN INSTITUTE OF WATER RESOURCES RESEARCH, PHUONG BAC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
24/03/2025 16:34
Central Project Office announced the results of the bid package CPO-JICA5-TV3: Consulting on social environmental assessment and framing .
- Winning bidder: VIET NAM INVESTMENT AND DEVELOPMENT CONSULTANT COMPANY LIMITED
07/03/2025 22:32
Central Project Office announced the results of the bidding package CPO-JICA5-TV2: Consulting on surveys, preparing pre-feasibility study reports and mathematical models with 2 participating contractors .
28/02/2025 11:33
Central Project Office announced the results of the bid package Package WB11-NCTKT-TV3: Topographic and geological survey supervision consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN & XÂY DỰNG 36
20/02/2025 10:42
Central Project Office publishes Tender Notice CPO-JICA5-TV2: Consulting on surveys, preparing pre-feasibility study reports and mathematical models in the form Open bidding .
17/02/2025 14:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Central Project Office has posted the request Approve adjustments and supplements to the contractor selection plan (phase 13) of the Len river system subproject. Project: Upgrading the Len River and Hoang Mai River irrigation systems to improve the ability to control salinity, improve the ecological environment and cope with climate change (KEXIM1) of the investor Central Project Office with 2 bidding package.
31/12/2025 15:31
Bid solicitor Central Project Office has posted Tender Notice Package WB11-FS-TV1: Survey consulting, preparation of feasibility study report of the investor Central Project Office with the form Open bidding.
26/12/2025 19:18
Bid solicitor Central Project Office has posted Tender Notice Package WB11-FS-TV2: Consulting on preparing environmental impact assessment reports and documents on environmental and social safety policies of the investor Central Project Office with the form Open bidding.
24/12/2025 18:40
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
24/12/2025 10:25
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-FS-TV6: Consulting on survey tasks, hydraulic mathematical modeling and feasibility study report of the investor Central Project Office.
- Winning bidder: VIET THANH CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
19/12/2025 10:03
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-FS-TV5: Consulting on preparing environmental impact assessment reports and safety policy documents of the investor Central Project Office.
- Winning bidder: Trung tâm Hỗ trợ Cộng đồng Phát triển bền vững
16/12/2025 14:30
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
16/12/2025 14:25
The Bid solicitor Central Project Office has posted the results of the bidding package Package WB11-NCTKT-TV4: Consulting on verification of pre-feasibility study report of the investor Central Project Office.
16/12/2025 09:15
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
10/12/2025 13:15
The Bid solicitor Central Project Office has posted the request Contractor selection plan Phase of preparing feasibility study report for Mekong Delta Climate Resilience and Integrated Transformation (MERIT) Project of the investor Central Project Office with 7 bidding package.
08/12/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Project Office is the investor of 31 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Central Project Office is the owner of 95 contractor selection plan. In which, they self-invite 87 of contractor selection plan, other units invite bids of 8 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Central Project Office is the investor of 153 package, of which 135 package is self-invited, other units invite bid 18 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Project Office is the owner of 203 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Central Project Office has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Project Office is an investor with 189 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.