Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 75 contractors.
- Announced 13 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 58 contractor selection plans with a total of 145 bidding packages, of which 30 prequalification documents have not found the investment project
- Has invited bids for 27 packages (with 30 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 137 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 113 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.60 contractors.
- Breakdown by bidding field: Goods 36.67%, Construction 13.33%, Consultancy 6.67%, Non-consultancy 43.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 130,890,007,672 VND, of which the total winning bid value is: 121,364,643,433 VND.
- The savings rate is: 7.28%.
Data analysis results of DauThau.info software for project owners HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY as follows:
- Has relationships with 75 contractors.
- The average number of contractors participating in each bidding package is: 2.60 contractors.
- Proportion of bidding fields: Goods 36.67%, Construction 13.33%, Consulting 6.67%, Non-consulting 43.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 130,890,007,672 VND, in which the total winning value is: 121,364,643,433 VND.
- The savings rate is: 7.28%.
You need to Login or Sign up to view all informations.
- Participated in 16 bidding packages, of which 14 were won, 0 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 76.5% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 83.48% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (13), Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (13), Undefined (3)
- Has relationships with 3 Bid Solicitors
- Has competed against 3 contractors in 4 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: CÔNG TY TNHH MỘT THÀNH VIÊN NƯỚC SẠCH HÀ ĐÔNG
- Code of capacity certificate of construction activities: 00039086
- Issuer: Sở kế hoạch và đầu tư Thành phố Hà Nội
- Fields:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Tender package No 06: Construction and installation of HDPE D355 pipeline of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
24/12/2025 09:02
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 01: Terrain survey consultancy, Economic and technical reports of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: WATECH CONSTRUCTION CONSULTING JOINT STOCK COMPANY
22/12/2025 10:35
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 02: Consulting examination of BCKTKT, Design BVTC and Estimates of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: VIET NAM CONSTRUCTION TECHNOLOGY- ECONOMIC CONSULTING JOINT STOCK COMPANY
22/12/2025 10:30
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the request Supplement the source for the DN300 pipeline La Phu with HDPE D355 pipe from Duong Noi water supply station of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with 5 bidding package.
18/12/2025 09:25
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the request Construction of clean water distribution pipeline D400 from Le Trong Tan - Quang Trung intersection to Van Khe - Phuc La intersection, Hanoi city of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with 2 bidding package.
16/12/2025 10:20
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 03: Supply of watch accessories and submersible well pumps in 2025 of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: DNP HAWACO JOINT STOCK COMPANY
12/12/2025 15:47
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Bidding package No. 04: Consulting on assessment of environmental documents, survey of prefabricated materials of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: 65-HCL CONSTRUCTION INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/11/2025 08:32
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 06: Construction supervision of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN & ĐẦU TƯ XÂY DỰNG ĐẠT PHÁT
25/11/2025 08:05
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package number 03: Consulting on preparing bidding documents and evaluating bidding documents of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
25/11/2025 08:01
Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Tender package No 03: Supply of watch accessories and submersible well pumps in 2025 of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
20/11/2025 11:27
The data sheet has been partially hidden, to see the full information please Login or Register
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 06: Construction supervision .
- Winning bidder: CEN CONSTRUCTION AND ENVIRONMENT JOINT STOCK COMPANY
04/09/2025 09:30
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 05: Auditing the project settlement report .
- Winning bidder: VIET NAM AUDITING & EVALUATION COMPANY LIMITED
20/08/2025 09:33
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 06: Auditing the project settlement report .
- Winning bidder: VIET NAM AUDITING & EVALUATION COMPANY LIMITED
20/08/2025 09:29
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 06: Auditing the project settlement report .
- Winning bidder: VIET NAM AUDITING & EVALUATION COMPANY LIMITED
20/08/2025 09:25
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 05: Auditing the project settlement report .
- Winning bidder: VIET NAM AUDITING & EVALUATION COMPANY LIMITED
20/08/2025 09:21
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 03: Bid preparation consultancy, Bid evaluation .
- Winning bidder: THAI DUONG BUILDING INFRASTRUCTURE AND TRADING INVESTMENT JOINT STOCK COMPANY
10/07/2025 14:24
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 04: Consulting on evaluation of Bidding Documents, results of LCNT .
- Winning bidder: VIPLAND INTERNATIONAL DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
10/07/2025 14:19
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY publishes the plan Improving the water supply system of Ngo Thi Nham residential area, Sen Sen Service Land, Land Land and Van Phuc Auction Land with 5 bidding package .
30/06/2025 16:11
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package No. 02: Consulting examination of BCKTKT, Design BVTC and Estimates .
- Winning bidder: CEN CONSTRUCTION AND ENVIRONMENT JOINT STOCK COMPANY
24/06/2025 09:34
HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY announced the results of the bid package Package 01: Consulting on making economic and technical reports .
- Winning bidder: ASIA - PACIFIC DEVELOPMENT COMPANY LIMITED
16/06/2025 14:01
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Tender package No 06: Construction and installation of HDPE D355 pipeline of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
24/12/2025 09:02
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 01: Terrain survey consultancy, Economic and technical reports of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: WATECH CONSTRUCTION CONSULTING JOINT STOCK COMPANY
22/12/2025 10:35
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 02: Consulting examination of BCKTKT, Design BVTC and Estimates of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: VIET NAM CONSTRUCTION TECHNOLOGY- ECONOMIC CONSULTING JOINT STOCK COMPANY
22/12/2025 10:30
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the request Supplement the source for the DN300 pipeline La Phu with HDPE D355 pipe from Duong Noi water supply station of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with 5 bidding package.
18/12/2025 09:25
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the request Construction of clean water distribution pipeline D400 from Le Trong Tan - Quang Trung intersection to Van Khe - Phuc La intersection, Hanoi city of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with 2 bidding package.
16/12/2025 10:20
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package No. 03: Supply of watch accessories and submersible well pumps in 2025 of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: DNP HAWACO JOINT STOCK COMPANY
12/12/2025 15:47
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Bidding package No. 04: Consulting on assessment of environmental documents, survey of prefabricated materials of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: 65-HCL CONSTRUCTION INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/11/2025 08:32
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package 06: Construction supervision of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN & ĐẦU TƯ XÂY DỰNG ĐẠT PHÁT
25/11/2025 08:05
The Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted the results of the bidding package Package number 03: Consulting on preparing bidding documents and evaluating bidding documents of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY.
- Winning bidder: NORTH ASIA INVESTMENT AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY
25/11/2025 08:01
Bid solicitor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has posted Tender Notice Tender package No 03: Supply of watch accessories and submersible well pumps in 2025 of the investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY with the form Open bidding.
20/11/2025 11:27
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY is the investor of 13 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY is the owner of 58 contractor selection plan. In which, they self-invite 38 of contractor selection plan, other units invite bids of 20 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY is the investor of 30 package, of which 23 package is self-invited, other units invite bid 7 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY is the owner of 137 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HADONG WATER ONE-MEMBER LIMITED LIABILITY COMPANY is an investor with 75 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.