Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners HYDROPOWER PROJECT MANAGEMENT BOARD No 6 as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 13 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 3 contractor selection plans with a total of 3 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 16 packages (with 16 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 22 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 25.00%, Consultancy 25.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 105,810,055,511 VND, of which the total winning bid value is: 78,057,652,232 VND.
- The savings rate is: 26.23%.
Data analysis results of DauThau.info software for project owners HYDROPOWER PROJECT MANAGEMENT BOARD No 6 as follows:
- Has relationships with 13 contractors.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 25.00%, Consulting 25.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 105,810,055,511 VND, in which the total winning value is: 78,057,652,232 VND.
- The savings rate is: 26.23%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
06/11/2018 10:33
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
30/10/2018 11:12
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National Competitive Bidding.
26/10/2018 16:00
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consulting on surveys to serve the preparation of Feasibility Report and preparation of Feasibility Report for the project of increasing the capacity of 220/110kV MBA at Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
25/10/2018 14:01
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National Competitive Bidding.
18/10/2018 15:24
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request KHLCNT Procurement of tires for Land Cruiser cars of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
17/10/2018 10:47
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consulting on quality inspection of Thac Mo Extension Power Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
04/10/2018 16:08
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
21/09/2018 13:22
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Surveying consultancy for the preparation of technical reports and technical reports for the project to increase the capacity of transformer 220/110kV of Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National competitive bidding.
28/08/2018 09:22
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request Surveying consultancy for preparation of technical report for project to increase capacity of 220/110 kV transformer of Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
15/08/2018 08:41
The data sheet has been partially hidden, to see the full information please Login or Register
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 announced the results of the bid package Shopping for Land Cruiser car tires .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XUẤT NHẬP KHẨU Ô TÔ GIA PHÁT
06/11/2018 10:33
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 announced the results of the bidding package Shopping for Land Cruiser car tires with 1 participating contractors .
05/11/2018 07:48
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 announced the results of the bid package Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant .
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
30/10/2018 11:12
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 publishes Tender Notice Shopping for Land Cruiser car tires in the form National Competitive Bidding .
26/10/2018 16:00
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 announced the results of the bid package Consulting on surveys to serve the preparation of Feasibility Report and preparation of Feasibility Report for the project of increasing the capacity of 220/110kV MBA at Tri An Hydropower Plant .
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
25/10/2018 14:01
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 publishes Tender Notice Shopping for Land Cruiser car tires in the form National Competitive Bidding .
18/10/2018 15:24
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 publishes the plan KHLCNT Procurement of tires for Land Cruiser cars with 1 bidding package .
17/10/2018 10:47
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 announced the results of the bid package Consulting on quality inspection of Thac Mo Extension Power Plant .
- Winning bidder: Công ty Cổ phần Tư vấn Công nghệ, Thiết bị và Kiểm định Xây dựng CONINCO
04/10/2018 16:08
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 publishes the plan Consulting on quality inspection of Thac Mo Extension Power Plant with 1 bidding package .
24/09/2018 15:43
HYDROPOWER PROJECT MANAGEMENT BOARD No 6 publishes the plan Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant with 1 bidding package .
21/09/2018 13:22
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
06/11/2018 10:33
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
30/10/2018 11:12
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National Competitive Bidding.
26/10/2018 16:00
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consulting on surveys to serve the preparation of Feasibility Report and preparation of Feasibility Report for the project of increasing the capacity of 220/110kV MBA at Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng Điện 2
25/10/2018 14:01
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Shopping for Land Cruiser car tires of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National Competitive Bidding.
18/10/2018 15:24
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request KHLCNT Procurement of tires for Land Cruiser cars of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
17/10/2018 10:47
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the results of the bidding package Consulting on quality inspection of Thac Mo Extension Power Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6.
04/10/2018 16:08
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request Consultancy on preparation of feasibility study report for investment project to upgrade the system of opening and closing valve for the spillway of Tri An hydropower plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
21/09/2018 13:22
Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted Tender Notice Surveying consultancy for the preparation of technical reports and technical reports for the project to increase the capacity of transformer 220/110kV of Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with the form National competitive bidding.
28/08/2018 09:22
The Bid solicitor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has posted the request Surveying consultancy for preparation of technical report for project to increase capacity of 220/110 kV transformer of Tri An Hydropower Plant of the investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 with 1 bidding package.
15/08/2018 08:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 is the investor of 16 package, of which 12 package is self-invited, other units invite bid 4 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 is the owner of 22 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HYDROPOWER PROJECT MANAGEMENT BOARD No 6 is an investor with 13 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.