Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners MARITIME PROJECT MANAGEMENT UNIT - VIMC as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 26 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 11 contractor selection plans with a total of 16 bidding packages, of which 11 prequalification documents have not found the investment project
- Has invited bids for 16 packages (with 20 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 21 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.72 contractors.
- Breakdown by bidding field: Goods 30.00%, Construction 10.00%, Consultancy 25.00%, Non-consultancy 20.00%, Mixed 15.00%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 340,854,480,118 VND, of which the total winning bid value is: 331,370,324,847 VND.
- The savings rate is: 2.78%.
Data analysis results of DauThau.info software for project owners MARITIME PROJECT MANAGEMENT UNIT - VIMC as follows:
- Has relationships with 26 contractors.
- The average number of contractors participating in each bidding package is: 2.72 contractors.
- Proportion of bidding fields: Goods 30.00%, Construction 10.00%, Consulting 25.00%, Non-consulting 20.00%, Mixed 15.00%, Other 0%.
- The total value according to the bidding package with valid IMP is: 340,854,480,118 VND, in which the total winning value is: 331,370,324,847 VND.
- The savings rate is: 2.78%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Tender package TV02: Consultancy and verification of construction drawing design, construction cost estimate of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:34
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-02: Construction supervision of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:30
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-03: Audit of completed project settlement report of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:27
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package PTV bidding package: Construction and installation insurance of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:24
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Bidding package TV-01: Preparation of bidding documents, evaluation of bidding documents for PC bidding package of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:20
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-02: Construction supervision and equipment installation of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:01
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-03: Audit of completed settlement report of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 13:54
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Tender package TV03: Construction supervision consultancy for construction work items package XL01 of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
09/03/2024 20:36
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TB03: Providing 250 new 20DC containers and 250 new 40DC containers of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
25/02/2024 21:36
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Contract package TB02: Providing 225 new 20DC containers and 225 new 40DC containers of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
25/02/2024 21:28
The data sheet has been partially hidden, to see the full information please Login or Register
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bid package Concentrated shopping asset insurance, equipment and public responsibilities in 2025-2026 of seaport enterprises of Vietnam Maritime Corporation - .
- Winning bidder: BaoViet Insurance Corporation, Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
11/06/2025 10:20
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bidding package Concentrated shopping asset insurance, equipment and public responsibilities in 2025-2026 of seaport enterprises of Vietnam Maritime Corporation - with 2 participating contractors .
11/04/2025 09:33
MARITIME PROJECT MANAGEMENT UNIT - VIMC publishes Tender Notice Concentrated shopping asset insurance, equipment and public responsibilities in 2025-2026 of seaport enterprises of Vietnam Maritime Corporation - in the form Open bidding .
31/03/2025 13:23
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bid package Bidding package TV01: Topographic and geological survey consulting; Prepare a report assessing the impact of flood drainage and river bed developments; Prepare detailed planning at 1/500 scale; Prepare a feasibility study report for the Ninh Giang inland waterway port construction investment project .
- Winning bidder: CONSTRUCTION CONSULTATION JOINT STOCK COMPANY FOR MARITIME BUILDING, FIRST INVESTMENT AND DESIGN CONSULTANCY JOINT STOCK COMPANY
18/03/2025 15:46
MARITIME PROJECT MANAGEMENT UNIT - VIMC publishes Tender Notice Concentrated shopping asset insurance, equipment and public responsibilities in 2025-2026 of seaport enterprises of Vietnam Maritime Corporation - in the form Open bidding .
11/03/2025 08:58
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bidding package Bidding package TV01: Topographic and geological survey consulting; Prepare a report assessing the impact of flood drainage and river bed developments; Prepare detailed planning at 1/500 scale; Prepare a feasibility study report for the Ninh Giang inland waterway port construction investment project with 1 participating contractors .
18/02/2025 09:05
MARITIME PROJECT MANAGEMENT UNIT - VIMC publishes Tender Notice Bidding package TV01: Topographic and geological survey consulting; Prepare a report assessing the impact of flood drainage and river bed developments; Prepare detailed planning at 1/500 scale; Prepare a feasibility study report for the Ninh Giang inland waterway port construction investment project in the form Open bidding .
22/01/2025 13:48
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bid package Providing centralized insurance services for ship hulls in 2025 for the fleet of Vietnam Maritime Corporation .
- Winning bidder: Tổng Công ty cổ phần bảo hiểm Petrolimex, PVI Insurance, BaoViet Insurance Corporation, military insurance corporation, BAO MINH INSURANCE CORPORATION, Vietinbank Insurance
31/12/2024 15:14
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bid package Construction and installation of construction equipment .
- Winning bidder: HA NOI CONSTRUCTION ESTABLISING FIRE PREVENTION EXTINGUISHMENT JOINT STOCK COMPANY
26/12/2024 12:10
MARITIME PROJECT MANAGEMENT UNIT - VIMC announced the results of the bidding package Providing centralized insurance services for ship hulls in 2025 for the fleet of Vietnam Maritime Corporation with 1 participating contractors .
17/12/2024 11:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Tender package TV02: Consultancy and verification of construction drawing design, construction cost estimate of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:34
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-02: Construction supervision of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:30
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-03: Audit of completed project settlement report of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:27
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package PTV bidding package: Construction and installation insurance of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:24
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Bidding package TV-01: Preparation of bidding documents, evaluation of bidding documents for PC bidding package of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:20
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-02: Construction supervision and equipment installation of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 14:01
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TV-03: Audit of completed settlement report of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
14/11/2024 13:54
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Tender package TV03: Construction supervision consultancy for construction work items package XL01 of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
09/03/2024 20:36
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Package TB03: Providing 250 new 20DC containers and 250 new 40DC containers of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
25/02/2024 21:36
The Bid solicitor MARITIME PROJECT MANAGEMENT UNIT - VIMC has posted the results of the bidding package Contract package TB02: Providing 225 new 20DC containers and 225 new 40DC containers of the investor MARITIME PROJECT MANAGEMENT UNIT - VIMC.
25/02/2024 21:28
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MARITIME PROJECT MANAGEMENT UNIT - VIMC is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor MARITIME PROJECT MANAGEMENT UNIT - VIMC is the owner of 11 contractor selection plan. In which, they self-invite 11 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor MARITIME PROJECT MANAGEMENT UNIT - VIMC is the investor of 20 package, of which 20 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MARITIME PROJECT MANAGEMENT UNIT - VIMC is the owner of 21 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor MARITIME PROJECT MANAGEMENT UNIT - VIMC has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MARITIME PROJECT MANAGEMENT UNIT - VIMC is an investor with 26 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.