Data analysis results of DauThau.info software for project owners MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 49 contractors.
- Announced 13 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 32 contractor selection plans with a total of 84 bidding packages, of which 17 prequalification documents have not found the investment project
- Has invited bids for 24 packages (with 26 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 63 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 45 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 20 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.60 contractors.
- Breakdown by bidding field: Goods 26.92%, Construction 34.62%, Consultancy 0%, Non-consultancy 38.46%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 71,357,121,564 VND, of which the total winning bid value is: 66,686,783,129 VND.
- The savings rate is: 6.55%.
Data analysis results of DauThau.info software for project owners MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED as follows:
- Has relationships with 49 contractors.
- The average number of contractors participating in each bidding package is: 2.60 contractors.
- Proportion of bidding fields: Goods 26.92%, Construction 34.62%, Consulting 0%, Non-consulting 38.46%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 71,357,121,564 VND, in which the total winning value is: 66,686,783,129 VND.
- The savings rate is: 6.55%.
You need to Login or Sign up to view all informations.
- Participated in 15 bidding packages, of which 11 were won, 4 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 95.93% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.26% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : An Giang (7), Lâm Đồng (2), TP.Hồ Chí Minh (2), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : An Giang (6), Lâm Đồng (2), Bà Rịa - Vũng Tàu (1), Undefined (6)
- Has relationships with 7 Bid Solicitors
- Has competed against 9 contractors in 4 bidding packages, won 0 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 16 bidding packages with 10 roles.
- Name of construction organization: Công ty TNHH MTV Công nghiệp Hóa chất mỏ Nam Bộ - Micco
- Code of capacity certificate of construction activities: 00016941
- Issuer: Sở Kế hoạch và Đầu tư tỉnh Bà Rịa - Vũng Tàu
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Khai thác mỏ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Geological Survey of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CONSTRUCTION DESIGN & CONSULTANT CORPORATION
27/10/2025 15:16
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Topographic survey of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CONSTRUCTION DESIGN & CONSULTANT CORPORATION
27/10/2025 15:14
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Verification of Feasibility Study Report of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: TAT CONSTRUCTION DESIGN CONSULTANCY COMPANY LIMITED
27/10/2025 15:10
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Prepare feasibility study report of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: KIM LONG CONSTRUCTION DESIGN AND CONSULTING SERVICES COMPANY LIMITED
27/10/2025 14:59
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the request Investment in production operator - HCM Southern region of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with 4 bidding package.
15/10/2025 21:26
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED Posted Development Investment Project Investment in production operator - HCM Southern region.
15/10/2025 21:21
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Supervision of construction works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: KIM LONG CONSTRUCTION DESIGN AND CONSULTING SERVICES COMPANY LIMITED
26/09/2025 10:47
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG BÙI PHÁT
12/09/2025 13:41
Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted Tender Notice Civil Works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with the form Open bidding.
21/08/2025 15:09
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the request Investing in upgrading and expanding Binh Duong IEM warehouse of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with 7 bidding package.
18/08/2025 16:11
The data sheet has been partially hidden, to see the full information please Login or Register
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Invest in explosive speed meter .
- Winning bidder: RAILTEQ TECHNOLOGIES EQUIPMENT JOINT STOCK COMPANY
24/07/2025 16:33
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Independent audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN - TƯ VẤN ĐẤT VIỆT
15/07/2025 14:27
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Evaluation of bidding documents and contractor selection results .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ BÌNH DƯƠNG CITY
23/06/2025 18:45
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Prepare bidding documents and evaluate bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TỔNG HỢP VÕ GIA
19/06/2025 15:58
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED publishes the plan Investing in vehicles, equipment for production in 2025 - Ho Chi Minh City with 5 bidding package .
12/06/2025 12:35
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Repairing roads to IEM warehouse BRVT .
- Winning bidder: NAM VIET PM CONSTRUCTION AND TRADING SERVICES COMPANY LIMITED
09/06/2025 10:53
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bidding package Repairing roads to IEM warehouse BRVT with 2 participating contractors .
30/05/2025 08:32
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED publishes Tender Notice Repairing roads to IEM warehouse BRVT in the form Competitive Offer .
23/05/2025 08:36
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED publishes the plan Repairing roads to IEM warehouse BRVT with 1 bidding package .
20/05/2025 16:11
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED announced the results of the bid package Repair of fence walls 2, 3, 4, 6, 8 - IEM warehouse cluster .
- Winning bidder: NAM VIET PM CONSTRUCTION AND TRADING SERVICES COMPANY LIMITED
09/05/2025 09:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Geological Survey of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CONSTRUCTION DESIGN & CONSULTANT CORPORATION
27/10/2025 15:16
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Topographic survey of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CONSTRUCTION DESIGN & CONSULTANT CORPORATION
27/10/2025 15:14
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Verification of Feasibility Study Report of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: TAT CONSTRUCTION DESIGN CONSULTANCY COMPANY LIMITED
27/10/2025 15:10
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Prepare feasibility study report of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: KIM LONG CONSTRUCTION DESIGN AND CONSULTING SERVICES COMPANY LIMITED
27/10/2025 14:59
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the request Investment in production operator - HCM Southern region of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with 4 bidding package.
15/10/2025 21:26
MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED Posted Development Investment Project Investment in production operator - HCM Southern region.
15/10/2025 21:21
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Supervision of construction works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: KIM LONG CONSTRUCTION DESIGN AND CONSULTING SERVICES COMPANY LIMITED
26/09/2025 10:47
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG BÙI PHÁT
12/09/2025 13:41
Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted Tender Notice Civil Works of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with the form Open bidding.
21/08/2025 15:09
The Bid solicitor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has posted the request Investing in upgrading and expanding Binh Duong IEM warehouse of the investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED with 7 bidding package.
18/08/2025 16:11
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED is the investor of 13 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED is the owner of 32 contractor selection plan. In which, they self-invite 26 of contractor selection plan, other units invite bids of 6 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED is the investor of 26 package, of which 5 package is self-invited, other units invite bid 21 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED is the owner of 63 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor MICCO - NAM BO MINING CHEMICAL INDUSTRY COMPANY LIMITED is an investor with 49 contractor. The data sheet has been partially hidden, to see the full information please Login or Register