Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 184 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 44 contractor selection plans with a total of 74 bidding packages, of which 25 prequalification documents have not found the investment project
- Has invited bids for 101 packages (with 101 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 537 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 440 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.43 contractors.
- Breakdown by bidding field: Goods 7.00%, Construction 11.00%, Consultancy 40.00%, Non-consultancy 41.00%, Mixed 1.00%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,355,991,221,472 VND, of which the total winning bid value is: 2,304,459,817,034 VND.
- The savings rate is: 2.19%.
Data analysis results of DauThau.info software for project owners NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 184 contractors.
- The average number of contractors participating in each bidding package is: 2.43 contractors.
- Proportion of bidding fields: Goods 7.00%, Construction 11.00%, Consulting 40.00%, Non-consulting 41.00%, Mixed 1.00%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,355,991,221,472 VND, in which the total winning value is: 2,304,459,817,034 VND.
- The savings rate is: 2.19%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NDVT.G10: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package HH2.TH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G05: Supply, transport and install VTTB substation 110kV of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NE. G06: Construction of 110k . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package TT.G12: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH Kế toán, Kiểm toán Việt Nam
06/12/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Contact LH.G06: Construction of 110kV . transmission line .
- Winning bidder: CÔNG TY CP XÂY DỰNG ĐIỆN VNECO4, TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package LH.G14: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ PNT, CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NDVT.G10: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ ĐỊNH GIÁ A-Z VIỆT NAM, CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 .
- Winning bidder: CÔNG TY CỔ PHẦN MAI HOÀNG GIA, CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Package 08: Audit of completed projects .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN UHY, CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Package 08: Audit of completed projects .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN UHY, CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package HH2.TH.G14: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ ĐỊNH GIÁ A-Z VIỆT NAM, CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line with 2 participating contractors .
07/12/2022 20:04
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package LH.G05: Supply, transport and install VTTB substation 110kV .
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NE. G06: Construction of 110k . transmission line .
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NDVT.G10: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package HH2.TH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G05: Supply, transport and install VTTB substation 110kV of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NE. G06: Construction of 110k . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package TT.G12: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH Kế toán, Kiểm toán Việt Nam
06/12/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD is the owner of 44 contractor selection plan. In which, they self-invite 44 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD is the investor of 101 package, of which 97 package is self-invited, other units invite bid 4 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD is the owner of 537 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD is an investor with 184 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.