Data analysis results of DauThau.info software for project owners OBMB EVNHCMC as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 77 contractors.
- Announced 7 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 63 contractor selection plans with a total of 58 bidding packages, of which 63 prequalification documents have not found the investment project
- Has invited bids for 48 packages (with 52 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 36 packages, and canceled bids for 1 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 32 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.80 contractors.
- Breakdown by bidding field: Goods 15.38%, Construction 26.92%, Consultancy 32.69%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 25,192,937,923 VND, of which the total winning bid value is: 21,603,635,852 VND.
- The savings rate is: 14.25%.
Data analysis results of DauThau.info software for project owners OBMB EVNHCMC as follows:
- Has relationships with 77 contractors.
- The average number of contractors participating in each bidding package is: 2.80 contractors.
- Proportion of bidding fields: Goods 15.38%, Construction 26.92%, Consulting 32.69%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 25,192,937,923 VND, in which the total winning value is: 21,603,635,852 VND.
- The savings rate is: 14.25%.
You need to Login or Sign up to view all informations.
- Participated in 13 bidding packages, of which 6 were won, 5 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 64.88% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.46% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (11), Nghệ An (1), Cần Thơ (1)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (8), Bình Dương (2), Nghệ An (1), Bà Rịa - Vũng Tàu (1), Cần Thơ (1)
- Has relationships with 12 Bid Solicitors
- Has competed against 25 contractors in 10 bidding packages, won 3 packages, lost 5 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 7 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" of the investor OBMB EVNHCMC.
- Winning bidder: Công ty TNHH Thương Mại Dịch Vụ Thiết Kế Xây Dựng Việt Hoàng
06/11/2021 13:09
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction supervision consultant for projects "Major repair of floors 9,10 of Green Power building to ensure working conditions for the Corporation's departments and units" of the investor OBMB EVNHCMC.
03/11/2021 16:48
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction and installation of electrical and network systems" of the investor OBMB EVNHCMC.
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng và thương mại Vũ Hoàng
03/11/2021 16:39
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on 9th and 10th floors of Green Power Building to ensure working conditions for departments and units of the Corporation - items: construction of fire protection systems and air conditioning systems " of the investor OBMB EVNHCMC.
03/11/2021 16:21
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction of foundation, floor, wall, drywall" of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY CỔ PHẦN ILY FUR
03/11/2021 16:17
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Consulting, surveying, setting up PAKT-DT and supervising the construction of the project “Major repair of Green Power building – 3 basements water-painting item” of the investor OBMB EVNHCMC.
- Winning bidder: Công ty Cổ phần Tư vấn Thiết kế Xây dựng Dịch vụ An Vạn Phúc
20/10/2021 16:35
The Bid solicitor OBMB EVNHCMC has posted the request Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" of the investor OBMB EVNHCMC with 1 bidding package.
06/10/2021 12:40
The Bid solicitor OBMB EVNHCMC has posted the request Bidding packages "Major repair of floors 9, 10 of Green Power buildings to ensure working conditions for departments and units of the Corporation" of the investor OBMB EVNHCMC with 4 bidding package.
01/10/2021 16:47
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller". of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG HỒNG LIÊM
01/09/2021 18:10
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Equipping automatic temperature monitoring device at Green Power building, phase 2 of the investment project Equipping automatic temperature monitoring device at Green Power building, phase 2 of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ TRỰC TUYẾN
30/06/2021 11:37
The data sheet has been partially hidden, to see the full information please Login or Register
OBMB EVNHCMC announced the results of the bid package Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" .
- Winning bidder: Công ty TNHH Thương Mại Dịch Vụ Thiết Kế Xây Dựng Việt Hoàng
06/11/2021 13:09
OBMB EVNHCMC announced the results of the bid package Construction supervision consultant for projects "Major repair of floors 9,10 of Green Power building to ensure working conditions for the Corporation's departments and units" .
- Winning bidder: CÔNG TY CỔ PHẦN DỊCH VỤ KỸ THUẬT VÀ THƯƠNG MẠI VIỆT Á
03/11/2021 16:48
OBMB EVNHCMC announced the results of the bid package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction and installation of electrical and network systems" .
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng và thương mại Vũ Hoàng
03/11/2021 16:39
OBMB EVNHCMC announced the results of the bid package Construction of major repair works on 9th and 10th floors of Green Power Building to ensure working conditions for departments and units of the Corporation - items: construction of fire protection systems and air conditioning systems " .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG THƯƠNG MẠI DỊCH VỤ GIA MINH
03/11/2021 16:21
OBMB EVNHCMC announced the results of the bid package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction of foundation, floor, wall, drywall" .
- Winning bidder: CÔNG TY CỔ PHẦN ILY FUR
03/11/2021 16:17
OBMB EVNHCMC announced the results of the bid package Consulting, surveying, setting up PAKT-DT and supervising the construction of the project “Major repair of Green Power building – 3 basements water-painting item” .
- Winning bidder: Công ty Cổ phần Tư vấn Thiết kế Xây dựng Dịch vụ An Vạn Phúc
20/10/2021 16:35
OBMB EVNHCMC publishes the plan Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" with 1 bidding package .
06/10/2021 12:40
OBMB EVNHCMC publishes the plan Bidding packages "Major repair of floors 9, 10 of Green Power buildings to ensure working conditions for departments and units of the Corporation" with 4 bidding package .
01/10/2021 16:47
OBMB EVNHCMC announced the results of the bid package Construction of "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller". .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG HỒNG LIÊM
01/09/2021 18:10
OBMB EVNHCMC announced the results of the bidding package Consulting, surveying, setting up PAKT-DT and supervising the construction of the project “Major repair of Green Power building – 3 basements water-painting item” with 2 participating contractors .
13/08/2021 19:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" of the investor OBMB EVNHCMC.
- Winning bidder: Công ty TNHH Thương Mại Dịch Vụ Thiết Kế Xây Dựng Việt Hoàng
06/11/2021 13:09
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction supervision consultant for projects "Major repair of floors 9,10 of Green Power building to ensure working conditions for the Corporation's departments and units" of the investor OBMB EVNHCMC.
03/11/2021 16:48
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction and installation of electrical and network systems" of the investor OBMB EVNHCMC.
- Winning bidder: Công ty cổ phần tư vấn đầu tư xây dựng và thương mại Vũ Hoàng
03/11/2021 16:39
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on 9th and 10th floors of Green Power Building to ensure working conditions for departments and units of the Corporation - items: construction of fire protection systems and air conditioning systems " of the investor OBMB EVNHCMC.
03/11/2021 16:21
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of major repair works on the 9th and 10th floors of Green Power Building to ensure working conditions for the Boards and units of the Corporation - items: construction of foundation, floor, wall, drywall" of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY CỔ PHẦN ILY FUR
03/11/2021 16:17
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Consulting, surveying, setting up PAKT-DT and supervising the construction of the project “Major repair of Green Power building – 3 basements water-painting item” of the investor OBMB EVNHCMC.
- Winning bidder: Công ty Cổ phần Tư vấn Thiết kế Xây dựng Dịch vụ An Vạn Phúc
20/10/2021 16:35
The Bid solicitor OBMB EVNHCMC has posted the request Construction supervision consultant "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller" of the investor OBMB EVNHCMC with 1 bidding package.
06/10/2021 12:40
The Bid solicitor OBMB EVNHCMC has posted the request Bidding packages "Major repair of floors 9, 10 of Green Power buildings to ensure working conditions for departments and units of the Corporation" of the investor OBMB EVNHCMC with 4 bidding package.
01/10/2021 16:47
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Construction of "major repair of central air conditioning system: cooling water pump system, secondary cold water pump, primary cold water pump, chiller chiller". of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG HỒNG LIÊM
01/09/2021 18:10
The Bid solicitor OBMB EVNHCMC has posted the results of the bidding package Equipping automatic temperature monitoring device at Green Power building, phase 2 of the investment project Equipping automatic temperature monitoring device at Green Power building, phase 2 of the investor OBMB EVNHCMC.
- Winning bidder: CÔNG TY TNHH GIẢI PHÁP CÔNG NGHỆ TRỰC TUYẾN
30/06/2021 11:37
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor OBMB EVNHCMC is the investor of 7 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor OBMB EVNHCMC is the owner of 63 contractor selection plan. In which, they self-invite 63 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor OBMB EVNHCMC is the investor of 52 package, of which 50 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor OBMB EVNHCMC is the owner of 36 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor OBMB EVNHCMC has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor OBMB EVNHCMC is an investor with 77 contractor. The data sheet has been partially hidden, to see the full information please Login or Register