Data analysis results of DauThau.info software for project owners Office Building Managerment Board as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 1 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 219,145,661 VND, of which the total winning bid value is: 209,000,000 VND.
- The savings rate is: 4.63%.
Data analysis results of DauThau.info software for project owners Office Building Managerment Board as follows:
- Has relationships with 1 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 219,145,661 VND, in which the total winning value is: 209,000,000 VND.
- The savings rate is: 4.63%.
You need to Login or Sign up to view all informations.
- Participated in 13 bidding packages, of which 6 were won, 5 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 64.88% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.46% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (11), Nghệ An (1), Cần Thơ (1)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (8), Bình Dương (2), Nghệ An (1), Bà Rịa - Vũng Tàu (1), Cần Thơ (1)
- Has relationships with 12 Bid Solicitors
- Has competed against 25 contractors in 10 bidding packages, won 3 packages, lost 5 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 7 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Office Building Managerment Board has posted the results of the bidding package Install outdoor light boards with signs and business names (Posted on bidding newspaper No. 200 dated 23/10/2017) of the investor Office Building Managerment Board.
- Winning bidder: Công ty TNHH Xây dựng Thương mại Gia Cư
23/10/2017 07:54
The Bid solicitor Office Building Managerment Board has posted the request Major repair work of Green Power building - Tiled part of emergency stairs (MCT:03D170701) of the investor Office Building Managerment Board with 1 bidding package.
28/08/2017 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
Office Building Managerment Board announced the results of the bid package Install outdoor light boards with signs and business names (Posted on bidding newspaper No. 200 dated 23/10/2017) .
- Winning bidder: Công ty TNHH Xây dựng Thương mại Gia Cư
23/10/2017 07:54
Office Building Managerment Board publishes Tender Notice Construction supervision consultant "Major repair of Green Power building - Tiled part of emergency stairs (MCT:03D170701)" (Posted on bidding newspaper No. 162 on August 29, 2017) in the form Open bidding (Only select domestic contractors) .
29/08/2017 07:19
Office Building Managerment Board publishes Tender Notice Consulting, surveying and setting up PAKT-DT Project "Major repair of Green Power building - Tiled part of emergency stairs (MCT: 03D170701)" and Project of "Major repair of Green Power building - Epoxy floor coating part tunnel (MCT:03D170702)” (Published on bidding newspaper No. 245 dated 22/12/2016) in the form National competitive bidding .
22/12/2016 08:53
Office Building Managerment Board publishes Tender Notice Consulting, surveying and setting up PAKT-DT Project "Major repair of Green Power building - Tiled part of emergency stairs (MCT: 03D170701)" and Project of "Major repair of Green Power building - Epoxy floor coating part tunnel (MCT:03D170702)”. (Posted on the auction newspaper No. 220 on November 17, 2016) in the form National competitive bidding .
17/11/2016 08:46
Office Building Managerment Board publishes Tender Notice Equipped with 01 Led screen system behind the hall. (Posted on the auction newspaper No. 190 on October 6, 2016) in the form National Competitive Bidding .
06/10/2016 07:31
Office Building Managerment Board publishes Tender Notice Equipped with 01 projector in the hall of Green Power building (Posted on bidding newspaper No. 93 on May 23, 2016) in the form National shortened competitive bidding .
23/05/2016 07:48
Office Building Managerment Board publishes Tender Notice Equipped with 01 led screen system in the hall of Green Power building (November 214 dated 10/11/2015) in the form National Competitive Bidding .
10/11/2015 08:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Office Building Managerment Board has posted the results of the bidding package Install outdoor light boards with signs and business names (Posted on bidding newspaper No. 200 dated 23/10/2017) of the investor Office Building Managerment Board.
- Winning bidder: Công ty TNHH Xây dựng Thương mại Gia Cư
23/10/2017 07:54
The Bid solicitor Office Building Managerment Board has posted the request Major repair work of Green Power building - Tiled part of emergency stairs (MCT:03D170701) of the investor Office Building Managerment Board with 1 bidding package.
28/08/2017 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Office Building Managerment Board is the owner of 1 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor Office Building Managerment Board is the owner of 1 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Office Building Managerment Board has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Office Building Managerment Board is an investor with 1 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.