Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners PMU7 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 193 contractors.
- Announced 12 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 77 contractor selection plans with a total of 157 bidding packages, of which 17 prequalification documents have not found the investment project
- Has invited bids for 110 packages (with 140 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 230 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 126 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 37 packages that have not fully posted the contractor selection results. Of these 33 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.84 contractors.
- Breakdown by bidding field: Goods 7.14%, Construction 21.43%, Consultancy 55.00%, Non-consultancy 15.00%, Mixed 1.43%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 33,879,220,906,934 VND, of which the total winning bid value is: 31,830,635,335,787 VND.
- The savings rate is: 6.05%.
Data analysis results of DauThau.info software for project owners PMU7 as follows:
- Has relationships with 193 contractors.
- The average number of contractors participating in each bidding package is: 2.84 contractors.
- Proportion of bidding fields: Goods 7.14%, Construction 21.43%, Consulting 55.00%, Non-consulting 15.00%, Mixed 1.43%, Other 0%.
- The total value according to the bidding package with valid IMP is: 33,879,220,906,934 VND, in which the total winning value is: 31,830,635,335,787 VND.
- The savings rate is: 6.05%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PMU7 has posted the results of the bidding package BHGT02: Construction insurance during the installation of GT02 bidding package of the investor PMU7.
- Winning bidder: BaoViet Insurance Corporation
07/01/2026 11:19
The Bid solicitor PMU7 has posted the results of the bidding package TVGS.GT02: Consulting on supervision of construction and installation of gt02 bidding equipment of the investor PMU7.
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
07/01/2026 09:27
The Bid solicitor PMU7 has posted the results of the bidding package Bidding package GT02: Supply and installation of traffic monitoring and operating systems of the investor PMU7.
- Winning bidder: ELCOM TECHNOLOGY COMMUNICATIONS CORPORATION
29/12/2025 17:44
The Bid solicitor PMU7 has posted the results of the bidding package GT02: Supply and install equipment of the GSHGT system of the investor PMU7.
- Winning bidder: HITD - HIGH DIGITAL TECHNOLOGY JOINT STOCK COMPANY
29/12/2025 17:34
The Bid solicitor PMU7 has posted the results of the bidding package Bidding package TB.01: Supply and install ITS system equipment of the investor PMU7.
- Winning bidder: VIETNAM POSTS AND TELECOMMUNICATIONS GROUP
16/12/2025 10:56
The Bid solicitor PMU7 has posted the results of the bidding package Package TV10.01: Consulting on auditing the Project Finalization report on completion of additional items of the investor PMU7.
- Winning bidder: THAI DUONG AUDIT COMPANY LIMITED
03/12/2025 15:05
The Bid solicitor PMU7 has posted the results of the bidding package TVTT.EP: Design verification consultancy, estimation of EP bidding package. of the investor PMU7.
- Winning bidder: THONG NHAT INFRASTRUCTURE CONSULTING JOINT STOCK COMPANY
02/12/2025 14:36
PMU7 Posted Development Investment Project Investment and construction project to expand Ho Chi Minh City - Trung Luong - My Thuan expressway according to the public-private partnership method.
01/12/2025 15:15
The Bid solicitor PMU7 has posted the results of the bidding package TVGS.EP: Supervision consultancy supply and installation of goods for EP bidding package. of the investor PMU7.
- Winning bidder: VIC SOLUTION TECHNOLOGY AND CONSULTANT COMPANY LIMITED
26/11/2025 16:23
The Bid solicitor PMU7 has posted the results of the bidding package Bidding Package TV18: Consulting on base design verification and construction investment cost calculation for traffic database management system of the investor PMU7.
- Winning bidder: THONG NHAT INFRASTRUCTURE CONSULTING JOINT STOCK COMPANY
19/11/2025 13:50
The data sheet has been partially hidden, to see the full information please Login or Register
PMU7 publishes the plan Contractor selection plan - Project of component of Van Phong - Nha Trang part of the project of building the North - South Expressway works in the East period 2021 - 2025 with 26 bidding package .
23/07/2025 15:58
PMU7 announced the results of the bid package Bidding Package TV.10: Technical design verification consultancy, ITS system estimates .
- Winning bidder: INTELLIGENT TECHNOLOGY DESIGN CONSULTING COMPANY LIMITED
02/07/2025 15:06
PMU7 announced the results of the bid package Package TV13: Consulting on appraisal of materials and equipment of traffic monitoring and administration systems .
- Winning bidder: NGHIA HUNG SERVICE - VALUE JOINT STOCK COMPANY
02/07/2025 14:44
PMU7 publishes the plan Contractor selection plan -The component project of Chi Thanh - Van Phong section belongs to the project of building the North -South Expressway Construction in the East period 2021 - 2025 with 20 bidding package .
26/06/2025 08:50
PMU7 publishes the plan Supplementing the plan to select contractor projects Investment Investment in My Thuan 2 Bridge and the two ends of the bridge under the construction project of some high -speed road sections on the North -South route in the East period 2017-2020 with 7 bidding package .
17/06/2025 10:45
PMU7 announced the results of the bid package Package GT02: Supply and installation of equipment for traffic monitoring and management systems .
- Winning bidder: ELCOM TECHNOLOGY COMMUNICATIONS CORPORATION, HITD- HIGH DIGITAL TECHNOLOGY JOINT STOCK COMPANY
30/05/2025 19:18
PMU7 announced the results of the bidding package Bidding package TV.07: Consulting on auditing and finalizing completed projects with 3 participating contractors .
23/05/2025 11:00
PMU7 announced the results of the bidding package Bidding package TV09: Consulting on auditing and finalizing completed projects with 4 participating contractors .
23/05/2025 10:01
PMU7 publishes the plan Contractor selection plan - Component project of Van Phong - Nha Trang section under the Eastern North - South Expressway Construction Project in the period 2021 - 2025 with 27 bidding package .
23/05/2025 08:53
PMU7 publishes the plan Contractor selection plan - Component project of Van Phong - Nha Trang section under the Eastern North - South Expressway Construction Project in the period 2021 - 2025 with 26 bidding package .
15/05/2025 17:28
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PMU7 has posted the results of the bidding package BHGT02: Construction insurance during the installation of GT02 bidding package of the investor PMU7.
- Winning bidder: BaoViet Insurance Corporation
07/01/2026 11:19
The Bid solicitor PMU7 has posted the results of the bidding package TVGS.GT02: Consulting on supervision of construction and installation of gt02 bidding equipment of the investor PMU7.
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
07/01/2026 09:27
The Bid solicitor PMU7 has posted the results of the bidding package Bidding package GT02: Supply and installation of traffic monitoring and operating systems of the investor PMU7.
- Winning bidder: ELCOM TECHNOLOGY COMMUNICATIONS CORPORATION
29/12/2025 17:44
The Bid solicitor PMU7 has posted the results of the bidding package GT02: Supply and install equipment of the GSHGT system of the investor PMU7.
- Winning bidder: HITD - HIGH DIGITAL TECHNOLOGY JOINT STOCK COMPANY
29/12/2025 17:34
The Bid solicitor PMU7 has posted the results of the bidding package Bidding package TB.01: Supply and install ITS system equipment of the investor PMU7.
- Winning bidder: VIETNAM POSTS AND TELECOMMUNICATIONS GROUP
16/12/2025 10:56
The Bid solicitor PMU7 has posted the results of the bidding package Package TV10.01: Consulting on auditing the Project Finalization report on completion of additional items of the investor PMU7.
- Winning bidder: THAI DUONG AUDIT COMPANY LIMITED
03/12/2025 15:05
The Bid solicitor PMU7 has posted the results of the bidding package TVTT.EP: Design verification consultancy, estimation of EP bidding package. of the investor PMU7.
- Winning bidder: THONG NHAT INFRASTRUCTURE CONSULTING JOINT STOCK COMPANY
02/12/2025 14:36
PMU7 Posted Development Investment Project Investment and construction project to expand Ho Chi Minh City - Trung Luong - My Thuan expressway according to the public-private partnership method.
01/12/2025 15:15
The Bid solicitor PMU7 has posted the results of the bidding package TVGS.EP: Supervision consultancy supply and installation of goods for EP bidding package. of the investor PMU7.
- Winning bidder: VIC SOLUTION TECHNOLOGY AND CONSULTANT COMPANY LIMITED
26/11/2025 16:23
The Bid solicitor PMU7 has posted the results of the bidding package Bidding Package TV18: Consulting on base design verification and construction investment cost calculation for traffic database management system of the investor PMU7.
- Winning bidder: THONG NHAT INFRASTRUCTURE CONSULTING JOINT STOCK COMPANY
19/11/2025 13:50
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU7 is the investor of 12 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor PMU7 is the owner of 77 contractor selection plan. In which, they self-invite 64 of contractor selection plan, other units invite bids of 13 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor PMU7 is the investor of 140 package, of which 124 package is self-invited, other units invite bid 16 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU7 is the owner of 230 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor PMU7 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU7 is an investor with 193 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.