Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners POWER TRANSMISSION SERVICE COMPANY as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 79 contractors.
- Announced 19 development investment project, of which 5 projects that have not announced the contractor selection plan.
- Announced 56 contractor selection plans with a total of 62 bidding packages, of which 38 prequalification documents have not found the investment project
- Has invited bids for 52 packages (with 52 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 65 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 21 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.03 contractors.
- Breakdown by bidding field: Goods 40.38%, Construction 3.85%, Consultancy 32.69%, Non-consultancy 23.08%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 105,038,536,401 VND, of which the total winning bid value is: 93,691,426,943 VND.
- The savings rate is: 10.80%.
Data analysis results of DauThau.info software for project owners POWER TRANSMISSION SERVICE COMPANY as follows:
- Has relationships with 79 contractors.
- The average number of contractors participating in each bidding package is: 2.03 contractors.
- Proportion of bidding fields: Goods 40.38%, Construction 3.85%, Consulting 32.69%, Non-consulting 23.08%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 105,038,536,401 VND, in which the total winning value is: 93,691,426,943 VND.
- The savings rate is: 10.80%.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 5 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 33.24% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 74.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (3), Quảng Trị (2)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (3), Quảng Bình (2)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 3 bidding packages with 2 roles.
- Name of construction organization: CÔNG TY DỊCH VỤ KỸ THUẬT TRUYỀN TẢI ĐIỆN-CHI NHÁNH TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
- Code of capacity certificate of construction activities: 00016783
- Issuer:
- Fields:
⚬ Giám sát công tác xây dựng công trình: Công nghiệp (Đường dây và TBA)
⚬ Thi công xây dựng công trình: Thi công lắp đặt thiết bị công trình Công nghiệp (Đường dây và TBA)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Periodic health examination in 2025 for employees of electricity transmission technical service company of the investor POWER TRANSMISSION SERVICE COMPANY.
- Winning bidder: MEDICAL LABORATORY AND TECHNOLOGY COMPANY LIMITED
29/04/2025 23:08
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the request Cost estimates: Periodic health check for 2025 for employees of electricity transmission technical service companies of the investor POWER TRANSMISSION SERVICE COMPANY with 1 bidding package.
25/04/2025 09:46
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Package 7: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY.
03/03/2025 14:11
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Package 2: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY.
03/03/2025 14:07
Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted Tender Notice Package 7: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY with the form Open bidding.
14/01/2025 15:35
Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted Tender Notice Package 2: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY with the form Open bidding.
09/01/2025 14:01
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the request Contractor selection plan for the Project Production operator North West Technical Service Team of the investor POWER TRANSMISSION SERVICE COMPANY with 5 bidding package.
07/01/2025 20:43
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Print calendar for Lunar New Year 2025 of the investor POWER TRANSMISSION SERVICE COMPANY.
27/12/2024 17:14
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Building video clips in 2024 of the investor POWER TRANSMISSION SERVICE COMPANY.
26/12/2024 21:49
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Developing a video clip of NPTS Corporate Culture to serve communication work to celebrate the 70th anniversary of the electricity industry's tradition (December 21, 1954 - December 21, 2024) of the investor POWER TRANSMISSION SERVICE COMPANY.
26/12/2024 21:46
The data sheet has been partially hidden, to see the full information please Login or Register
POWER TRANSMISSION SERVICE COMPANY announced the results of the bid package Periodic health examination in 2025 for employees of electricity transmission technical service company .
- Winning bidder: MEDICAL LABORATORY AND TECHNOLOGY COMPANY LIMITED
29/04/2025 23:08
POWER TRANSMISSION SERVICE COMPANY publishes the plan Cost estimates: Periodic health check for 2025 for employees of electricity transmission technical service companies with 1 bidding package .
25/04/2025 09:46
POWER TRANSMISSION SERVICE COMPANY announced the results of the bid package Package 2: Auditing the completed project settlement report .
- Winning bidder: Vietnam Auditing, Accounting Company Limited
19/03/2025 15:00
POWER TRANSMISSION SERVICE COMPANY announced the results of the bid package Package 7: Auditing the completed project settlement report .
- Winning bidder: Vietnam Auditing, Accounting Company Limited
03/03/2025 14:11
POWER TRANSMISSION SERVICE COMPANY announced the results of the bid package Package 2: Auditing the completed project settlement report .
- Winning bidder: Vietnam Auditing, Accounting Company Limited
03/03/2025 14:07
POWER TRANSMISSION SERVICE COMPANY announced the results of the bidding package Package 2: Auditing the completed project settlement report with 1 participating contractors .
03/03/2025 09:14
POWER TRANSMISSION SERVICE COMPANY announced the results of the bid package EVNNPT's electronic information portal maintenance service .
- Winning bidder: STC TECHNOLOGY AND COMMUNICATION SERVICE CORPORATION
13/02/2025 17:02
POWER TRANSMISSION SERVICE COMPANY announced the results of the bidding package Package 7: Auditing the completed project settlement report with 1 participating contractors .
10/02/2025 09:30
POWER TRANSMISSION SERVICE COMPANY announced the results of the bidding package Package 2: Auditing the completed project settlement report with 1 participating contractors .
10/02/2025 09:03
POWER TRANSMISSION SERVICE COMPANY publishes Tender Notice Package 2: Auditing the completed project settlement report in the form Open bidding .
24/01/2025 17:55
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Periodic health examination in 2025 for employees of electricity transmission technical service company of the investor POWER TRANSMISSION SERVICE COMPANY.
- Winning bidder: MEDICAL LABORATORY AND TECHNOLOGY COMPANY LIMITED
29/04/2025 23:08
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the request Cost estimates: Periodic health check for 2025 for employees of electricity transmission technical service companies of the investor POWER TRANSMISSION SERVICE COMPANY with 1 bidding package.
25/04/2025 09:46
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Package 7: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY.
03/03/2025 14:11
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Package 2: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY.
03/03/2025 14:07
Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted Tender Notice Package 7: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY with the form Open bidding.
14/01/2025 15:35
Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted Tender Notice Package 2: Auditing the completed project settlement report of the investor POWER TRANSMISSION SERVICE COMPANY with the form Open bidding.
09/01/2025 14:01
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the request Contractor selection plan for the Project Production operator North West Technical Service Team of the investor POWER TRANSMISSION SERVICE COMPANY with 5 bidding package.
07/01/2025 20:43
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Print calendar for Lunar New Year 2025 of the investor POWER TRANSMISSION SERVICE COMPANY.
27/12/2024 17:14
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Building video clips in 2024 of the investor POWER TRANSMISSION SERVICE COMPANY.
26/12/2024 21:49
The Bid solicitor POWER TRANSMISSION SERVICE COMPANY has posted the results of the bidding package Developing a video clip of NPTS Corporate Culture to serve communication work to celebrate the 70th anniversary of the electricity industry's tradition (December 21, 1954 - December 21, 2024) of the investor POWER TRANSMISSION SERVICE COMPANY.
26/12/2024 21:46
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor POWER TRANSMISSION SERVICE COMPANY is the investor of 19 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor POWER TRANSMISSION SERVICE COMPANY is the owner of 56 contractor selection plan. In which, they self-invite 54 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor POWER TRANSMISSION SERVICE COMPANY is the investor of 52 package, of which 51 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor POWER TRANSMISSION SERVICE COMPANY is the owner of 65 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor POWER TRANSMISSION SERVICE COMPANY has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor POWER TRANSMISSION SERVICE COMPANY is an investor with 79 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.