Data analysis results of DauThau.info software for project owners PPMU as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 118 contractors.
- Announced 15 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 35 contractor selection plans with a total of 107 bidding packages, of which 8 prequalification documents have not found the investment project
- Has invited bids for 29 packages (with 41 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 271 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 243 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 31 packages that have not fully posted the contractor selection results. Of these 31 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.31 contractors.
- Breakdown by bidding field: Goods 0%, Construction 82.93%, Consultancy 17.07%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,035,224,484,011 VND, of which the total winning bid value is: 932,463,620,451 VND.
- The savings rate is: 9.93%.
Data analysis results of DauThau.info software for project owners PPMU as follows:
- Has relationships with 118 contractors.
- The average number of contractors participating in each bidding package is: 2.31 contractors.
- Proportion of bidding fields: Goods 0%, Construction 82.93%, Consulting 17.07%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,035,224,484,011 VND, in which the total winning value is: 932,463,620,451 VND.
- The savings rate is: 9.93%.
You need to Login or Sign up to view all informations.
- Participated in 64 bidding packages, of which 63 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.21% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.91% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Trị (38), Undefined (26)
- Provinces before the merger where the contractor has participated in bidding : Quảng Bình (38), Undefined (26)
- Has relationships with 8 Bid Solicitors
- Has competed against 2 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PPMU has posted the results of the bidding package Package No. 02/TV-VD: Verification of Technical Audit Report of the investor PPMU.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
30/12/2025 10:09
The Bid solicitor PPMU has posted the results of the bidding package Bidding package No. 01/TV-VD: Survey and preparation of Technical and Technical Report of the investor PPMU.
- Winning bidder: VIET TIN JOINT STOCK COMPANY
30/12/2025 10:01
The Bid solicitor PPMU has posted the request Contractor selection plan for project preparation phase, Emergency landslide protection embankment project in Truong An village, Tra Tri Phu village, Vinh Dinh commune of the investor PPMU with 3 bidding package.
27/12/2025 16:31
PPMU Posted Development Investment Project Emergency landslide protection embankment in Truong An hamlet, Tra Tri Phu hamlet, Vinh Dinh commune.
27/12/2025 16:16
The Bid solicitor PPMU has posted the results of the bidding package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
The Bid solicitor PPMU has posted the results of the bidding package Bidding package 20: Construction quality accreditation advice of the investor PPMU.
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
The Bid solicitor PPMU has posted the results of the bidding package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
The Bid solicitor PPMU has posted the results of the bidding package Contract package: Construction of additional items for Trooc Voc lake of the investor PPMU.
20/11/2025 15:10
The Bid solicitor PPMU has posted the results of the bidding package Survey, prepare and adjust the Feasibility Study Report and Design the Estimate of the investor PPMU.
- Winning bidder: CÔNG TY TNHH NAM VIỆT
20/11/2025 15:04
The Bid solicitor PPMU has posted the request Contractor selection plan (phase 2), Project: Upgrading Trooc Voc Lake of the investor PPMU with 1 bidding package.
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
PPMU announced the results of the bid package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives .
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
PPMU announced the results of the bid package Bidding package 20: Construction quality accreditation advice .
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
PPMU announced the results of the bid package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives .
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
PPMU announced the results of the bid package Package 18: Construction insurance .
- Winning bidder: BaoViet Insurance Corporation, PVI Insurance
15/10/2025 08:03
PPMU announced the results of the bid package Package No. 15/TV-TrV: Operating process .
- Winning bidder: CÔNG TY TNHH TƯ VẤN KHẢO SÁT – THIẾT KẾ HOÀNH SƠN
28/08/2025 16:19
PPMU announced the results of the bid package Package No. 09: Construction of works: embankment; Type 1 vessel anchor; Ship anchor system; Construction roads and works on the route .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP THẮNG LỢI, CÔNG TY TNHH TƯ VẤN XÂY DỰNG XUÂN QUANG, CÔNG TY TNHH XÂY DỰNG TỔNG HỢP TIÊN PHONG, CÔNG TY TNHH XÂY DỰNG TỔNG HỢP TOÀN THẮNG
09/07/2025 16:06
PPMU announced the results of the bid package Bidding package 09: Advice on cadastral measurement and compensation, support and resettlement plan .
- Winning bidder: CÔNG TY TNHH TƯ VẤN DỊCH VỤ THÀNH TUẤN
04/07/2025 08:16
PPMU announced the results of the bid package Package 12: Quality inspection of works .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ CÔNG NGHỆ THIÊN HOÀNG
02/07/2025 09:21
PPMU announced the results of the bid package Package 09: Construction insurance .
- Winning bidder: Công ty cổ phần Tập đoàn bảo hiểm DBV
02/07/2025 09:16
PPMU announced the results of the bid package Package No. 10: Construction of works: Dredging channels and parking areas + System of giving signals; System of vessel float + turtle anchor; San covering the face; Land barrier; Regulatory control to ensure traffic safety .
- Winning bidder: PHU XUAN CONSTRUCTION AND CONSULTANT JOINT STOCK COMPANY
28/06/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PPMU has posted the results of the bidding package Package No. 02/TV-VD: Verification of Technical Audit Report of the investor PPMU.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ CÔNG NGHỆ TECHCO
30/12/2025 10:09
The Bid solicitor PPMU has posted the results of the bidding package Bidding package No. 01/TV-VD: Survey and preparation of Technical and Technical Report of the investor PPMU.
- Winning bidder: VIET TIN JOINT STOCK COMPANY
30/12/2025 10:01
The Bid solicitor PPMU has posted the request Contractor selection plan for project preparation phase, Emergency landslide protection embankment project in Truong An village, Tra Tri Phu village, Vinh Dinh commune of the investor PPMU with 3 bidding package.
27/12/2025 16:31
PPMU Posted Development Investment Project Emergency landslide protection embankment in Truong An hamlet, Tra Tri Phu hamlet, Vinh Dinh commune.
27/12/2025 16:16
The Bid solicitor PPMU has posted the results of the bidding package Package No. 13: Survey advice on making a plan to clear mines and mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
23/12/2025 10:52
The Bid solicitor PPMU has posted the results of the bidding package Bidding package 20: Construction quality accreditation advice of the investor PPMU.
- Winning bidder: Northern Center for Construction Quality Contron
18/12/2025 14:46
The Bid solicitor PPMU has posted the results of the bidding package Package No. 07/TV-TRV: Clearance of bombs, mines and explosives of the investor PPMU.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
20/11/2025 17:07
The Bid solicitor PPMU has posted the results of the bidding package Contract package: Construction of additional items for Trooc Voc lake of the investor PPMU.
20/11/2025 15:10
The Bid solicitor PPMU has posted the results of the bidding package Survey, prepare and adjust the Feasibility Study Report and Design the Estimate of the investor PPMU.
- Winning bidder: CÔNG TY TNHH NAM VIỆT
20/11/2025 15:04
The Bid solicitor PPMU has posted the request Contractor selection plan (phase 2), Project: Upgrading Trooc Voc Lake of the investor PPMU with 1 bidding package.
20/11/2025 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PPMU is the investor of 15 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor PPMU is the owner of 35 contractor selection plan. In which, they self-invite 29 of contractor selection plan, other units invite bids of 6 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor PPMU is the investor of 41 package, of which 37 package is self-invited, other units invite bid 4 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PPMU is the owner of 271 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor PPMU has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PPMU is an investor with 118 contractor. The data sheet has been partially hidden, to see the full information please Login or Register