Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners PROJECT MANAGEMENT CONSTRUCTION DAK MIL as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 114 contractors.
- Announced 30 development investment project, of which 4 projects that have not announced the contractor selection plan.
- Announced 130 contractor selection plans with a total of 386 bidding packages, of which 110 prequalification documents have not found the investment project
- Has invited bids for 41 packages (with 44 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 415 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 376 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 250 packages that have not fully posted the contractor selection results. Of these 249 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 4.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 93.18%, Consultancy 6.82%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 456,910,949,375 VND, of which the total winning bid value is: 447,689,582,420 VND.
- The savings rate is: 2.02%.
Data analysis results of DauThau.info software for project owners PROJECT MANAGEMENT CONSTRUCTION DAK MIL as follows:
- Has relationships with 114 contractors.
- The average number of contractors participating in each bidding package is: 4.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 93.18%, Consulting 6.82%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 456,910,949,375 VND, in which the total winning value is: 447,689,582,420 VND.
- The savings rate is: 2.02%.
You need to Login or Sign up to view all informations.
- Participated in 17 bidding packages, of which 17 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 97% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.09% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (17)
- Provinces before the merger where the contractor has participated in bidding : Undefined (17)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School in project preparation stage of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 1 bidding package.
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL Posted Development Investment Project Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room.
05/08/2022 10:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Survey consulting of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:16
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:14
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
19/07/2022 16:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consulting survey, making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:00
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 3 bidding package.
19/07/2022 15:55
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room with 4 bidding package .
05/08/2022 11:08
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Le Loi Secondary School in project preparation stage with 1 bidding package .
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT .
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Survey consulting .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Vạn Tường
19/07/2022 16:16
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultancy on making feasibility study report .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Vạn Tường
19/07/2022 16:14
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase with 4 bidding package .
19/07/2022 16:10
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consulting survey, making feasibility study report .
- Winning bidder: Công ty TNHH DTAH
19/07/2022 16:00
PROJECT MANAGEMENT CONSTRUCTION DAK MIL publishes the plan Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase with 3 bidding package .
19/07/2022 15:55
PROJECT MANAGEMENT CONSTRUCTION DAK MIL announced the results of the bid package Consultancy on making feasibility study report .
- Winning bidder: Công ty TNHH tư vấn xây dựng P-T
19/07/2022 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty trách nhiệm hữu hạn một thành viên Kiến trúc Xây dựng DAKNONGLAND
05/08/2022 10:57
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Le Loi Secondary School in project preparation stage of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 1 bidding package.
05/08/2022 10:53
PROJECT MANAGEMENT CONSTRUCTION DAK MIL Posted Development Investment Project Le Loi Secondary School; Categories: 08-room classroom, library room, equipment room.
05/08/2022 10:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Expenses for making bid documents, evaluating bids for consulting and designing BVTC-DT of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
- Winning bidder: Công ty cổ phần đầu tư và xây dựng An Phát Đắk Nông
04/08/2022 14:28
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Survey consulting of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:16
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:14
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Road from NH14 connecting Duc Minh - Thuan An inter-commune road (Phase 1) project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 4 bidding package.
19/07/2022 16:10
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consulting survey, making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 16:00
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the request Renovating, upgrading and expanding Nguyen Trai Street in the project preparation phase of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL with 3 bidding package.
19/07/2022 15:55
The Bid solicitor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has posted the results of the bidding package Consultancy on making feasibility study report of the investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL.
19/07/2022 15:13
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the investor of 30 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the owner of 130 contractor selection plan. In which, they self-invite 129 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the investor of 44 package, of which 33 package is self-invited, other units invite bid 11 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is the owner of 415 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PROJECT MANAGEMENT CONSTRUCTION DAK MIL is an investor with 114 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.