Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Power Network Project Management Board as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 248 contractors.
- Announced 27 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 35 contractor selection plans with a total of 44 bidding packages, of which 33 prequalification documents have not found the investment project
- Has invited bids for 286 packages (with 293 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1307 packages, and canceled bids for 3 packages (among the packages mentioned above).
- There are 1028 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 27 packages that have not fully posted the contractor selection results. Of these 25 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.10 contractors.
- Breakdown by bidding field: Goods 26.28%, Construction 15.02%, Consultancy 35.84%, Non-consultancy 17.75%, Mixed 4.78%, Other fields 0.33%.
- The total value according to the packages with valid contractor selection results is: 11,182,776,746,895 VND, of which the total winning bid value is: 10,230,335,970,076 VND.
- The savings rate is: 8.52%.
Data analysis results of DauThau.info software for project owners Power Network Project Management Board as follows:
- Has relationships with 248 contractors.
- The average number of contractors participating in each bidding package is: 2.10 contractors.
- Proportion of bidding fields: Goods 26.28%, Construction 15.02%, Consulting 35.84%, Non-consulting 17.75%, Mixed 4.78%, Other 0.33%.
- The total value according to the bidding package with valid IMP is: 11,182,776,746,895 VND, in which the total winning value is: 10,230,335,970,076 VND.
- The savings rate is: 8.52%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 07: Supply, transport and install VTTB 110kV substation. of the investor Power Network Project Management Board.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters of the investor Power Network Project Management Board.
14/03/2023 14:59
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA of the investor Power Network Project Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supply, delivery and installation of 110kV and self-use transformers. of the investor Power Network Project Management Board.
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:47
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:38
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Construction of 110kV . transmission lines and substations of the investor Power Network Project Management Board.
09/02/2023 15:34
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 05: Supply and installation of 110kV . transformer of the investor Power Network Project Management Board.
01/02/2023 09:24
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package NPC-KFW3-110CT-W04: Construction of 110kV Cao Thang transmission line and substation of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH HBT Toàn Cầu
31/12/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
Power Network Project Management Board announced the results of the bid package Package 07: Supply, transport and install VTTB 110kV substation. .
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
Power Network Project Management Board announced the results of the bid package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THÍ NGHIỆM ĐIỆN MIỀN BẮC, CÔNG TY CỔ PHẦN CÔNG NGHỆ GCOM
14/03/2023 14:59
Power Network Project Management Board announced the results of the bid package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THÍ NGHIỆM ĐIỆN MIỀN BẮC, CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
Power Network Project Management Board announced the results of the bid package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects .
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
Power Network Project Management Board announced the results of the bid package Package 06: Supply, delivery and installation of 110kV and self-use transformers. .
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
Power Network Project Management Board announced the results of the bidding package Package 08: Construction of 110kV transmission line from the starting point to G16 with 2 participating contractors .
02/03/2023 09:29
Power Network Project Management Board announced the results of the bid package Package No. 07: Experiment to calibrate station VTTB .
- Winning bidder: Công ty TNHH MTV thí nghiệm điện miền Bắc
15/02/2023 09:47
Power Network Project Management Board announced the results of the bid package Package No. 07: Experiment to calibrate station VTTB .
- Winning bidder: Công ty TNHH MTV thí nghiệm điện miền Bắc
15/02/2023 09:38
Power Network Project Management Board announced the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects with 1 participating contractors .
13/02/2023 15:06
Power Network Project Management Board announced the results of the bid package Package 08: Construction of 110kV . transmission lines and substations .
- Winning bidder: Công ty TNHH HBT Toàn Cầu
09/02/2023 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 07: Supply, transport and install VTTB 110kV substation. of the investor Power Network Project Management Board.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
13/04/2023 13:37
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 10: Supplying computer control system software, VTTB calibration experiment, configuring and connecting SCADA signals throughout the substation, measuring line parameters of the investor Power Network Project Management Board.
14/03/2023 14:59
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Supply of computer control system software, VTTB calibration experiments, configuration and connection of SCADA signals throughout the TBA of the investor Power Network Project Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN CÔNG NGHỆ TNG VIỆT NAM
14/03/2023 14:53
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supplying VTTB and services for installation and operation for 110kV T2 TBA transformer installation projects of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH Nhất Nước
08/03/2023 09:23
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 06: Supply, delivery and installation of 110kV and self-use transformers. of the investor Power Network Project Management Board.
- Winning bidder: TỔNG CÔNG TY THIẾT BỊ ĐIỆN ĐÔNG ANH - CÔNG TY CỔ PHẦN
03/03/2023 15:00
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:47
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package No. 07: Experiment to calibrate station VTTB of the investor Power Network Project Management Board.
15/02/2023 09:38
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 08: Construction of 110kV . transmission lines and substations of the investor Power Network Project Management Board.
09/02/2023 15:34
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package Package 05: Supply and installation of 110kV . transformer of the investor Power Network Project Management Board.
01/02/2023 09:24
The Bid solicitor Power Network Project Management Board has posted the results of the bidding package NPC-KFW3-110CT-W04: Construction of 110kV Cao Thang transmission line and substation of the investor Power Network Project Management Board.
- Winning bidder: Công ty TNHH HBT Toàn Cầu
31/12/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is the investor of 27 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Power Network Project Management Board is the owner of 35 contractor selection plan. In which, they self-invite 33 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Power Network Project Management Board is the investor of 293 package, of which 205 package is self-invited, other units invite bid 88 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is the owner of 1307 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Power Network Project Management Board has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Network Project Management Board is an investor with 248 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.