Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Quang Ngai Power Company as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 345 contractors.
- Announced 46 development investment project, of which 3 projects that have not announced the contractor selection plan.
- Announced 473 contractor selection plans with a total of 1469 bidding packages, of which 293 prequalification documents have not found the investment project
- Has invited bids for 451 packages (with 492 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 425 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 57 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 969 packages that have not fully posted the contractor selection results. Of these 889 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.10 contractors.
- Breakdown by bidding field: Goods 64.84%, Construction 19.92%, Consultancy 7.72%, Non-consultancy 5.49%, Mixed 2.03%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 713,193,246,447 VND, of which the total winning bid value is: 614,481,845,061 VND.
- The savings rate is: 13.84%.
Data analysis results of DauThau.info software for project owners Quang Ngai Power Company as follows:
- Has relationships with 345 contractors.
- The average number of contractors participating in each bidding package is: 3.10 contractors.
- Proportion of bidding fields: Goods 64.84%, Construction 19.92%, Consulting 7.72%, Non-consulting 5.49%, Mixed 2.03%, Other 0%.
- The total value according to the bidding package with valid IMP is: 713,193,246,447 VND, in which the total winning value is: 614,481,845,061 VND.
- The savings rate is: 13.84%.
You need to Login or Sign up to view all informations.
- Participated in 113 bidding packages, of which 90 were won, 16 were lost, 4 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 51.4% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.46% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (35), TP.Hồ Chí Minh (17), Khánh Hòa (12), Hà Nội (2), Huế (2), Lâm Đồng (2), Gia Lai (2), Quảng Trị (1), Đắk Lắk (1), Undefined (39)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (34), TP.Hồ Chí Minh (16), Khánh Hòa (11), Hà Nội (2), Huế (2), Đắk Nông (2), Bình Định (2), Quảng Trị (1), Phú Yên (1), Quảng Nam (1), Undefined (41)
- Has relationships with 19 Bid Solicitors
- Has competed against 22 contractors in 34 bidding packages, won 12 packages, lost 15 packages, 4 are pending results, and 3 were canceled.
- Has collaborated with 9 contractors in 27 bidding packages, won 7 packages, lost 14 packages, 3 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 693 bidding packages with 33 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 of the investor Quang Ngai Power Company with 2 bidding package.
20/02/2025 08:27
The Bid solicitor Quang Ngai Power Company has posted the request Consulting auditing construction projects in 2025 of Quang Ngai Power Company of the investor Quang Ngai Power Company with 2 bidding package.
15/02/2025 09:43
The Bid solicitor Quang Ngai Power Company has posted the request Plan to select contractors for new 22kV transmission line communication between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 9 bidding package.
28/11/2024 15:15
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 2 bidding package.
22/11/2024 16:53
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 of the investor Quang Ngai Power Company with 2 bidding package.
19/11/2024 11:04
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 2 bidding package.
16/11/2024 15:35
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Quang Ngai city area in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 17:26
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Package No. 01/XL: Supply of materials (except level A materials) and construction and installation of works under the projects: Completing and preventing overloading of the power grid in Ly Son district in 2019 2025; Complete and prevent overloading of the power grid in Tra Bong district by 2025 of the investor Quang Ngai Power Company with 1 bidding package.
27/10/2024 16:51
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Ly Son district in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 16:48
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Tra Bong district in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
Quang Ngai Power Company publishes the plan Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 with 2 bidding package .
20/02/2025 08:27
Quang Ngai Power Company publishes the plan Consulting auditing construction projects in 2025 of Quang Ngai Power Company with 2 bidding package .
15/02/2025 09:43
Quang Ngai Power Company publishes the plan Plan to select contractors for new 22kV transmission line communication between XT 476/VSI and XT 479/VSI in 2024 with 9 bidding package .
28/11/2024 15:15
Quang Ngai Power Company publishes the plan Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 with 2 bidding package .
22/11/2024 16:53
Quang Ngai Power Company publishes the plan Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 with 2 bidding package .
19/11/2024 11:04
Quang Ngai Power Company publishes the plan Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 with 2 bidding package .
16/11/2024 15:35
Quang Ngai Power Company publishes the plan Contractor selection plan Project: Completing and preventing overloading of the power grid in Quang Ngai city area in 2025 with 4 bidding package .
27/10/2024 17:26
Quang Ngai Power Company publishes the plan Contractor selection plan Package No. 01/XL: Supply of materials (except level A materials) and construction and installation of works under the projects: Completing and preventing overloading of the power grid in Ly Son district in 2019 2025; Complete and prevent overloading of the power grid in Tra Bong district by 2025 with 1 bidding package .
27/10/2024 16:51
Quang Ngai Power Company publishes the plan Contractor selection plan Project: Completing and preventing overloading of the power grid in Ly Son district in 2025 with 4 bidding package .
27/10/2024 16:48
Quang Ngai Power Company publishes the plan Contractor selection plan Project: Completing and preventing overloading of the power grid in Tra Bong district in 2025 with 4 bidding package .
27/10/2024 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 of the investor Quang Ngai Power Company with 2 bidding package.
20/02/2025 08:27
The Bid solicitor Quang Ngai Power Company has posted the request Consulting auditing construction projects in 2025 of Quang Ngai Power Company of the investor Quang Ngai Power Company with 2 bidding package.
15/02/2025 09:43
The Bid solicitor Quang Ngai Power Company has posted the request Plan to select contractors for new 22kV transmission line communication between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 9 bidding package.
28/11/2024 15:15
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 2 bidding package.
22/11/2024 16:53
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025 of the investor Quang Ngai Power Company with 2 bidding package.
19/11/2024 11:04
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan for project preparation phase Project: New construction of 22kV transmission line between XT 476/VSI and XT 479/VSI in 2024 of the investor Quang Ngai Power Company with 2 bidding package.
16/11/2024 15:35
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Quang Ngai city area in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 17:26
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Package No. 01/XL: Supply of materials (except level A materials) and construction and installation of works under the projects: Completing and preventing overloading of the power grid in Ly Son district in 2019 2025; Complete and prevent overloading of the power grid in Tra Bong district by 2025 of the investor Quang Ngai Power Company with 1 bidding package.
27/10/2024 16:51
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Ly Son district in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 16:48
The Bid solicitor Quang Ngai Power Company has posted the request Contractor selection plan Project: Completing and preventing overloading of the power grid in Tra Bong district in 2025 of the investor Quang Ngai Power Company with 4 bidding package.
27/10/2024 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Ngai Power Company is the investor of 46 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Quang Ngai Power Company is the owner of 473 contractor selection plan. In which, they self-invite 470 of contractor selection plan, other units invite bids of 3 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Quang Ngai Power Company is the investor of 492 package, of which 484 package is self-invited, other units invite bid 8 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Ngai Power Company is the owner of 425 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Quang Ngai Power Company has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Ngai Power Company is an investor with 345 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.