Data analysis results of DauThau.info software for project owners SONG BA HA HYDRO POWER JOINT STOCK COMPANY as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 431 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 129 contractor selection plans with a total of 358 bidding packages, of which 123 prequalification documents have not found the investment project
- Has invited bids for 345 packages (with 366 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 348 packages, and canceled bids for 1 packages (among the packages mentioned above).
- There are 41 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 50 packages that have not fully posted the contractor selection results. Of these 33 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.55 contractors.
- Breakdown by bidding field: Goods 52.46%, Construction 18.31%, Consultancy 13.39%, Non-consultancy 15.85%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 759,622,837,457 VND, of which the total winning bid value is: 669,591,309,608 VND.
- The savings rate is: 11.85%.
Data analysis results of DauThau.info software for project owners SONG BA HA HYDRO POWER JOINT STOCK COMPANY as follows:
- Has relationships with 431 contractors.
- The average number of contractors participating in each bidding package is: 3.55 contractors.
- Proportion of bidding fields: Goods 52.46%, Construction 18.31%, Consulting 13.39%, Non-consulting 15.85%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 759,622,837,457 VND, in which the total winning value is: 669,591,309,608 VND.
- The savings rate is: 11.85%.
- Name of construction organization: Công ty cổ phần Thủy điện Sông Ba Hạ
- Code of capacity certificate of construction activities: 00039503
- Issuer: Sở Kế hoạch và Đầu tư tỉnh Phú Yên
- Fields:
⚬ Quản lý dự án đầu tư xây dựng: Quản lý dự án Quản lý dự án công trình Thủy điện
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Procurement of mechanical equipment, electricity of H1 and installation, experiment, adjustment to set the controller to serve SCL in 2026 - Song Ba Ha Hydroelectric Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: S5T VIET NAM SOLUTION AND TECHNOLOGY JOINT STOCK COMPANY
31/12/2025 15:49
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Bidding package No. 49: Providing personal protective equipment and safety equipment for workers in 2025 of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH BẢO HỘ HSE TÍN TOÀN
31/12/2025 07:52
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02: Procurement of Materials and Materials H1 to serve SCL in 2026 - Song Ba Ha Hydroelectric Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: THIEN MINH BACH COMPANY LIMITED
29/12/2025 10:37
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 17: maintenance and repair of the right and left wing walls - the river hydroelectric plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
29/12/2025 09:05
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 53: Equipping the 2026 Binh Ngo spring calendar for staff and serving the diplomatic work of Song Ba Ha Hydropower Joint Stock Company of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: GALAXY TRADING ADVERTISING COMPANY LIMITED
25/12/2025 15:19
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 03: Procurement, installation and replacement system to regulate the H1 machine of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: S5T VIET NAM SOLUTION AND TECHNOLOGY JOINT STOCK COMPANY
25/12/2025 15:17
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 52: Procurement, installation and replacement of remote warning system equipment in 2025 - Song Ba Ha Hydropower Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: T&H TECHNOLOGY JOINT STOCK COMPANY
23/12/2025 11:21
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 54: Providing industrial cleaning services and other ancillary services for Song Ba Ha Hydropower Joint Stock Company of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
19/12/2025 16:11
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 51: Providing security services for Song Ba Ha Hydropower Joint Stock Company in 2026 of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
17/12/2025 10:43
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 52: Procurement, installation and replacement of remote warning system equipment in 2025 - Song Ba Ha Hydropower Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Competitive Offer.
08/12/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package No. 9: Reinforcing landslides on the right wing area of the dam and reinforcing the erosion of the drainage channel on the upstream of the canal item - Ba Ha Hydropower Plant .
- Winning bidder: CÔNG TY TNHH LỄ HÂN, CÔNG TY TNHH 522
24/10/2025 07:53
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package 7: Monitor surface water quality and ecosystem in 2024 - Ba Ha Song Ha Hydroelectric Plant .
- Winning bidder: Trung tâm Quan trắc Tài nguyên và Môi trường
01/10/2025 09:09
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package No. 24: Design consultancy on fire prevention and fighting system of housing and supplies at Song Ba Ha Hydroelectric Plant operation area .
- Winning bidder: PCCC HONG HA COMPANY LIMITED
01/10/2025 08:54
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package 12: Consulting to check the acceptance work completed the construction of the headquarters of Song Ba Ha Hydroelectric Joint Stock Company .
- Winning bidder: Trung tâm Giám định, kiểm định chất lượng xây dựng
01/10/2025 08:27
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package 47: Insurance fire and explosion compulsory Ba Ha Song Ha Hydroelectric Plant in 2024 .
- Winning bidder: BAO MINH INSURANCE CORPORATION
30/09/2025 16:31
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package No. 27: Maintenance and repair of drainage systems and dams of dams in 2025 - Song Ba Ha hydroelectric plant .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NAM KIẾN THÀNH
31/07/2025 15:45
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package 8: Repair tunnel tunnel H2 .
- Winning bidder: PHU GIA TRADING AND CONSTRUCTION JOINT STOCK COMPANY
28/07/2025 15:45
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bid package Package No. 26: Maintaining and repairing the system of flooding flood warning floods and spillway systems and a system of floats remote trash from the head of the water canal in 2025 - Ba Ha Hydroelectric Plant .
- Winning bidder: NHU DUONG CORPORATION
22/07/2025 14:28
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bidding package Tender package No 26: Maintaining and repairing the system of flooding flood warning floods and spillway systems and a system of floats remote trash from the head of the water canal in 2025 - Ba Ha Hydroelectric Plant with 2 participating contractors .
07/07/2025 16:38
SONG BA HA HYDRO POWER JOINT STOCK COMPANY announced the results of the bidding package Tender package No 27: Maintenance and repair of drainage systems and dams of dams in 2025 - Song Ba Ha hydroelectric plant with 3 participating contractors .
07/07/2025 10:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Procurement of mechanical equipment, electricity of H1 and installation, experiment, adjustment to set the controller to serve SCL in 2026 - Song Ba Ha Hydroelectric Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: S5T VIET NAM SOLUTION AND TECHNOLOGY JOINT STOCK COMPANY
31/12/2025 15:49
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Bidding package No. 49: Providing personal protective equipment and safety equipment for workers in 2025 of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH BẢO HỘ HSE TÍN TOÀN
31/12/2025 07:52
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02: Procurement of Materials and Materials H1 to serve SCL in 2026 - Song Ba Ha Hydroelectric Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: THIEN MINH BACH COMPANY LIMITED
29/12/2025 10:37
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 17: maintenance and repair of the right and left wing walls - the river hydroelectric plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
29/12/2025 09:05
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 53: Equipping the 2026 Binh Ngo spring calendar for staff and serving the diplomatic work of Song Ba Ha Hydropower Joint Stock Company of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: GALAXY TRADING ADVERTISING COMPANY LIMITED
25/12/2025 15:19
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 03: Procurement, installation and replacement system to regulate the H1 machine of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: S5T VIET NAM SOLUTION AND TECHNOLOGY JOINT STOCK COMPANY
25/12/2025 15:17
The Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 52: Procurement, installation and replacement of remote warning system equipment in 2025 - Song Ba Ha Hydropower Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY.
- Winning bidder: T&H TECHNOLOGY JOINT STOCK COMPANY
23/12/2025 11:21
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 54: Providing industrial cleaning services and other ancillary services for Song Ba Ha Hydropower Joint Stock Company of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
19/12/2025 16:11
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 51: Providing security services for Song Ba Ha Hydropower Joint Stock Company in 2026 of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Open bidding.
17/12/2025 10:43
Bid solicitor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has posted Tender Notice Tender package No 52: Procurement, installation and replacement of remote warning system equipment in 2025 - Song Ba Ha Hydropower Plant of the investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY with the form Competitive Offer.
08/12/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY is the owner of 129 contractor selection plan. In which, they self-invite 124 of contractor selection plan, other units invite bids of 5 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY is the investor of 366 package, of which 332 package is self-invited, other units invite bid 34 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY is the owner of 348 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor SONG BA HA HYDRO POWER JOINT STOCK COMPANY is an investor with 431 contractor. The data sheet has been partially hidden, to see the full information please Login or Register