Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Vietnam Maritime Administration as follows:
- Has relationships with 10 bid solicitors.
- Has relationships with 53 contractors.
- Announced 11 development investment project, of which 3 projects that have not announced the contractor selection plan.
- Announced 242 contractor selection plans with a total of 588 bidding packages, of which 220 prequalification documents have not found the investment project
- Has invited bids for 72 packages (with 79 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 155 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 93 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 405 packages that have not fully posted the contractor selection results. Of these 402 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.73 contractors.
- Breakdown by bidding field: Goods 1.27%, Construction 6.33%, Consultancy 91.14%, Non-consultancy 1.27%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 239,861,785,349 VND, of which the total winning bid value is: 227,340,568,817 VND.
- The savings rate is: 5.22%.
Data analysis results of DauThau.info software for project owners Vietnam Maritime Administration as follows:
- Has relationships with 53 contractors.
- The average number of contractors participating in each bidding package is: 1.73 contractors.
- Proportion of bidding fields: Goods 1.27%, Construction 6.33%, Consulting 91.14%, Non-consulting 1.27%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 239,861,785,349 VND, in which the total winning value is: 227,340,568,817 VND.
- The savings rate is: 5.22%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 4: Survey for BGMB of the investor Vietnam Maritime Administration.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI
05/10/2022 14:33
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping of the investor Vietnam Maritime Administration.
- Winning bidder: VIỆN KỸ THUẬT CÔNG TRÌNH
05/10/2022 14:31
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 11 AIS information management and exploitation services for the management of construction vehicles, dredging and maintenance of Rach Gia navigation channel 2022 of the investor Vietnam Maritime Administration.
- Winning bidder: Công ty TNHH MTV Thông tin Điện tử Hàng hải Việt Nam
04/10/2022 16:30
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 5: Preparation of detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 5 seaports). of the investor Vietnam Maritime Administration.
04/10/2022 11:35
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 4: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 4 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:34
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 3: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 3 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:32
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 2: Prepare detailed planning for development of land and seaport waters in the 2021-2030 period, with a vision to 2050 (group 2 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:30
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 1: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 1 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Công ty Cổ phần tư vấn xây dựng Cảng Đường thuỷ
04/10/2022 11:28
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 04: Project Management Consulting of the investor Vietnam Maritime Administration.
- Winning bidder: TỔNG CÔNG TY BẢO ĐẢM AN TOÀN HÀNG HẢI MIỀN NAM
15/09/2022 17:19
The Bid solicitor Vietnam Maritime Administration has posted the request Plan to select contractors for several bidding packages Investment project to establish new generation Cospas - Sarsat satellite station MEOLUT of the investor Vietnam Maritime Administration with 6 bidding package.
15/09/2022 17:04
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Maritime Administration announced the results of the bid package Package 4: Survey for BGMB .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI
05/10/2022 14:33
Vietnam Maritime Administration announced the results of the bid package Package No. 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping .
- Winning bidder: VIỆN KỸ THUẬT CÔNG TRÌNH
05/10/2022 14:31
Vietnam Maritime Administration announced the results of the bid package Package 11 AIS information management and exploitation services for the management of construction vehicles, dredging and maintenance of Rach Gia navigation channel 2022 .
- Winning bidder: Công ty TNHH MTV Thông tin Điện tử Hàng hải Việt Nam
04/10/2022 16:30
Vietnam Maritime Administration announced the results of the bid package Package 5: Preparation of detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 5 seaports). .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI , Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:35
Vietnam Maritime Administration announced the results of the bid package Package 4: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 4 seaports). .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI , Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:34
Vietnam Maritime Administration announced the results of the bid package Package 3: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 3 seaports). .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ CẢNG-KỸ THUẬT BIỂN, Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:32
Vietnam Maritime Administration announced the results of the bid package Package No. 2: Prepare detailed planning for development of land and seaport waters in the 2021-2030 period, with a vision to 2050 (group 2 seaports). .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ CẢNG-KỸ THUẬT BIỂN, Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:30
Vietnam Maritime Administration announced the results of the bid package Package No. 1: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 1 seaports). .
- Winning bidder: Công ty Cổ phần tư vấn xây dựng Cảng Đường thuỷ
04/10/2022 11:28
Vietnam Maritime Administration announced the results of the bidding package Tender package No 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping with 1 participating contractors .
03/10/2022 14:10
Vietnam Maritime Administration announced the results of the bidding package Package 4: Survey for BGMB with 1 participating contractors .
03/10/2022 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 4: Survey for BGMB of the investor Vietnam Maritime Administration.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI
05/10/2022 14:33
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping of the investor Vietnam Maritime Administration.
- Winning bidder: VIỆN KỸ THUẬT CÔNG TRÌNH
05/10/2022 14:31
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 11 AIS information management and exploitation services for the management of construction vehicles, dredging and maintenance of Rach Gia navigation channel 2022 of the investor Vietnam Maritime Administration.
- Winning bidder: Công ty TNHH MTV Thông tin Điện tử Hàng hải Việt Nam
04/10/2022 16:30
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 5: Preparation of detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 5 seaports). of the investor Vietnam Maritime Administration.
04/10/2022 11:35
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 4: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 4 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:34
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 3: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 3 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:32
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 2: Prepare detailed planning for development of land and seaport waters in the 2021-2030 period, with a vision to 2050 (group 2 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Trung tâm Tư vấn đầu tư phát triển giao thông vận tải
04/10/2022 11:30
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package No. 1: Prepare detailed planning for development of land and seaport waters in the period of 2021-2030, with a vision to 2050 (group 1 seaports). of the investor Vietnam Maritime Administration.
- Winning bidder: Công ty Cổ phần tư vấn xây dựng Cảng Đường thuỷ
04/10/2022 11:28
The Bid solicitor Vietnam Maritime Administration has posted the results of the bidding package Package 04: Project Management Consulting of the investor Vietnam Maritime Administration.
- Winning bidder: TỔNG CÔNG TY BẢO ĐẢM AN TOÀN HÀNG HẢI MIỀN NAM
15/09/2022 17:19
The Bid solicitor Vietnam Maritime Administration has posted the request Plan to select contractors for several bidding packages Investment project to establish new generation Cospas - Sarsat satellite station MEOLUT of the investor Vietnam Maritime Administration with 6 bidding package.
15/09/2022 17:04
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is the investor of 11 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Vietnam Maritime Administration is the owner of 242 contractor selection plan. In which, they self-invite 168 of contractor selection plan, other units invite bids of 74 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Vietnam Maritime Administration is the investor of 79 package, of which 70 package is self-invited, other units invite bid 9 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is the owner of 155 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Vietnam Maritime Administration has a relationship with 10 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Maritime Administration is an investor with 53 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.