Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng khu vực 2 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 151 contractors.
- Announced 75 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 2 contractor selection plans with a total of 6 bidding packages, of which 0 prequalification documents have not found the investment project
- Has invited bids for 33 packages (with 35 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 155 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 123 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 91.43%, Consultancy 8.57%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 442,289,656,000 VND, of which the total winning bid value is: 411,510,441,000 VND.
- The savings rate is: 6.96%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng khu vực 2 as follows:
- Has relationships with 151 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 91.43%, Consulting 8.57%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 442,289,656,000 VND, in which the total winning value is: 411,510,441,000 VND.
- The savings rate is: 6.96%.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Tháp (3)
- Provinces before the merger where the contractor has participated in bidding : Đồng Tháp (2), Undefined (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 8 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Consulting service bidding package No. 01 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: LAM NGUYEN DONG THAP CONSULTANCY CONSTRUCTION LIMITED COMPANY
31/12/2025 09:36
Ban Quản lý dự án đầu tư xây dựng khu vực 2 Posted Development Investment Project Long Hung A Kindergarten; Category: Building 13 classrooms, 16 function rooms and sub -items.
30/12/2025 17:17
Ban Quản lý dự án đầu tư xây dựng khu vực 2 Posted Development Investment Project Long Hung A Kindergarten; Category: Building 13 classrooms, 16 function rooms and sub -items.
30/12/2025 17:17
Ban Quản lý dự án đầu tư xây dựng khu vực 2 Posted Development Investment Project Lap Vo District Cultural and Sports Complex; Category: Compensation, land leveling.
30/12/2025 16:16
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Package 12: Independent audit consultancy of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN - TƯ VẤN ĐẤT VIỆT
30/12/2025 10:13
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Package 02: Construction of mines and mines and explosives of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: THAI SON GROUP COMPANY LIMITED
30/12/2025 10:04
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Bidding package for consulting and supervision services of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG TỔNG HỢP
29/12/2025 09:32
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Package No. 18: Existing revetment roof tiling item of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC TRÂM
27/12/2025 13:35
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Consulting service bidding package No. 01 of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: LAM NGUYEN DONG THAP CONSULTANCY CONSTRUCTION LIMITED COMPANY
27/12/2025 10:15
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has posted the results of the bidding package Package No. 3: Foundation, road surface and sewer system of the investor Ban Quản lý dự án đầu tư xây dựng khu vực 2.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG MÔI TRƯỜNG LONG GIANG
27/12/2025 10:12
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 is the investor of 75 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 is the owner of 2 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 is the investor of 35 package, of which 0 package is self-invited, other units invite bid 35 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 is the owner of 155 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực 2 is an investor with 151 contractor. The data sheet has been partially hidden, to see the full information please Login or Register