Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng quận Long Biên as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 192 contractors.
- Announced 111 development investment project, of which 10 projects that have not announced the contractor selection plan.
- Announced 303 contractor selection plans with a total of 1810 bidding packages, of which 64 prequalification documents have not found the investment project
- Has invited bids for 452 packages (with 530 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 614 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 181 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1264 packages that have not fully posted the contractor selection results. Of these 1255 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 12.64%, Construction 55.09%, Consultancy 31.32%, Non-consultancy 0%, Mixed 0.94%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,879,446,224,544 VND, of which the total winning bid value is: 4,784,292,472,182 VND.
- The savings rate is: 1.95%.
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng quận Long Biên as follows:
- Has relationships with 192 contractors.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 12.64%, Construction 55.09%, Consulting 31.32%, Non-consulting 0%, Mixed 0.94%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,879,446,224,544 VND, in which the total winning value is: 4,784,292,472,182 VND.
- The savings rate is: 1.95%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Building the hallway of the dyke after the land of the Block, Cu Block, Long Bien District, Hanoi of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 8 bidding package.
07/06/2025 10:39
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Supplementing the project contractor selection plan: Building the dike corridor, embellishing the dike dike on the right of the Duong dike line, the section from Duong Bridge to Hoi Xa communal house, Duc Giang and Giang Bien ward (2nd time) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 3 bidding package.
29/05/2025 20:20
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Project: Planning the total ground 1/500 at a part of the land plot symbol A.4/HH4, Ngoc Thuy Ward, Long Bien District of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 2 bidding package.
22/05/2025 20:32
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Project: Renovating and embellishing historical relics of communal house, Thuong Hoi temple, Thach Ban ward, Long Bien district (the preparation stage) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
06/05/2025 20:29
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Upgrading and renovating Ly Thuong Kiet High School, Thuong Thanh Ward, Long Bien District of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 12 bidding package.
23/04/2025 18:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Supplementing the project contractor selection plan: Building a planning route 13.5m along the ditch from 40m to the dike corridor, Thuong Thanh ward, Long Bien district (2nd time). of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
17/04/2025 20:25
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Building an elementary school in the planning box C.2/TH, Duc Giang Ward, Long Bien District (implementation phase) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 5 bidding package.
14/03/2025 09:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Build a monument to Ly Thuong Kiet at Bac Bien flower garden, Ngoc Thuy ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
16/01/2025 17:45
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Renovating and upgrading junior high school in Viet Hung urban area, Giang Bien ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 9 bidding package.
11/01/2025 16:26
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Construction of a 17.5m road according to planning from Co Linh street to Tu Dinh street, Long Bien ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 3 bidding package.
03/01/2025 17:43
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Building the hallway of the dyke after the land of the Block, Cu Block, Long Bien District, Hanoi with 8 bidding package .
07/06/2025 10:39
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Supplementing the project contractor selection plan: Building the dike corridor, embellishing the dike dike on the right of the Duong dike line, the section from Duong Bridge to Hoi Xa communal house, Duc Giang and Giang Bien ward (2nd time) with 3 bidding package .
29/05/2025 20:20
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Project: Planning the total ground 1/500 at a part of the land plot symbol A.4/HH4, Ngoc Thuy Ward, Long Bien District with 2 bidding package .
22/05/2025 20:32
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Project: Renovating and embellishing historical relics of communal house, Thuong Hoi temple, Thach Ban ward, Long Bien district (the preparation stage) with 4 bidding package .
06/05/2025 20:29
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Upgrading and renovating Ly Thuong Kiet High School, Thuong Thanh Ward, Long Bien District with 12 bidding package .
23/04/2025 18:14
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Supplementing the project contractor selection plan: Building a planning route 13.5m along the ditch from 40m to the dike corridor, Thuong Thanh ward, Long Bien district (2nd time). with 4 bidding package .
17/04/2025 20:25
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Building an elementary school in the planning box C.2/TH, Duc Giang Ward, Long Bien District (implementation phase) with 5 bidding package .
14/03/2025 09:34
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Build a monument to Ly Thuong Kiet at Bac Bien flower garden, Ngoc Thuy ward, Long Bien district with 4 bidding package .
16/01/2025 17:45
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Renovating and upgrading junior high school in Viet Hung urban area, Giang Bien ward, Long Bien district with 9 bidding package .
11/01/2025 16:26
Ban quản lý dự án đầu tư xây dựng quận Long Biên publishes the plan Construction of a 17.5m road according to planning from Co Linh street to Tu Dinh street, Long Bien ward, Long Bien district with 3 bidding package .
03/01/2025 17:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Building the hallway of the dyke after the land of the Block, Cu Block, Long Bien District, Hanoi of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 8 bidding package.
07/06/2025 10:39
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Supplementing the project contractor selection plan: Building the dike corridor, embellishing the dike dike on the right of the Duong dike line, the section from Duong Bridge to Hoi Xa communal house, Duc Giang and Giang Bien ward (2nd time) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 3 bidding package.
29/05/2025 20:20
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Project: Planning the total ground 1/500 at a part of the land plot symbol A.4/HH4, Ngoc Thuy Ward, Long Bien District of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 2 bidding package.
22/05/2025 20:32
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Project: Renovating and embellishing historical relics of communal house, Thuong Hoi temple, Thach Ban ward, Long Bien district (the preparation stage) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
06/05/2025 20:29
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Upgrading and renovating Ly Thuong Kiet High School, Thuong Thanh Ward, Long Bien District of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 12 bidding package.
23/04/2025 18:14
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Supplementing the project contractor selection plan: Building a planning route 13.5m along the ditch from 40m to the dike corridor, Thuong Thanh ward, Long Bien district (2nd time). of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
17/04/2025 20:25
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Building an elementary school in the planning box C.2/TH, Duc Giang Ward, Long Bien District (implementation phase) of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 5 bidding package.
14/03/2025 09:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Build a monument to Ly Thuong Kiet at Bac Bien flower garden, Ngoc Thuy ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 4 bidding package.
16/01/2025 17:45
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Renovating and upgrading junior high school in Viet Hung urban area, Giang Bien ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 9 bidding package.
11/01/2025 16:26
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the request Construction of a 17.5m road according to planning from Co Linh street to Tu Dinh street, Long Bien ward, Long Bien district of the investor Ban quản lý dự án đầu tư xây dựng quận Long Biên with 3 bidding package.
03/01/2025 17:43
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng quận Long Biên is the investor of 111 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng quận Long Biên is the owner of 303 contractor selection plan. In which, they self-invite 302 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng quận Long Biên is the investor of 530 package, of which 499 package is self-invited, other units invite bid 31 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng quận Long Biên is the owner of 614 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban quản lý dự án đầu tư xây dựng quận Long Biên has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng quận Long Biên is an investor with 192 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.