Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng xã Đông Hưng as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 80 contractors.
- Announced 32 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 82 contractor selection plans with a total of 176 bidding packages, of which 12 prequalification documents have not found the investment project
- Has invited bids for 36 packages (with 40 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 199 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 164 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.10 contractors.
- Breakdown by bidding field: Goods 0%, Construction 57.14%, Consultancy 42.86%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 645,723,101,155 VND, of which the total winning bid value is: 637,369,338,237 VND.
- The savings rate is: 1.29%.
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng xã Đông Hưng as follows:
- Has relationships with 80 contractors.
- The average number of contractors participating in each bidding package is: 2.10 contractors.
- Proportion of bidding fields: Goods 0%, Construction 57.14%, Consulting 42.86%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 645,723,101,155 VND, in which the total winning value is: 637,369,338,237 VND.
- The savings rate is: 1.29%.
You need to Login or Sign up to view all informations.
- Participated in 2 bidding packages, of which 2 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hưng Yên (2)
- Provinces before the merger where the contractor has participated in bidding : Undefined (2)
- Has relationships with 0 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 8 bidding packages with 5 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Bidding package 03: Consulting on preparing Bidding Documents and evaluating Bidding Documents for bidding package No. 04 of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI MINH TRÍ
07/01/2026 10:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request Plan for selecting contractors for project construction packages: Upgrading and expanding DH.45 road from the old Nguyen bridge to Ri bridge in Dong Hung commune of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 4 bidding package.
07/01/2026 10:52
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng Posted Development Investment Project Upgrading and expanding DH.45 road from old Nguyen bridge to Ri bridge in Dong Hung commune.
07/01/2026 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 02: Consulting, Supervising construction of electric lines and acceptance of energizing of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: NORTHERN POWER CORPORATION
29/12/2025 13:35
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 01: Construction of electric lines and electrical equipment costs of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THÀNH VINH
29/12/2025 13:32
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request Contractor selection plan for power line relocation packages to serve land clearance project: Thong Nhat riverside road, section from K40 bridge footfall road to District Military Command of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 2 bidding package.
29/12/2025 13:26
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng Posted Development Investment Project Thong Nhat riverside road, section from K40 bridge footbridge road to the District Military Command.
29/12/2025 13:13
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 01: Survey consultancy, technical economic report of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: HD THAI BINH TRADING AND CONSTRUCTION JOINT STOCK COMPANY
15/12/2025 11:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request contractor selection plan for bidding packages, steps to prepare project feasibility report: Upgrading the road surface and renewing the drainage ditch of the trunk road of Phan Thanh village from the village gate to the village hall of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 1 bidding package.
15/12/2025 11:05
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 02: Consulting on design verification and estimates of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ KIẾN TRÚC Á ÂU
08/12/2025 17:50
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bidding package Bidding package 07: Supervision consultant package 06 with 2 participating contractors .
07/07/2025 09:06
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bid package Package No. 06: Construction of works and installation of fire prevention and fighting equipment .
- Winning bidder: CÔNG TY TNHH DUY TƯỞNG, PCCC VIET NAM TECHNOLOGY DEVELOPMENT JOINT STOCK COMPANY
28/06/2025 15:00
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng publishes Tender Notice Bidding package 07: Supervision consultant package 06 in the form Open bidding .
25/06/2025 16:55
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bid package Package 16: Plug in the site clearance .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI QUỐC HƯNG
25/06/2025 14:21
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng publishes the plan The plan to select contractor package for site clearance of the road construction project connected from QL.39 to Uncle Ho and Thai Bao Tomb with 1 bidding package .
25/06/2025 10:42
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bidding package Tender package No 06: Construction of works and installation of fire prevention and fighting equipment with 1 participating contractors .
23/06/2025 09:08
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bid package Bidding package 09: ground clearance .
- Winning bidder: CÔNG TY TNHH ĐO ĐẠC VIỆT
17/06/2025 17:18
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng publishes the plan The plan to select the contractor package of landmarks plugged in the project: Investment in the construction of the route connecting the road of Thai Binh - Cau thousand road (Km17+358) to Tien Hung canal (sluice K40), Ha Giang commune, Dong Hung district with 1 bidding package .
17/06/2025 17:12
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng publishes Tender Notice Bidding package 07: Supervision consultant package 06 in the form Open bidding .
17/06/2025 09:43
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng announced the results of the bid package Package 11: Supervision consultancy on construction package 08 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI MINH TRÍ
16/06/2025 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Bidding package 03: Consulting on preparing Bidding Documents and evaluating Bidding Documents for bidding package No. 04 of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI MINH TRÍ
07/01/2026 10:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request Plan for selecting contractors for project construction packages: Upgrading and expanding DH.45 road from the old Nguyen bridge to Ri bridge in Dong Hung commune of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 4 bidding package.
07/01/2026 10:52
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng Posted Development Investment Project Upgrading and expanding DH.45 road from old Nguyen bridge to Ri bridge in Dong Hung commune.
07/01/2026 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 02: Consulting, Supervising construction of electric lines and acceptance of energizing of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: NORTHERN POWER CORPORATION
29/12/2025 13:35
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 01: Construction of electric lines and electrical equipment costs of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN THÀNH VINH
29/12/2025 13:32
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request Contractor selection plan for power line relocation packages to serve land clearance project: Thong Nhat riverside road, section from K40 bridge footfall road to District Military Command of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 2 bidding package.
29/12/2025 13:26
Ban quản lý dự án đầu tư xây dựng xã Đông Hưng Posted Development Investment Project Thong Nhat riverside road, section from K40 bridge footbridge road to the District Military Command.
29/12/2025 13:13
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 01: Survey consultancy, technical economic report of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: HD THAI BINH TRADING AND CONSTRUCTION JOINT STOCK COMPANY
15/12/2025 11:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the request contractor selection plan for bidding packages, steps to prepare project feasibility report: Upgrading the road surface and renewing the drainage ditch of the trunk road of Phan Thanh village from the village gate to the village hall of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng with 1 bidding package.
15/12/2025 11:05
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has posted the results of the bidding package Package 02: Consulting on design verification and estimates of the investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ KIẾN TRÚC Á ÂU
08/12/2025 17:50
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng is the investor of 32 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng is the owner of 82 contractor selection plan. In which, they self-invite 62 of contractor selection plan, other units invite bids of 20 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng is the investor of 40 package, of which 33 package is self-invited, other units invite bid 7 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng is the owner of 199 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Đông Hưng is an investor with 80 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.