Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án Đường Hồ Chí Minh as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 168 contractors.
- Announced 12 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 67 contractor selection plans with a total of 138 bidding packages, of which 16 prequalification documents have not found the investment project
- Has invited bids for 116 packages (with 139 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 146 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 57 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.70 contractors.
- Breakdown by bidding field: Goods 2.16%, Construction 25.18%, Consultancy 56.83%, Non-consultancy 15.83%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 21,976,054,787,000 VND, of which the total winning bid value is: 19,565,489,247,455 VND.
- The savings rate is: 10.97%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án Đường Hồ Chí Minh as follows:
- Has relationships with 168 contractors.
- The average number of contractors participating in each bidding package is: 2.70 contractors.
- Proportion of bidding fields: Goods 2.16%, Construction 25.18%, Consulting 56.83%, Non-consulting 15.83%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 21,976,054,787,000 VND, in which the total winning value is: 19,565,489,247,455 VND.
- The savings rate is: 10.97%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Bidding package TV14: Consulting on preparing documents to change forest use purposes to other purposes of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: MINH TOAN AGRIFOR COMPANY
30/12/2025 17:50
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TB1: Supply and install equipment for traffic monitoring and administration systems of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: HITD - HIGH DIGITAL TECHNOLOGY JOINT STOCK COMPANY
26/12/2025 11:17
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the request Supplementing the contractor selection plan, North - South Expressway expansion project east of La Son - Hoa Lien section of the investor Ban Quản lý dự án Đường Hồ Chí Minh with 1 bidding package.
24/12/2025 13:53
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV11: Construction supervision consultancy for section Km37+300 - Km102+200. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: THANG LONG ENGINEERING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
17/12/2025 17:37
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package XL2: Construction of section Km37+300 – Km102+200 (including survey and design of BVTC) of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
17/12/2025 11:00
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package XL1: Construction of section Km0+000 – Km37+300 (including survey and design of BVTC) of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: HUGIA DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
17/12/2025 10:59
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV10: Construction supervision consultancy for section Km0+000 - Km37+300. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
15/12/2025 17:59
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Bidding package RP1: Construction of bombs, mines and explosive objects of Cam Lo - La Son. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
09/12/2025 17:53
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV15: Completed audit audit consultancy of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: AAC AUDITING AND ACCOUNTING COMPANY LIMITED
03/12/2025 17:11
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package MS1: Supply and installation of 05 air conditioning units of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: Công ty TNHH Thương mại Điện máy Hà Nội
03/12/2025 16:18
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package TV8: Surveying, preparing construction techniques and estimates of clearing bombs, mines, explosive objects Cam Lo - La Son .
- Winning bidder: THANH AN ONE MEMBER LIMITED LIABILITY CORPORATION
08/09/2025 09:43
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package TV7: Consulting on technical design verification, verification of Cam Lo - La Son segment estimates .
- Winning bidder: T&D VIET NAM CIVIL ENGINEERING CONSULTANT JOINT STOCK COMPANY, CONSULTANCY COMPANY LIMITED OF UNIVERSITY OF CIVIL ENGINEERING, CÔNG TY TNHH THẮNG LỢI
22/08/2025 09:29
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package TV6: Advice on supervising the survey of technical design steps Cam Lo - La Son. .
- Winning bidder: HONG HA ENGINEERING CONSULTANT & CONSTRUCTION JOINT STOCK COMPANY
07/08/2025 18:11
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package TV5 Package: Survey consultancy, technical design, estimation of Cam Lo - La Son. .
- Winning bidder: TRUONG SON ADVISORY JOINT STOCK COMPANY, 123 ENGINEERING CONSTRUCTION DESIGN JOINT STOCK COMPANY, HUNG PHU TRADING AND CONSTRUCTION CONSULTANT JOINT STOCK COMPANY, HUNG NGHIEP CONSTRUCTION-CONSULTING CO ., LTD, A2Z CONSTRUCTION CONSULTING JOINT STOCK COMPANY, TAN PHAT JOINT STOCK COMPANY
06/08/2025 10:46
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package TV14: Traffic safety verification consultant before putting the project into exploitation .
- Winning bidder: Road Engineering Center
30/07/2025 10:22
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bidding package Package TV7: Consulting on technical design verification, verification of Cam Lo - La Son segment estimates with 1 participating contractors .
18/07/2025 11:11
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bidding package Package TV6: Advice on supervising the survey of technical design steps Cam Lo - La Son. with 1 participating contractors .
18/07/2025 10:43
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bidding package TV5 Package: Survey consultancy, technical design, estimation of Cam Lo - La Son. with 1 participating contractors .
18/07/2025 10:16
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package TV13: Environmental monitoring and monitoring advice during construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KỸ THUẬT TÀI NGUYÊN VÀ MÔI TRƯỜNG
02/07/2025 09:30
Ban Quản lý dự án Đường Hồ Chí Minh announced the results of the bid package Package BH1: Insurance of construction works to expand the North - South Expressway in the East section of La Son - Hoa Lien .
- Winning bidder: Vietinbank Insurance, BaoViet Insurance Corporation, PVI Insurance, Tổng Công ty cổ phần bảo hiểm Petrolimex, military insurance corporation, BAO MINH INSURANCE CORPORATION, Agriculture Bank Insurance Joint Stock Corporation
01/07/2025 17:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Bidding package TV14: Consulting on preparing documents to change forest use purposes to other purposes of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: MINH TOAN AGRIFOR COMPANY
30/12/2025 17:50
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TB1: Supply and install equipment for traffic monitoring and administration systems of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: HITD - HIGH DIGITAL TECHNOLOGY JOINT STOCK COMPANY
26/12/2025 11:17
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the request Supplementing the contractor selection plan, North - South Expressway expansion project east of La Son - Hoa Lien section of the investor Ban Quản lý dự án Đường Hồ Chí Minh with 1 bidding package.
24/12/2025 13:53
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV11: Construction supervision consultancy for section Km37+300 - Km102+200. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: THANG LONG ENGINEERING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
17/12/2025 17:37
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package XL2: Construction of section Km37+300 – Km102+200 (including survey and design of BVTC) of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
17/12/2025 11:00
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package XL1: Construction of section Km0+000 – Km37+300 (including survey and design of BVTC) of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: HUGIA DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
17/12/2025 10:59
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV10: Construction supervision consultancy for section Km0+000 - Km37+300. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: THANG LONG CONSTRUCTION QUALITY CONSULTANT JOINT STOCK CONPANY
15/12/2025 17:59
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Bidding package RP1: Construction of bombs, mines and explosive objects of Cam Lo - La Son. of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: TRUONG SON CONSTRUCTION CORPORATION
09/12/2025 17:53
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package TV15: Completed audit audit consultancy of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: AAC AUDITING AND ACCOUNTING COMPANY LIMITED
03/12/2025 17:11
The Bid solicitor Ban Quản lý dự án Đường Hồ Chí Minh has posted the results of the bidding package Package MS1: Supply and installation of 05 air conditioning units of the investor Ban Quản lý dự án Đường Hồ Chí Minh.
- Winning bidder: Công ty TNHH Thương mại Điện máy Hà Nội
03/12/2025 16:18
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đường Hồ Chí Minh is the investor of 12 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án Đường Hồ Chí Minh is the owner of 67 contractor selection plan. In which, they self-invite 52 of contractor selection plan, other units invite bids of 15 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án Đường Hồ Chí Minh is the investor of 139 package, of which 100 package is self-invited, other units invite bid 39 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đường Hồ Chí Minh is the owner of 146 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Ban Quản lý dự án Đường Hồ Chí Minh has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Đường Hồ Chí Minh is an investor with 168 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.