Data analysis results of DauThau.info software for project owners Ban Quản lý dự án tỉnh Đồng Tháp as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 22 contractors.
- Announced 5 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 13 contractor selection plans with a total of 34 bidding packages, of which 8 prequalification documents have not found the investment project
- Has invited bids for 4 packages (with 5 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 30 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 26 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 5.00 contractors.
- Breakdown by bidding field: Goods 40.00%, Construction 0%, Consultancy 60.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 244,268,941,000 VND, of which the total winning bid value is: 230,928,298,000 VND.
- The savings rate is: 5.46%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án tỉnh Đồng Tháp as follows:
- Has relationships with 22 contractors.
- The average number of contractors participating in each bidding package is: 5.00 contractors.
- Proportion of bidding fields: Goods 40.00%, Construction 0%, Consulting 60.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 244,268,941,000 VND, in which the total winning value is: 230,928,298,000 VND.
- The savings rate is: 5.46%.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 14 bidding packages with 11 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package 03: Consultancy for verification of Feasibility Study Report of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: SOUTH TRANSPORT ENGINEERING DESIGN JOINT STOCK INCORPORATED
05/01/2026 14:04
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 02: Survey consultancy, pre -feasibility study report of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: 625 CIVIL ENGINEERING CONSULTANTS JOINT STOCK COMPANY
26/12/2025 13:36
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 15: Construction of emergency remediation of Tien River landslides in the Tien River bank erosion protection embankment area, Thuong Phuoc commune (730m long from the end of the 370m section to Hong Ngu - Tan Chau ferry terminal) of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: HA NOI IRRIGATION TRANSPORT INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
23/12/2025 10:21
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 12: Consulting Diving inspection to serve project acceptance of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC HOÀNG HÀ
17/12/2025 15:24
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 16: Construction of internal fuel station of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THỊNH HƯNG PHÁT
12/12/2025 20:28
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the request Contractor selection plan for the project: Urgent remediation of Tien River landslides in Tien River bank erosion protection embankment, Thuong Phuoc commune, Dong Thap province of the investor Ban Quản lý dự án tỉnh Đồng Tháp with 15 bidding package.
11/12/2025 14:07
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the request Contractor selection plan for the preparation of a Feasibility Study Report for the An Binh intersection improvement project, Dong Thap province of the investor Ban Quản lý dự án tỉnh Đồng Tháp with 3 bidding package.
11/12/2025 09:49
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 13: Construction insurance of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: BAO MINH INSURANCE CORPORATION
03/12/2025 13:43
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package 15: Project quality testing of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: SOUTHERN INSTITUTE OF WATER RESOURCES RESEARCH
02/12/2025 09:09
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Bidding package No. 08: Consulting on verification of financial protection design and estimates of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: THUY LOI UNIVERSITY CONSULTANT COMPANY LIMITED
28/11/2025 10:48
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án tỉnh Đồng Tháp announced the results of the bid package Package No. 14: Auditing Consulting .
- Winning bidder: A&C AUDITING AND CONSULTING COMPANY LIMITED
08/09/2025 14:19
Ban Quản lý dự án tỉnh Đồng Tháp announced the results of the bidding package Tender package No 14: Auditing Consulting with 5 participating contractors .
18/07/2025 10:14
Ban Quản lý dự án tỉnh Đồng Tháp publishes Tender Notice Tender package No 14: Auditing Consulting in the form Open bidding .
30/06/2025 11:27
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package 03: Consultancy for verification of Feasibility Study Report of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: SOUTH TRANSPORT ENGINEERING DESIGN JOINT STOCK INCORPORATED
05/01/2026 14:04
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 02: Survey consultancy, pre -feasibility study report of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: 625 CIVIL ENGINEERING CONSULTANTS JOINT STOCK COMPANY
26/12/2025 13:36
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 15: Construction of emergency remediation of Tien River landslides in the Tien River bank erosion protection embankment area, Thuong Phuoc commune (730m long from the end of the 370m section to Hong Ngu - Tan Chau ferry terminal) of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: HA NOI IRRIGATION TRANSPORT INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
23/12/2025 10:21
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 12: Consulting Diving inspection to serve project acceptance of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC HOÀNG HÀ
17/12/2025 15:24
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 16: Construction of internal fuel station of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THỊNH HƯNG PHÁT
12/12/2025 20:28
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the request Contractor selection plan for the project: Urgent remediation of Tien River landslides in Tien River bank erosion protection embankment, Thuong Phuoc commune, Dong Thap province of the investor Ban Quản lý dự án tỉnh Đồng Tháp with 15 bidding package.
11/12/2025 14:07
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the request Contractor selection plan for the preparation of a Feasibility Study Report for the An Binh intersection improvement project, Dong Thap province of the investor Ban Quản lý dự án tỉnh Đồng Tháp with 3 bidding package.
11/12/2025 09:49
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package No. 13: Construction insurance of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: BAO MINH INSURANCE CORPORATION
03/12/2025 13:43
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Package 15: Project quality testing of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: SOUTHERN INSTITUTE OF WATER RESOURCES RESEARCH
02/12/2025 09:09
The Bid solicitor Ban Quản lý dự án tỉnh Đồng Tháp has posted the results of the bidding package Bidding package No. 08: Consulting on verification of financial protection design and estimates of the investor Ban Quản lý dự án tỉnh Đồng Tháp.
- Winning bidder: THUY LOI UNIVERSITY CONSULTANT COMPANY LIMITED
28/11/2025 10:48
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án tỉnh Đồng Tháp is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án tỉnh Đồng Tháp is the owner of 13 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 13 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án tỉnh Đồng Tháp is the investor of 5 package, of which 0 package is self-invited, other units invite bid 5 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án tỉnh Đồng Tháp is the owner of 30 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban Quản lý dự án tỉnh Đồng Tháp has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án tỉnh Đồng Tháp is an investor with 22 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.