Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners 22 JOINT STOCK COMPANY as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 11 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 5 contractor selection plans with a total of 9 bidding packages, of which 5 prequalification documents have not found the investment project
- Has invited bids for 6 packages (with 6 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 15 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 22,201,777,450 VND, of which the total winning bid value is: 21,991,192,300 VND.
- The savings rate is: 0.95%.
Data analysis results of DauThau.info software for project owners 22 JOINT STOCK COMPANY as follows:
- Has relationships with 11 contractors.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 22,201,777,450 VND, in which the total winning value is: 21,991,192,300 VND.
- The savings rate is: 0.95%.
You need to Login or Sign up to view all informations.
- Participated in 291 bidding packages, of which 255 were won, 32 were lost, 2 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 34.37% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.82% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (89), Hải Phòng (20), TP.Hồ Chí Minh (6), Bắc Ninh (3), Nghệ An (3), Tuyên Quang (3), Quảng Ninh (3), Đà Nẵng (2), Cần Thơ (2), Thanh Hoá (1), Gia Lai (1), Khánh Hòa (1), Hưng Yên (1), Đồng Nai (1), Nationwide (1), Điện Biên (1), (1), Undefined (152)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (89), Hải Phòng (18), Bình Dương (4), Nghệ An (3), Tuyên Quang (3), Quảng Ninh (3), Hải Dương (2), Đà Nẵng (2), Cần Thơ (2), Bắc Giang (2), Thanh Hoá (1), Bắc Ninh (1), Gia Lai (1), Bà Rịa - Vũng Tàu (1), Ninh Thuận (1), Thái Bình (1), TP.Hồ Chí Minh (1), Đồng Nai (1), Nationwide (1), Điện Biên (1), Undefined (162)
- Has relationships with 71 Bid Solicitors
- Has competed against 63 contractors in 82 bidding packages, won 46 packages, lost 32 packages, 3 are pending results, and 1 were canceled.
- Has collaborated with 19 contractors in 49 bidding packages, won 45 packages, lost 3 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02 of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH Kỹ thuật và Sản xuất LAVENDER LIGHTING
15/10/2025 09:41
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 02 of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
26/09/2025 11:06
The Bid solicitor 22 JOINT STOCK COMPANY has posted the request Shopping equipment to improve the capacity to serve production and business activities of the investor 22 JOINT STOCK COMPANY with 2 bidding package.
26/09/2025 10:22
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: KIEN CUONG TECHNOLOGY TRANSFER AND TRADING COMPANY LIMITED
06/02/2025 17:49
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 01: Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY with the form Open bidding.
13/01/2025 14:45
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: VIET NAM CONSTRUCTION CONSULTING AND BIDDING COMPANY LIMITED
08/01/2025 11:08
The Bid solicitor 22 JOINT STOCK COMPANY has posted the request Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY with 2 bidding package.
02/01/2025 09:44
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 03: Procurement of machinery and equipment for button production of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
31/05/2024 16:54
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Bidding package No. 01: Purchase of machinery and equipment for production of the investor 22 JOINT STOCK COMPANY.
06/12/2023 09:35
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Bidding package No. 01: Purchase of machinery and equipment for production of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
14/11/2023 16:48
The data sheet has been partially hidden, to see the full information please Login or Register
22 JOINT STOCK COMPANY announced the results of the bid package Package No. 01: Procurement of machinery and equipment to improve production capacity of dry food products .
- Winning bidder: KIEN CUONG TECHNOLOGY TRANSFER AND TRADING COMPANY LIMITED
06/02/2025 17:49
22 JOINT STOCK COMPANY announced the results of the bidding package Tender package No 01: Procurement of machinery and equipment to improve production capacity of dry food products with 1 participating contractors .
22/01/2025 10:24
22 JOINT STOCK COMPANY publishes Tender Notice Tender package No 01: Procurement of machinery and equipment to improve production capacity of dry food products in the form Open bidding .
13/01/2025 14:45
22 JOINT STOCK COMPANY announced the results of the bid package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation .
- Winning bidder: VIET NAM CONSTRUCTION CONSULTING AND BIDDING COMPANY LIMITED
08/01/2025 11:08
22 JOINT STOCK COMPANY publishes the plan Procurement of machinery and equipment to improve production capacity of dry food products with 2 bidding package .
02/01/2025 09:44
22 JOINT STOCK COMPANY publishes Tender Notice Tender package No 03: Procurement of machinery and equipment for button production in the form Competitive Offer .
31/05/2024 16:54
22 JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 01: Purchase of machinery and equipment for production .
- Winning bidder: KIEN CUONG TECHNOLOGY TRANSFER AND TRADING COMPANY LIMITED, AUTOMECH MECHANICAL EQUIPMENT AND SOLUTIONS JOINT STOCK COMPANY
06/12/2023 09:35
22 JOINT STOCK COMPANY announced the results of the bidding package Bidding package No. 01: Purchase of machinery and equipment for production with 1 participating contractors .
21/11/2023 17:17
22 JOINT STOCK COMPANY publishes Tender Notice Bidding package No. 01: Purchase of machinery and equipment for production in the form Competitive Offer .
14/11/2023 16:48
22 JOINT STOCK COMPANY publishes the plan Buy machinery and equipment for production with 3 bidding package .
13/11/2023 11:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 02 of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH Kỹ thuật và Sản xuất LAVENDER LIGHTING
15/10/2025 09:41
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 02 of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
26/09/2025 11:06
The Bid solicitor 22 JOINT STOCK COMPANY has posted the request Shopping equipment to improve the capacity to serve production and business activities of the investor 22 JOINT STOCK COMPANY with 2 bidding package.
26/09/2025 10:22
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: KIEN CUONG TECHNOLOGY TRANSFER AND TRADING COMPANY LIMITED
06/02/2025 17:49
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 01: Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY with the form Open bidding.
13/01/2025 14:45
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation of the investor 22 JOINT STOCK COMPANY.
- Winning bidder: VIET NAM CONSTRUCTION CONSULTING AND BIDDING COMPANY LIMITED
08/01/2025 11:08
The Bid solicitor 22 JOINT STOCK COMPANY has posted the request Procurement of machinery and equipment to improve production capacity of dry food products of the investor 22 JOINT STOCK COMPANY with 2 bidding package.
02/01/2025 09:44
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Tender package No 03: Procurement of machinery and equipment for button production of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
31/05/2024 16:54
The Bid solicitor 22 JOINT STOCK COMPANY has posted the results of the bidding package Bidding package No. 01: Purchase of machinery and equipment for production of the investor 22 JOINT STOCK COMPANY.
06/12/2023 09:35
Bid solicitor 22 JOINT STOCK COMPANY has posted Tender Notice Bidding package No. 01: Purchase of machinery and equipment for production of the investor 22 JOINT STOCK COMPANY with the form Competitive Offer.
14/11/2023 16:48
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 22 JOINT STOCK COMPANY is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor 22 JOINT STOCK COMPANY is the owner of 5 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor 22 JOINT STOCK COMPANY is the investor of 6 package, of which 5 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 22 JOINT STOCK COMPANY is the owner of 15 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor 22 JOINT STOCK COMPANY has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 22 JOINT STOCK COMPANY is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.