Data analysis results of DauThau.info software for project owners Công ty Thủy điện Đồng Nai as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 292 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 39 contractor selection plans with a total of 211 bidding packages, of which 38 prequalification documents have not found the investment project
- Has invited bids for 325 packages (with 331 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 373 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 89 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 34 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.48 contractors.
- Breakdown by bidding field: Goods 46.53%, Construction 18.43%, Consultancy 7.55%, Non-consultancy 27.49%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 507,462,591,405 VND, of which the total winning bid value is: 433,285,188,152 VND.
- The savings rate is: 14.62%.
Data analysis results of DauThau.info software for project owners Công ty Thủy điện Đồng Nai as follows:
- Has relationships with 292 contractors.
- The average number of contractors participating in each bidding package is: 2.48 contractors.
- Proportion of bidding fields: Goods 46.53%, Construction 18.43%, Consulting 7.55%, Non-consulting 27.49%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 507,462,591,405 VND, in which the total winning value is: 433,285,188,152 VND.
- The savings rate is: 14.62%.
You need to Login or Sign up to view all informations.
- Participated in 14 bidding packages, of which 14 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 62.69% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.03% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (14)
- Provinces before the merger where the contractor has participated in bidding : Undefined (14)
- Has relationships with 3 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 2 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: Công ty Cổ phần tư vấn điện và xây dựng Đông Á
04/11/2022 16:20
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XUẤT NHẬP KHẨU VÀ DỊCH VỤ KỸ THUẬT NHẬT MINH
26/10/2022 17:25
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
19/10/2022 09:46
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-13: Procurement of consumables for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CỬA HÀNG TOÀN DIỆN
19/10/2022 09:46
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTPT-2022-01: Procurement of office equipment and sanitary equipment for production and business of TDDN Company of the investor Công ty Thủy điện Đồng Nai.
04/10/2022 15:15
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package Procurement of office equipment in 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CỬA HÀNG TOÀN DIỆN
04/10/2022 15:12
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTXD-2022-01: Consultancy on survey, preparation of economic and technical reports and construction estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 2
26/09/2022 16:42
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai with the form National competitive bidding.
14/09/2022 15:24
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai with the form National competitive bidding.
14/09/2022 13:35
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai with the form National Competitive Bidding.
14/09/2022 08:20
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Thủy điện Đồng Nai announced the results of the bid package DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants .
- Winning bidder: Công ty Cổ phần tư vấn điện và xây dựng Đông Á
04/11/2022 16:20
Công ty Thủy điện Đồng Nai announced the results of the bid package TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XUẤT NHẬP KHẨU VÀ DỊCH VỤ KỸ THUẬT NHẬT MINH
26/10/2022 17:25
Công ty Thủy điện Đồng Nai announced the results of the bidding package DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants with 1 participating contractors .
25/10/2022 17:08
Công ty Thủy điện Đồng Nai announced the results of the bid package TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 .
- Winning bidder: CÔNG TY TNHH VINASPARE
19/10/2022 09:46
Công ty Thủy điện Đồng Nai announced the results of the bid package TX-MS.22-13: Procurement of consumables for SCTX - Phase 2 2022 .
- Winning bidder: CỬA HÀNG TOÀN DIỆN
19/10/2022 09:46
Công ty Thủy điện Đồng Nai announced the results of the bid package DTPT-2022-01: Procurement of office equipment and sanitary equipment for production and business of TDDN Company .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TIN HỌC GIA NGUYÊN
04/10/2022 15:15
Công ty Thủy điện Đồng Nai announced the results of the bid package Procurement of office equipment in 2022 .
- Winning bidder: CỬA HÀNG TOÀN DIỆN
04/10/2022 15:12
Công ty Thủy điện Đồng Nai announced the results of the bid package DTXD-2022-01: Consultancy on survey, preparation of economic and technical reports and construction estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 2
26/09/2022 16:42
Công ty Thủy điện Đồng Nai announced the results of the bidding package TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 with 2 participating contractors .
26/09/2022 10:42
Công ty Thủy điện Đồng Nai announced the results of the bidding package TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 with 3 participating contractors .
21/09/2022 10:19
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: Công ty Cổ phần tư vấn điện và xây dựng Đông Á
04/11/2022 16:20
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XUẤT NHẬP KHẨU VÀ DỊCH VỤ KỸ THUẬT NHẬT MINH
26/10/2022 17:25
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
19/10/2022 09:46
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package TX-MS.22-13: Procurement of consumables for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CỬA HÀNG TOÀN DIỆN
19/10/2022 09:46
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTPT-2022-01: Procurement of office equipment and sanitary equipment for production and business of TDDN Company of the investor Công ty Thủy điện Đồng Nai.
04/10/2022 15:15
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package Procurement of office equipment in 2022 of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CỬA HÀNG TOÀN DIỆN
04/10/2022 15:12
The Bid solicitor Công ty Thủy điện Đồng Nai has posted the results of the bidding package DTXD-2022-01: Consultancy on survey, preparation of economic and technical reports and construction estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 2
26/09/2022 16:42
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice DTXD-2022-02: Consultancy and verification of technical and economic reports and construction cost estimate of fences to protect Dong Nai 3 and Dong Nai 4 power plants of the investor Công ty Thủy điện Đồng Nai with the form National competitive bidding.
14/09/2022 15:24
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice TX-MS.22-11: Procurement of electrical materials and equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai with the form National competitive bidding.
14/09/2022 13:35
Bid solicitor Công ty Thủy điện Đồng Nai has posted Tender Notice TX-MS.22-12: Procurement of materials and mechanical equipment for SCTX - Phase 2 2022 of the investor Công ty Thủy điện Đồng Nai with the form National Competitive Bidding.
14/09/2022 08:20
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Thủy điện Đồng Nai is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Công ty Thủy điện Đồng Nai is the owner of 39 contractor selection plan. In which, they self-invite 39 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Công ty Thủy điện Đồng Nai is the investor of 331 package, of which 278 package is self-invited, other units invite bid 53 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Thủy điện Đồng Nai is the owner of 373 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Công ty Thủy điện Đồng Nai has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Thủy điện Đồng Nai is an investor with 292 contractor. The data sheet has been partially hidden, to see the full information please Login or Register