Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners ĐOÀN 871 as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 10 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 7 contractor selection plans with a total of 11 bidding packages, of which 7 prequalification documents have not found the investment project
- Has invited bids for 2 packages (with 2 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 13 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,568,235,700 VND, of which the total winning bid value is: 3,566,508,513 VND.
- The savings rate is: 0.05%.
Data analysis results of DauThau.info software for project owners ĐOÀN 871 as follows:
- Has relationships with 10 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,568,235,700 VND, in which the total winning value is: 3,566,508,513 VND.
- The savings rate is: 0.05%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package XL-02: Construction and installation of construction equipment of the investor ĐOÀN 871.
- Winning bidder: PHUC TUONG ADVERTISEMENT AND TRADING COMPANY LIMITED
12/07/2024 15:47
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Xl-01:Construction of the investor ĐOÀN 871.
- Winning bidder: TH VIET NAM CONSTRUCTION ARCHITECTURE JOINT STOCK COMPANY
17/05/2024 10:29
Bid solicitor ĐOÀN 871 has posted Tender Notice XL-02: Construction and installation of construction equipment of the investor ĐOÀN 871 with the form Open bidding.
15/05/2024 11:36
The Bid solicitor ĐOÀN 871 has posted the request Install 02 elevators at the lecture hall building/ Group 871 of the investor ĐOÀN 871 with 4 bidding package.
22/04/2024 14:30
Bid solicitor ĐOÀN 871 has posted Tender Notice Xl-01:Construction of the investor ĐOÀN 871 with the form Competitive Offer.
08/04/2024 14:29
The Bid solicitor ĐOÀN 871 has posted the request Renovate and repair car wash bridge, build garage for Doan 871 car of the investor ĐOÀN 871 with 2 bidding package.
03/04/2024 17:13
The Bid solicitor ĐOÀN 871 has posted the request Supply and installation of 2-room wooden cabinets for Group 871 of the investor ĐOÀN 871 with 1 bidding package.
20/06/2023 21:13
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 of the investor ĐOÀN 871.
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 21:09
The Bid solicitor ĐOÀN 871 has posted the request Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 of the investor ĐOÀN 871 with 1 bidding package.
20/06/2023 21:05
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Supply and installation of materials, air conditioners for offices, System 1, System 3 / Group 871; of the investor ĐOÀN 871.
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 20:58
The data sheet has been partially hidden, to see the full information please Login or Register
ĐOÀN 871 publishes the plan Install 02 elevators at the lecture hall building/ Group 871 with 4 bidding package .
22/04/2024 14:30
ĐOÀN 871 publishes the plan Renovate and repair car wash bridge, build garage for Doan 871 car with 2 bidding package .
03/04/2024 17:13
ĐOÀN 871 publishes the plan Supply and installation of 2-room wooden cabinets for Group 871 with 1 bidding package .
20/06/2023 21:13
ĐOÀN 871 announced the results of the bid package Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 .
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 21:09
ĐOÀN 871 publishes the plan Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 with 1 bidding package .
20/06/2023 21:05
ĐOÀN 871 announced the results of the bid package Supply and installation of materials, air conditioners for offices, System 1, System 3 / Group 871; .
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 20:58
ĐOÀN 871 publishes the plan Supply and installation of materials, air conditioners for offices, System 1, System 3 / Group 871; with 1 bidding package .
20/06/2023 20:41
ĐOÀN 871 announced the results of the bid package Construction of the roof of the 1st meeting room lobby and the wall of the kitchen warehouse, System 3 / Group 871 .
- Winning bidder: HOANGSON MECHANIC DEVELOPMEMT AND TRADING COMPANY LIMITED
25/05/2023 15:07
ĐOÀN 871 publishes the plan Construction of the roof of the 1st meeting room lobby and the wall of the kitchen warehouse, System 3 / Group 871 with 1 bidding package .
24/05/2023 17:29
ĐOÀN 871 publishes the plan Repairing the 2nd floor of student housing (N1) System 1 / Group 871 with 1 bidding package .
03/05/2023 15:21
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package XL-02: Construction and installation of construction equipment of the investor ĐOÀN 871.
- Winning bidder: PHUC TUONG ADVERTISEMENT AND TRADING COMPANY LIMITED
12/07/2024 15:47
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Xl-01:Construction of the investor ĐOÀN 871.
- Winning bidder: TH VIET NAM CONSTRUCTION ARCHITECTURE JOINT STOCK COMPANY
17/05/2024 10:29
Bid solicitor ĐOÀN 871 has posted Tender Notice XL-02: Construction and installation of construction equipment of the investor ĐOÀN 871 with the form Open bidding.
15/05/2024 11:36
The Bid solicitor ĐOÀN 871 has posted the request Install 02 elevators at the lecture hall building/ Group 871 of the investor ĐOÀN 871 with 4 bidding package.
22/04/2024 14:30
Bid solicitor ĐOÀN 871 has posted Tender Notice Xl-01:Construction of the investor ĐOÀN 871 with the form Competitive Offer.
08/04/2024 14:29
The Bid solicitor ĐOÀN 871 has posted the request Renovate and repair car wash bridge, build garage for Doan 871 car of the investor ĐOÀN 871 with 2 bidding package.
03/04/2024 17:13
The Bid solicitor ĐOÀN 871 has posted the request Supply and installation of 2-room wooden cabinets for Group 871 of the investor ĐOÀN 871 with 1 bidding package.
20/06/2023 21:13
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 of the investor ĐOÀN 871.
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 21:09
The Bid solicitor ĐOÀN 871 has posted the request Supply and installation of repair materials for air conditioners International System / Group 871 Quarter II / 2023 of the investor ĐOÀN 871 with 1 bidding package.
20/06/2023 21:05
The Bid solicitor ĐOÀN 871 has posted the results of the bidding package Supply and installation of materials, air conditioners for offices, System 1, System 3 / Group 871; of the investor ĐOÀN 871.
- Winning bidder: Công ty TNHH Kỹ thuật điện tử điện lạnh Trường Phát
20/06/2023 20:58
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor ĐOÀN 871 is the owner of 7 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor ĐOÀN 871 is the investor of 2 package, of which 0 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ĐOÀN 871 is the owner of 13 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor ĐOÀN 871 has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ĐOÀN 871 is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.