Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD as follows:
- Has relationships with 5 bid solicitors.
- Has relationships with 153 contractors.
- Announced 11 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 108 contractor selection plans with a total of 201 bidding packages, of which 58 prequalification documents have not found the investment project
- Has invited bids for 47 packages (with 57 tender notices), conducted prequalification for 3 packages.
- Published 0 quotation requests.
- Announced the results of 97 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 55 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 118 packages that have not fully posted the contractor selection results. Of these 114 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.50 contractors.
- Breakdown by bidding field: Goods 19.30%, Construction 15.79%, Consultancy 24.56%, Non-consultancy 40.35%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 68,334,586,445,113 VND, of which the total winning bid value is: 63,627,169,779,905 VND.
- The savings rate is: 6.89%.
Data analysis results of DauThau.info software for project owners HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD as follows:
- Has relationships with 153 contractors.
- The average number of contractors participating in each bidding package is: 2.50 contractors.
- Proportion of bidding fields: Goods 19.30%, Construction 15.79%, Consulting 24.56%, Non-consulting 40.35%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 68,334,586,445,113 VND, in which the total winning value is: 63,627,169,779,905 VND.
- The savings rate is: 6.89%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan for the investment preparation phase Urban railway construction investment project, urban railway according to the TOD model Extended Line 2A (Ha Dong - Xuan Mai), Line 2.2 (Tran Hung Dao - Thuong Dinh), Line 2.3 (Nam Thang Long - Noi Bai), Line 3.3 (Nhon - Troi and extended to Son Tay) and Line 1 (Ngoc Hoi - Yen Vien) of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 9 bidding package.
16/04/2026 17:22
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TP1-18: Consulting on preparing task outlines, estimates and contractor selection, negotiating contracts for bidding packages Consulting on auditing the final settlement of completed projects and Package TP1-19: Consulting on auditing the final settlement of completed projects of Project Component 1: Compensation, support, resettlement, land recovery, moving technical infrastructure works and leveling the ground of Son Dong Depot under the Ha City Urban Railway Construction Investment Project No. 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 2 bidding package.
16/04/2026 17:01
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TV06: Consulting on auditing completed project settlement, Component project 2: Investment in construction of Hanoi urban railway, Line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac belongs to Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
16/04/2026 15:19
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Package TV06: Consulting on auditing and finalizing completed projects, Component project 2, line 5 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
16/04/2026 15:16
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Construction and renovation of the 3rd floor office room for the Hanoi Urban Railway Management Board in 2026 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: 368 TECCONS COMPANY LIMITED
14/04/2026 15:05
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Consulting on surveying and assessing the impact of demolishing the roof of the lobby at 112 Tran Hung Dao Street, which conflicts with the scope of construction of underground station S12 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: VietNam Institute for Building Science and Technology
10/04/2026 14:19
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TV05: Legal advice and legal support for investment projects in the project implementation phase of Project Component 2: Investment in the construction of Hanoi urban railway, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac under the Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
06/04/2026 13:51
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan (KHLCNT) Package TV02: System safety assessment consulting, Component project 2: Investment in construction of Hanoi urban railway, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac belongs to Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
02/04/2026 16:55
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Package TP1-12: Construction and relocation of information and telecommunications systems of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: DNC INVESTMENT JOINT STOCK COMPANY
01/04/2026 18:02
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan: Construction of renovating the office on the 3rd floor of the Hanoi Urban Railway Management Board's headquarters in 2026 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
27/03/2026 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bidding package Package TP1-12: Construction and relocation of information and telecommunications systems with 1 participating contractors .
25/03/2026 10:30
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bidding package Package TP1-17: Consulting on moving construction supervision: Information and telecommunications systems; Electrical system; Water supply system; Drainage system and Trees with 1 participating contractors .
09/03/2026 09:52
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bidding package Package TP1-14: Construction and relocation of water supply system with 1 participating contractors .
06/03/2026 10:30
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bidding package Package TP1-15: Construction and relocation of drainage system with 1 participating contractors .
06/03/2026 10:30
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bidding package Package TP1-13: Construction and relocation of electrical system with 1 participating contractors .
06/03/2026 10:30
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bid package Package No. 12: Consulting on valuation of equipment, supplies, special materials .
- Winning bidder: GIA DINH VALUATION JOINT STOCK COMPANY
17/12/2025 09:27
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bid package Package No. 11: Consulting to verify the construction drawing design and estimate of relocation of technical infrastructure systems (the system includes: water supply, drainage, telecoms, low voltage electricity, camera and traffic lights, trees) .
- Winning bidder: CONINCO JOINT STOCK COMPANY FOR CONSTRUCTION AND ENVIRONTMENT TECHNOLOGY
20/11/2025 18:35
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD publishes the plan Bidding packages "Consulting surveys, construction drawing designs and detailed estimates for the technical infrastructure item" for construction with 4 bidding package .
27/10/2025 11:41
HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD announced the results of the bid package Package No. 4: Verification consultancy .
- Winning bidder: SOUTH TRANSPORT ENGINEERING DESIGN JOINT STOCK INCORPORATED, Arup Singapore Pte Ltd, THONG NHAT INFRASTRUCTURE CONSULTING JOINT STOCK COMPANY
15/08/2025 17:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan for the investment preparation phase Urban railway construction investment project, urban railway according to the TOD model Extended Line 2A (Ha Dong - Xuan Mai), Line 2.2 (Tran Hung Dao - Thuong Dinh), Line 2.3 (Nam Thang Long - Noi Bai), Line 3.3 (Nhon - Troi and extended to Son Tay) and Line 1 (Ngoc Hoi - Yen Vien) of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 9 bidding package.
16/04/2026 17:22
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TP1-18: Consulting on preparing task outlines, estimates and contractor selection, negotiating contracts for bidding packages Consulting on auditing the final settlement of completed projects and Package TP1-19: Consulting on auditing the final settlement of completed projects of Project Component 1: Compensation, support, resettlement, land recovery, moving technical infrastructure works and leveling the ground of Son Dong Depot under the Ha City Urban Railway Construction Investment Project No. 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 2 bidding package.
16/04/2026 17:01
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TV06: Consulting on auditing completed project settlement, Component project 2: Investment in construction of Hanoi urban railway, Line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac belongs to Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
16/04/2026 15:19
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Package TV06: Consulting on auditing and finalizing completed projects, Component project 2, line 5 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
16/04/2026 15:16
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Construction and renovation of the 3rd floor office room for the Hanoi Urban Railway Management Board in 2026 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: 368 TECCONS COMPANY LIMITED
14/04/2026 15:05
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Consulting on surveying and assessing the impact of demolishing the roof of the lobby at 112 Tran Hung Dao Street, which conflicts with the scope of construction of underground station S12 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: VietNam Institute for Building Science and Technology
10/04/2026 14:19
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan Package TV05: Legal advice and legal support for investment projects in the project implementation phase of Project Component 2: Investment in the construction of Hanoi urban railway, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac under the Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
06/04/2026 13:51
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan (KHLCNT) Package TV02: System safety assessment consulting, Component project 2: Investment in construction of Hanoi urban railway, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac belongs to Hanoi urban railway construction investment project, line 5, Van Cao - Ngoc Khanh - Lang - Hoa Lac of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
02/04/2026 16:55
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the results of the bidding package Package TP1-12: Construction and relocation of information and telecommunications systems of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD.
- Winning bidder: DNC INVESTMENT JOINT STOCK COMPANY
01/04/2026 18:02
The Bid solicitor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has posted the request Contractor selection plan: Construction of renovating the office on the 3rd floor of the Hanoi Urban Railway Management Board's headquarters in 2026 of the investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD with 1 bidding package.
27/03/2026 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD is the investor of 11 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD is the owner of 108 contractor selection plan. In which, they self-invite 48 of contractor selection plan, other units invite bids of 60 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD is the investor of 57 package, of which 48 package is self-invited, other units invite bid 9 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD is the owner of 97 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD has a relationship with 5 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD is an investor with 153 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.