Data analysis results of DauThau.info software for project owners Sở Xây dựng Thanh Hóa as follows:
- Has relationships with 5 bid solicitors.
- Has relationships with 171 contractors.
- Announced 127 development investment project, of which 6 projects that have not announced the contractor selection plan.
- Announced 167 contractor selection plans with a total of 350 bidding packages, of which 39 prequalification documents have not found the investment project
- Has invited bids for 156 packages (with 172 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 157 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 38 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 190 packages that have not fully posted the contractor selection results. Of these 176 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.15 contractors.
- Breakdown by bidding field: Goods 1.15%, Construction 63.22%, Consultancy 22.99%, Non-consultancy 12.64%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,780,550,310,658 VND, of which the total winning bid value is: 1,675,189,708,570 VND.
- The savings rate is: 5.92%.
Data analysis results of DauThau.info software for project owners Sở Xây dựng Thanh Hóa as follows:
- Has relationships with 171 contractors.
- The average number of contractors participating in each bidding package is: 1.15 contractors.
- Proportion of bidding fields: Goods 1.15%, Construction 63.22%, Consulting 22.99%, Non-consulting 12.64%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,780,550,310,658 VND, in which the total winning value is: 1,675,189,708,570 VND.
- The savings rate is: 5.92%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
05/01/2026 14:19
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the results of the bidding package Package No. 07: Traffic safety verification consultant of the investor Sở Xây dựng Thanh Hóa.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
05/01/2026 13:50
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Unscheduled repair of Kham 2 bridge Km53+324/National Highway 15C, Pha Lo bridge Km140+150/National Highway 217, Cay Chuong bridge Km22+361/National Highway 217B and Ben Xanh bridge Km27+478/National Highway 217B, Thanh Hoa province of the investor Sở Xây dựng Thanh Hóa with 3 bidding package.
05/01/2026 10:47
Sở Xây dựng Thanh Hóa Posted Development Investment Project Unscheduled repair of Kham 2 bridge Km53+324/National Highway 15C, Pha Lo bridge Km140+150/National Highway 217, Cay Chuong bridge Km22+361/National Highway 217B and Ben Xanh bridge Km27+478/National Highway 217B, Thanh Hoa province.
05/01/2026 10:10
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 16:10
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 15:28
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 15:27
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Contractor selection plan Project: Landslide treatment for section from Km88+740 - Km88+840 National Highway 15C (in front of Pu Nhi Border Guard Station) of the investor Sở Xây dựng Thanh Hóa with 3 bidding package.
25/12/2025 08:51
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Service package No. 05: Management and regular maintenance of DT.517, DT.515B, DT.514, DT.514B, 515C, 515, 514C routes (years 2026-2028) of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
24/12/2025 09:29
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Adjusting the contractor selection plan for package No. 07: Consulting on traffic safety verification under the project Road from Bim Son Industrial Park to coastal road section Nga Son - Hoang Hoa of the investor Sở Xây dựng Thanh Hóa with 1 bidding package.
24/12/2025 07:37
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng Thanh Hóa announced the results of the bid package Package No. 08: Installing site clearance stakes and road boundary markers .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG THƯƠNG MẠI MINH HƯNG
17/12/2025 15:56
Sở Xây dựng Thanh Hóa announced the results of the bid package Package No. 05: Survey, prepare technical construction plans, and estimates for mine and explosive material clearance .
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
17/12/2025 15:53
Sở Xây dựng Thanh Hóa announced the results of the bid package Package 02: Examination of construction drawing design and construction estimates .
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
17/12/2025 15:50
Sở Xây dựng Thanh Hóa announced the results of the bid package Package No. 06: Construction of mines and mines and explosives .
- Winning bidder: LỮ ĐOÀN 299/QUÂN ĐOÀN 12
17/12/2025 15:42
Sở Xây dựng Thanh Hóa announced the results of the bid package Package 07: Supervision of demining, mines and explosives work .
- Winning bidder: 319 BOM, MINS, UXO ONE MEMBER COMPANY LIMITED
17/12/2025 15:39
Sở Xây dựng Thanh Hóa announced the results of the bid package Package No. 03: Consulting on designing BVTC and estimates .
- Winning bidder: APOLLO CONSTRUCTION CONSULTANT LIMITED LIABILITY COMPANY
28/07/2025 08:25
Sở Xây dựng Thanh Hóa announced the results of the bid package Package 04: Consultancy and verification of BVTC design and cost estimate .
- Winning bidder: THANGLONG CONSULTANT INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
24/07/2025 11:24
Sở Xây dựng Thanh Hóa announced the results of the bid package Package No. 05: Valuation of materials and equipment .
- Winning bidder: HA THANH APPRAISAL AND INSPECTION JOINT STOCK COMPANY
24/07/2025 11:19
Sở Xây dựng Thanh Hóa publishes the plan Repairing background, road surface, drainage system section Km0+900 - Km1+460 Muc Son - Hón Can street (DT.519) with 2 bidding package .
17/07/2025 14:32
Sở Xây dựng Thanh Hóa announced the results of the bidding package Tender package No 03: Consulting on designing BVTC and estimates with 1 participating contractors .
15/07/2025 09:24
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
05/01/2026 14:19
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the results of the bidding package Package No. 07: Traffic safety verification consultant of the investor Sở Xây dựng Thanh Hóa.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
05/01/2026 13:50
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Unscheduled repair of Kham 2 bridge Km53+324/National Highway 15C, Pha Lo bridge Km140+150/National Highway 217, Cay Chuong bridge Km22+361/National Highway 217B and Ben Xanh bridge Km27+478/National Highway 217B, Thanh Hoa province of the investor Sở Xây dựng Thanh Hóa with 3 bidding package.
05/01/2026 10:47
Sở Xây dựng Thanh Hóa Posted Development Investment Project Unscheduled repair of Kham 2 bridge Km53+324/National Highway 15C, Pha Lo bridge Km140+150/National Highway 217, Cay Chuong bridge Km22+361/National Highway 217B and Ben Xanh bridge Km27+478/National Highway 217B, Thanh Hoa province.
05/01/2026 10:10
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 16:10
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 15:28
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Construction and installation works of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
30/12/2025 15:27
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Contractor selection plan Project: Landslide treatment for section from Km88+740 - Km88+840 National Highway 15C (in front of Pu Nhi Border Guard Station) of the investor Sở Xây dựng Thanh Hóa with 3 bidding package.
25/12/2025 08:51
Bid solicitor Sở Xây dựng Thanh Hóa has posted Tender Notice Service package No. 05: Management and regular maintenance of DT.517, DT.515B, DT.514, DT.514B, 515C, 515, 514C routes (years 2026-2028) of the investor Sở Xây dựng Thanh Hóa with the form Open bidding.
24/12/2025 09:29
The Bid solicitor Sở Xây dựng Thanh Hóa has posted the request Adjusting the contractor selection plan for package No. 07: Consulting on traffic safety verification under the project Road from Bim Son Industrial Park to coastal road section Nga Son - Hoang Hoa of the investor Sở Xây dựng Thanh Hóa with 1 bidding package.
24/12/2025 07:37
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Xây dựng Thanh Hóa is the investor of 127 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Sở Xây dựng Thanh Hóa is the owner of 167 contractor selection plan. In which, they self-invite 113 of contractor selection plan, other units invite bids of 54 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Sở Xây dựng Thanh Hóa is the investor of 172 package, of which 32 package is self-invited, other units invite bid 140 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Xây dựng Thanh Hóa is the owner of 157 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Sở Xây dựng Thanh Hóa has a relationship with 5 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Xây dựng Thanh Hóa is an investor with 171 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.