Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners UBND phường Yên Thắng, tỉnh Ninh Bình as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 7 contractors.
- Announced 3 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 22 contractor selection plans with a total of 16 bidding packages, of which 18 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 9 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,940,988,000 VND, of which the total winning bid value is: 5,940,988,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for project owners UBND phường Yên Thắng, tỉnh Ninh Bình as follows:
- Has relationships with 7 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,940,988,000 VND, in which the total winning value is: 5,940,988,000 VND.
- The savings rate is: 0.00%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Approve tasks and cost estimates for preparing the project's technical feasibility report: Repair and maintenance of traffic routes from Cay Sung Temple to Ly Nhan TDP, from Cau Co to Cau Co TDP, from Cau Co to Le Trong Tan Street of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
12/01/2026 16:51
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package DECISION
Regarding the approval of the Contractor Selection Plan, Consulting on Traffic Safety Verification in the phase of preparing the Feasibility Study Report of the Project of Construction of infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI XUÂN HỢP
09/01/2026 16:14
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision on approving the Contractor Selection Plan, Consulting on Traffic Safety Verification in the phase of preparing the Feasibility Study Report of the Project of Construction of infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
07/01/2026 15:55
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Consulting on surveys, preparing an environmental impact assessment report to build resettlement area infrastructure in Yen Thang ward to serve clearance of high-speed railway projects on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: ACT CONSTRUCTIONS AND TRADING COMPANY LIMITED
09/12/2025 10:48
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Approve the plan to select a survey consulting contractor and prepare an environmental impact assessment report for the project to build infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed rail project on the North - South axis. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
09/12/2025 10:29
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Approve the plan to select survey consulting contractors and prepare a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG AN HOÀNG LONG
08/12/2025 12:06
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision to approve the contractor selection plan. Consulting, surveying, and preparing a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the North-South high-speed railway project. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
08/12/2025 12:02
UBND phường Yên Thắng, tỉnh Ninh Bình Posted Development Investment Project Decision approving tasks and procurement budget estimates: Upgrading and integrating digital conversion of the radio station system of Yen Thang ward.
04/12/2025 16:16
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision to approve the contractor selection plan. Consulting, surveying, and preparing a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the North-South high-speed railway project. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
03/12/2025 19:20
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Cost of supervision consulting of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và thương mại Khôi Nguyên
05/11/2025 22:42
The data sheet has been partially hidden, to see the full information please Login or Register
UBND phường Yên Thắng, tỉnh Ninh Bình announced the results of the bid package Consulting on surveys, preparing an environmental impact assessment report to build resettlement area infrastructure in Yen Thang ward to serve clearance of high-speed railway projects on the North - South axis .
- Winning bidder: ACT CONSTRUCTIONS AND TRADING COMPANY LIMITED
09/12/2025 10:48
UBND phường Yên Thắng, tỉnh Ninh Bình publishes the plan Approve the plan to select a survey consulting contractor and prepare an environmental impact assessment report for the project to build infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed rail project on the North - South axis. with 1 bidding package .
09/12/2025 10:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Approve tasks and cost estimates for preparing the project's technical feasibility report: Repair and maintenance of traffic routes from Cay Sung Temple to Ly Nhan TDP, from Cau Co to Cau Co TDP, from Cau Co to Le Trong Tan Street of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
12/01/2026 16:51
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package DECISION
Regarding the approval of the Contractor Selection Plan, Consulting on Traffic Safety Verification in the phase of preparing the Feasibility Study Report of the Project of Construction of infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI XUÂN HỢP
09/01/2026 16:14
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision on approving the Contractor Selection Plan, Consulting on Traffic Safety Verification in the phase of preparing the Feasibility Study Report of the Project of Construction of infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
07/01/2026 15:55
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Consulting on surveys, preparing an environmental impact assessment report to build resettlement area infrastructure in Yen Thang ward to serve clearance of high-speed railway projects on the North - South axis of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: ACT CONSTRUCTIONS AND TRADING COMPANY LIMITED
09/12/2025 10:48
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Approve the plan to select a survey consulting contractor and prepare an environmental impact assessment report for the project to build infrastructure for resettlement areas in Yen Thang ward to serve site clearance for the high-speed rail project on the North - South axis. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
09/12/2025 10:29
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Approve the plan to select survey consulting contractors and prepare a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the high-speed railway project on the North - South axis. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG AN HOÀNG LONG
08/12/2025 12:06
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision to approve the contractor selection plan. Consulting, surveying, and preparing a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the North-South high-speed railway project. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
08/12/2025 12:02
UBND phường Yên Thắng, tỉnh Ninh Bình Posted Development Investment Project Decision approving tasks and procurement budget estimates: Upgrading and integrating digital conversion of the radio station system of Yen Thang ward.
04/12/2025 16:16
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the request Decision to approve the contractor selection plan. Consulting, surveying, and preparing a feasibility study report for the project to build resettlement area infrastructure in Yen Thang ward to serve site clearance for the North-South high-speed railway project. of the investor UBND phường Yên Thắng, tỉnh Ninh Bình with 1 bidding package.
03/12/2025 19:20
The Bid solicitor UBND phường Yên Thắng, tỉnh Ninh Bình has posted the results of the bidding package Cost of supervision consulting of the investor UBND phường Yên Thắng, tỉnh Ninh Bình.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và thương mại Khôi Nguyên
05/11/2025 22:42
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND phường Yên Thắng, tỉnh Ninh Bình is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor UBND phường Yên Thắng, tỉnh Ninh Bình is the owner of 22 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 21 of contractor selection plan.
Summary: Investor UBND phường Yên Thắng, tỉnh Ninh Bình is the owner of 9 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor UBND phường Yên Thắng, tỉnh Ninh Bình has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND phường Yên Thắng, tỉnh Ninh Bình is an investor with 7 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.