Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ủy ban nhân dân phường Hoàng Mai as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 15 contractors.
- Announced 5 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 9 contractor selection plans with a total of 35 bidding packages, of which 4 prequalification documents have not found the investment project
- Has invited bids for 6 packages (with 7 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 9 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 26 packages that have not fully posted the contractor selection results. Of these 26 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 42.86%, Consultancy 42.86%, Non-consultancy 0%, Mixed 14.29%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 40,722,272,854 VND, of which the total winning bid value is: 39,440,075,440 VND.
- The savings rate is: 3.15%.
Data analysis results of DauThau.info software for project owners Ủy ban nhân dân phường Hoàng Mai as follows:
- Has relationships with 15 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 42.86%, Consulting 42.86%, Non-consulting 0%, Mixed 14.29%, Other 0%.
- The total value according to the bidding package with valid IMP is: 40,722,272,854 VND, in which the total winning value is: 39,440,075,440 VND.
- The savings rate is: 3.15%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: HOANG LONG PREVENTION AND FIGHT FIRE AND TECHNIQUE EQUITMENT JOINT STOCK COMPANY
24/12/2025 10:33
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Bidding package No. 01: Construction drawing design - estimate of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: A DESIGN VIET NAM JOINT STOCK COMPANY
12/12/2025 15:17
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package No. 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: KHANH AN COMPANY LIMITED
12/12/2025 10:18
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Bidding package No. 01: Construction drawing design - estimate of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: VIET NAM PREVENTION AND FIGHT FIRE JOINT STOCK COMPANY
12/12/2025 09:23
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package No. 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: NAM PHONG CONSTRUCTION COMPANY LIMITED
10/12/2025 12:18
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package 02: Supervision of construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: VIET NAM CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
10/12/2025 11:23
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Design construction drawings and cost estimates of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: SONG HONG ELECTRICITY JOINT STOCK COMPANY
10/12/2025 11:06
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
04/12/2025 15:00
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
01/12/2025 19:40
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Tender package No 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
21/11/2025 15:42
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân phường Hoàng Mai publishes the plan Building Yen Kindergarten at D3/NT1 plot with 5 bidding package .
24/10/2025 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: HOANG LONG PREVENTION AND FIGHT FIRE AND TECHNIQUE EQUITMENT JOINT STOCK COMPANY
24/12/2025 10:33
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Bidding package No. 01: Construction drawing design - estimate of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: A DESIGN VIET NAM JOINT STOCK COMPANY
12/12/2025 15:17
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package No. 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: KHANH AN COMPANY LIMITED
12/12/2025 10:18
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Bidding package No. 01: Construction drawing design - estimate of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: VIET NAM PREVENTION AND FIGHT FIRE JOINT STOCK COMPANY
12/12/2025 09:23
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package No. 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: NAM PHONG CONSTRUCTION COMPANY LIMITED
10/12/2025 12:18
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Package 02: Supervision of construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: VIET NAM CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
10/12/2025 11:23
The Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted the results of the bidding package Design construction drawings and cost estimates of the investor Ủy ban nhân dân phường Hoàng Mai.
- Winning bidder: SONG HONG ELECTRICITY JOINT STOCK COMPANY
10/12/2025 11:06
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
04/12/2025 15:00
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Civil Works of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
01/12/2025 19:40
Bid solicitor Ủy ban nhân dân phường Hoàng Mai has posted Tender Notice Tender package No 01: Construction and equipment installation of the investor Ủy ban nhân dân phường Hoàng Mai with the form Open bidding.
21/11/2025 15:42
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Hoàng Mai is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ủy ban nhân dân phường Hoàng Mai is the owner of 9 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 8 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ủy ban nhân dân phường Hoàng Mai is the investor of 7 package, of which 0 package is self-invited, other units invite bid 7 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Hoàng Mai is the owner of 9 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ủy ban nhân dân phường Hoàng Mai has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Hoàng Mai is an investor with 15 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.