Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 25 contractors.
- Announced 3 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 15 contractor selection plans with a total of 35 bidding packages, of which 9 prequalification documents have not found the investment project
- Has invited bids for 11 packages (with 12 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 40 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 31 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 41.67%, Construction 50.00%, Consultancy 0%, Non-consultancy 8.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 23,497,835,046 VND, of which the total winning bid value is: 23,248,273,866 VND.
- The savings rate is: 1.06%.
Data analysis results of DauThau.info software for project owners UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG as follows:
- Has relationships with 25 contractors.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 41.67%, Construction 50.00%, Consulting 0%, Non-consulting 8.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 23,497,835,046 VND, in which the total winning value is: 23,248,273,866 VND.
- The savings rate is: 1.06%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package No. 07: Construction, supply and installation of construction equipment of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ QUẢNG NINH
25/07/2025 17:28
Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted Tender Notice Tender package No 07: Construction, supply and installation of construction equipment of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with the form Open bidding.
28/06/2025 10:51
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 06: Supervision consultancy of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI MAXHOUSE
27/06/2025 15:13
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 05: Project management consulting of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:11
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Bidding package 04: Consulting on evaluation of Bidding Documents, Evaluation of results of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN DỰ ÁN VÀ ĐẦU TƯ XÂY DỰNG QUẢNG NINH
27/06/2025 15:09
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package No. 03: Bid preparation consultancy, Bid evaluation of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:07
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: AN PHU LOC DEVELOPMENTAL INVESTMENT COMPANY LIMITED
27/06/2025 15:04
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 01: Consulting on making economic and technical reports of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: ACC ARCHITECTURE DESIGN AND ADVISORY JOINT STOCK COMPANY
27/06/2025 15:02
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the request The plan to select the contractor step to invest in the project of repairing the old city administrative center headquarters on 24/5 Street, Hong Gai Ward of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with 6 bidding package.
27/06/2025 14:36
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the request The contractor selection plan for bidding packages to prepare investment projects for repairing the old city administrative center headquarters on January 25, Hong Gai Ward of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with 2 bidding package.
27/06/2025 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package No. 07: Construction, supply and installation of construction equipment .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ QUẢNG NINH
25/07/2025 17:28
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bidding package Tender package No 07: Construction, supply and installation of construction equipment with 1 participating contractors .
10/07/2025 09:31
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG publishes Tender Notice Tender package No 07: Construction, supply and installation of construction equipment in the form Open bidding .
28/06/2025 10:51
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package 06: Supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI MAXHOUSE
27/06/2025 15:13
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package 05: Project management consulting .
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:11
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Bidding package 04: Consulting on evaluation of Bidding Documents, Evaluation of results .
- Winning bidder: CÔNG TY CỔ PHẦN DỰ ÁN VÀ ĐẦU TƯ XÂY DỰNG QUẢNG NINH
27/06/2025 15:09
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package No. 03: Bid preparation consultancy, Bid evaluation .
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:07
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package 02: Consultancy and verification of economic and technical reports .
- Winning bidder: AN PHU LOC DEVELOPMENTAL INVESTMENT COMPANY LIMITED
27/06/2025 15:04
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG announced the results of the bid package Package 01: Consulting on making economic and technical reports .
- Winning bidder: ACC ARCHITECTURE DESIGN AND ADVISORY JOINT STOCK COMPANY
27/06/2025 15:02
UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG publishes the plan The plan to select the contractor step to invest in the project of repairing the old city administrative center headquarters on 24/5 Street, Hong Gai Ward with 6 bidding package .
27/06/2025 14:36
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package No. 07: Construction, supply and installation of construction equipment of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ QUẢNG NINH
25/07/2025 17:28
Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted Tender Notice Tender package No 07: Construction, supply and installation of construction equipment of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with the form Open bidding.
28/06/2025 10:51
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 06: Supervision consultancy of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI MAXHOUSE
27/06/2025 15:13
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 05: Project management consulting of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:11
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Bidding package 04: Consulting on evaluation of Bidding Documents, Evaluation of results of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: CÔNG TY CỔ PHẦN DỰ ÁN VÀ ĐẦU TƯ XÂY DỰNG QUẢNG NINH
27/06/2025 15:09
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package No. 03: Bid preparation consultancy, Bid evaluation of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: VU DUONG CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY
27/06/2025 15:07
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: AN PHU LOC DEVELOPMENTAL INVESTMENT COMPANY LIMITED
27/06/2025 15:04
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the results of the bidding package Package 01: Consulting on making economic and technical reports of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG.
- Winning bidder: ACC ARCHITECTURE DESIGN AND ADVISORY JOINT STOCK COMPANY
27/06/2025 15:02
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the request The plan to select the contractor step to invest in the project of repairing the old city administrative center headquarters on 24/5 Street, Hong Gai Ward of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with 6 bidding package.
27/06/2025 14:36
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has posted the request The contractor selection plan for bidding packages to prepare investment projects for repairing the old city administrative center headquarters on January 25, Hong Gai Ward of the investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG with 2 bidding package.
27/06/2025 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG is the owner of 15 contractor selection plan. In which, they self-invite 15 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG is the investor of 12 package, of which 12 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG is the owner of 40 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UỶ BAN NHÂN DÂN PHƯỜNG HỒNG GAI - THÀNH PHỐ HẠ LONG is an investor with 25 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.