Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ủy ban nhân dân thị xã Cai Lậy as follows:
- Has relationships with 4 bid solicitors.
- Has relationships with 78 contractors.
- Announced 30 development investment project, of which 3 projects that have not announced the contractor selection plan.
- Announced 81 contractor selection plans with a total of 406 bidding packages, of which 53 prequalification documents have not found the investment project
- Has invited bids for 48 packages (with 57 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 36 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 16 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 351 packages that have not fully posted the contractor selection results. Of these 351 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 24.56%, Construction 50.88%, Consultancy 24.56%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 279,017,803,372 VND, of which the total winning bid value is: 270,049,415,000 VND.
- The savings rate is: 3.21%.
Data analysis results of DauThau.info software for project owners Ủy ban nhân dân thị xã Cai Lậy as follows:
- Has relationships with 78 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 24.56%, Construction 50.88%, Consulting 24.56%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 279,017,803,372 VND, in which the total winning value is: 270,049,415,000 VND.
- The savings rate is: 3.21%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: DONGTAM TIENGIANG CONSTRUCTION DESIGN
28/06/2025 10:07
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Terrain survey consultancy and construction design design after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
19/06/2025 14:01
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) of the investor Ủy ban nhân dân thị xã Cai Lậy with 17 bidding package.
18/06/2025 15:12
Ủy ban nhân dân thị xã Cai Lậy Posted Development Investment Project Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge).
18/06/2025 14:14
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction insurance of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
10/06/2025 08:09
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
05/06/2025 10:28
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Phu Quy Primary and Secondary School of the investor Ủy ban nhân dân thị xã Cai Lậy with 4 bidding package.
04/06/2025 08:47
Ủy ban nhân dân thị xã Cai Lậy Posted Development Investment Project Phu Quy Primary School - Secondary School.
04/06/2025 08:08
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Construction of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
22/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) with 17 bidding package .
18/06/2025 15:12
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Phu Quy Primary and Secondary School with 4 bidding package .
04/06/2025 08:47
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Upgrade and expansion of district 58 road, Cai Lay town with 13 bidding package .
21/05/2025 10:27
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Road to My Phuoc Tay residential area with 5 bidding package .
23/04/2025 11:40
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
18/04/2025 14:52
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on verifying the design of financial protection and electrical relocation estimates .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN ĐỒNG VIỆT
18/03/2025 08:42
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on surveys, design of physical protection and electrical relocation estimates .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ QD
18/03/2025 08:40
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consultancy on preparation of bidding documents and evaluation of bids for technical supervision consultancy bidding packages .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
10/03/2025 16:19
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on making bidding documents and evaluating bids for construction bidding packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG
10/03/2025 16:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: DONGTAM TIENGIANG CONSTRUCTION DESIGN
28/06/2025 10:07
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Terrain survey consultancy and construction design design after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
19/06/2025 14:01
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) of the investor Ủy ban nhân dân thị xã Cai Lậy with 17 bidding package.
18/06/2025 15:12
Ủy ban nhân dân thị xã Cai Lậy Posted Development Investment Project Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge).
18/06/2025 14:14
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction insurance of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
10/06/2025 08:09
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
05/06/2025 10:28
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Phu Quy Primary and Secondary School of the investor Ủy ban nhân dân thị xã Cai Lậy with 4 bidding package.
04/06/2025 08:47
Ủy ban nhân dân thị xã Cai Lậy Posted Development Investment Project Phu Quy Primary School - Secondary School.
04/06/2025 08:08
Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted Tender Notice Construction of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
22/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân thị xã Cai Lậy is the investor of 30 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ủy ban nhân dân thị xã Cai Lậy is the owner of 81 contractor selection plan. In which, they self-invite 21 of contractor selection plan, other units invite bids of 60 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ủy ban nhân dân thị xã Cai Lậy is the investor of 57 package, of which 0 package is self-invited, other units invite bid 57 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân thị xã Cai Lậy is the owner of 36 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ủy ban nhân dân thị xã Cai Lậy has a relationship with 4 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân thị xã Cai Lậy is an investor with 78 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.