Relationship between contractor CÔNG TY CP MHM and investor Ủy ban nhân dân phường Hưng Đông, thành phố Vinh

List of bid packages that the contractor has participated in from the investor

Please log in to check your permission to use the statistical data export feature of contractor. Please register if you do not have an account
No.
Bid Package
Investor
Bid Value
Time
Result
Contractor role
No.: 1
Bid Package:

Package 09: Plug in the ground clearance

Bid Value:

To view full information

Time:
Result:
Contractor role:
No.: 2
Bid Package:

Package 06: Construction supervision consultancy package No. 04

Bid Value:

To view full information

Time:
Result:
Contractor role:
No.: 3
Bid Package:

Package No. 01: Survey consulting, preparation of technical and economic reports and site clearance landmarks for the project: Connecting Tran Huu Thung street to Bui Duong Lich street, Hung Dong commune

Bid Value:

To view full information

Time:
Result:
Contractor role:

Summary: Contractor CÔNG TY CP MHM participated in 3 bids of investor: Ủy ban nhân dân phường Hưng Đông, thành phố Vinh, of which 3 bids were won, 0 bids were lost, 0 bids are undecided, 0 bids have been cancelled.

Data table has been partially hidden, please Login or Register to check the right to see full information. Note: To view full information you must Register for VIP3 package

You did not use the site, Click here to remain logged. Timeout: 60 second