Laboratory LAS-XD 1019

Management Unit Info: KONTUM TRANSPORT ENGIEERING MANAGEMENT AND CONSTRUCTION JOINT - STOCK CO.

Address
Số 01 Đường Nguyễn Thái Học, T.p Kon Tum, Kon Tum
Address (After merger)
Số 01 Đường Nguyễn Thái Học, T.p Kon Tum, Kon Tum, Quảng Ngãi
Tax code
6100104405

Laboratory information

Lab Name
Center for testing and design consulting
Laboratory address
Số 01 Đường Nguyễn Thái Học, T.p Kon Tum, Kon Tum
Laboratory address (After merger)
Số 01 Đường Nguyễn Thái Học, T.p Kon Tum, Kon Tum, Quảng Ngãi
Lab code
LAS-XD 1019
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of the LAS-Construction 1019 laboratory includes: Mechanical and physical testing of cement; Heavy concrete and concrete mixtures; Test concrete aggregates and mortar; Asphalt concrete testing; Bitumen testing; Physical and mechanical testing of mineral powder materials in asphalt concrete; Laboratory soil mechanical testing; Testing of metal materials and welded joints; Testing construction mortar; Mechanical testing of masonry bricks; Field testing; Mechanical testing of concrete bricks; Mechanical testing of self-inserting concrete bricks; Testing soil reinforced with adhesive. Technical standards used for the tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 5 years from the date of issue and replaces Decision No. 61/QD-BXD dated February 3, 2015 of the Minister of Construction.
Last update
07/03/2022 - 6 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 925/GCN-BXD.  July 8, 2019

This lab belongs to the contractor. The results of data analysis for contractor KONTUM TRANSPORT ENGIEERING MANAGEMENT AND CONSTRUCTION JOINT - STOCK CO. are as follows:

  • Participated in 72 bidding packages, of which 66 were won, 6 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 71.42% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Quảng Ngãi (49), Gia Lai (10), Đắk Lắk (2), Undefined (11)
  • Provinces before the merger where the contractor has participated in bidding : Kon Tum (39), Gia Lai (9), Đắk Lắk (2), Quảng Ngãi (1), Undefined (21)
  • Has relationships with 18 Bid Solicitors
  • Has relationships with 17 Bid Investors
  • Has competed against 40 contractors in 33 bidding packages, won 27 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 23 contractors in 36 bidding packages, won 35 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second