Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Decision name | Certification period |
|---|---|---|
| 1 | Certificate 321/GCN-BXD | October 27, 2022 |
| 2 | Certificate 744/GCN-BXD. | December 26, 2017 |
This lab belongs to the contractor. The results of data analysis for contractor THE CENTER OF RESEARCHING, APPLICATION AND CONSULTANT FOUNDATION ENGINEERING are as follows:
You need to Login or Sign up to view all informations.
- Participated in 104 bidding packages, of which 92 were won, 10 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 50.04% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.45% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (48), Khánh Hòa (4), Quảng Ngãi (4), Huế (4), Lâm Đồng (2), Đắk Lắk (2), Hà Nội (2), Cần Thơ (2), Hải Phòng (1), Quảng Trị (1), TP.Hồ Chí Minh (1), Undefined (33)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (23), Quảng Nam (15), Khánh Hòa (4), Quảng Ngãi (4), Huế (4), Phú Yên (2), Hà Nội (2), Cần Thơ (2), Lâm Đồng (1), Đắk Nông (1), Hải Phòng (1), Quảng Trị (1), Bà Rịa - Vũng Tàu (1), Undefined (43)
- Has relationships with 44 Bid Solicitors
- Has relationships with 44 Bid Investors
- Has competed against 32 contractors in 28 bidding packages, won 16 packages, lost 10 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 15 contractors in 18 bidding packages, won 16 packages, lost 0 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 16 bidding packages with 6 roles.