Laboratory LAS-XD 1315

Management Unit Info: RED DELTA JOINT STOCK COMPANY

Address
59 Khuất Duy Tiến, P. Thanh Xuân Bắc, Quận Thanh Xuân, Hà Nội.
Address (After merger)
59 Khuất Duy Tiến, Hà Nội.
Tax code
0105897309

Laboratory information

Lab Name
Laboratory and construction quality inspection
Laboratory address
Số 129 Đường Trung Văn, Phường Trung Văn, Quận Nam Từ Liêm, Hà Nội.
Laboratory address (After merger)
Số 129 Đường Trung Văn, Hà Nội
Lab code
LAS-XD 1315
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of the LAS-Construction 1315 laboratory includes: Mechanical and physical testing of cement; Concrete mix; Additives for concrete; Construction mortar; Sand, crushed stone (gravel), aggregate materials); Laboratory soil mechanical testing; Soil reinforced with adhesive; Check construction steel, metal products, welds; Testing PVC, uPVC, PPR, HDPE pipes, plastic pipe accessories; Asphalt concrete; Mineral powder in asphalt concrete; Bitumen, liquid asphalt, acid emulsion; Field testing; Physical and mechanical testing of natural wood and artificial wood; Construction glass testing; Precast concrete products; Bentonite/polymer solution; Testing bricks and concrete products; Tiles, paving stones; Testing of tiles and ceramics; Plasterboard, skeleton, putty; Testing paint, varnish, epoxy paint, waterproofing materials; Chemical analysis of water for construction; Geotextile, absorbent wick and absorbent wick cover. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This certificate is valid for 05 years from the date of issue and replaces Certificate No. 431/GCN-BXD dated July 3, 2018.
Last update
07/03/2022 - 2 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 266/GCN-BXD June 30, 2023
2 Certificate 431/GCN-BXD.  July 3, 2018

This lab belongs to the contractor. The results of data analysis for contractor RED DELTA JOINT STOCK COMPANY are as follows:

  • Participated in 75 bidding packages, of which 73 were won, 2 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 23.53% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 96.45% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Hà Nội (21), Hưng Yên (5), Đồng Tháp (4), Đắk Lắk (3), Đồng Nai (3), Sơn La (3), Bắc Ninh (2), Phú Thọ (2), TP.Hồ Chí Minh (1), Đà Nẵng (1), Tây Ninh (1), Undefined (29)
  • Provinces before the merger where the contractor has participated in bidding : Hà Nội (21), Tiền Giang (3), Đồng Nai (3), Sơn La (3), Thái Bình (3), Phú Yên (2), Hưng Yên (2), Bắc Giang (1), TP.Hồ Chí Minh (1), Đà Nẵng (1), Long An (1), Bắc Ninh (1), Phú Thọ (1), Undefined (32)
  • Has relationships with 45 Bid Solicitors
  • Has relationships with 48 Bid Investors
  • Has competed against 6 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 4 contractors in 5 bidding packages, won 4 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 52 bidding packages with 12 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party RED DELTA JOINT STOCK COMPANY are as follows:
  • Announced Contractor selection plan of 0 project with total 0 bidding packages.
  • Inviting bids 0 has been carried out package (with 0 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 0 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second