Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Decision name | Certification period |
|---|---|---|
| 1 | Certificate 18/GCN-BXD. | January 4, 2018 |
This lab belongs to the contractor. The results of data analysis for contractor Trung tâm Kỹ thuật Tiêu chuẩn Đo lường Chất lượng 2 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 270 bidding packages, of which 196 were won, 63 were lost, 6 are pending results, and 5 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 3.33% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 84.03% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (58), Lâm Đồng (32), Quảng Ngãi (26), Đắk Lắk (23), Gia Lai (19), Khánh Hòa (19), Quảng Trị (16), Huế (16), Quảng Ninh (13), Hà Tĩnh (11), Đồng Nai (10), TP.Hồ Chí Minh (8), Hải Phòng (6), Hà Nội (5), Nghệ An (5), Phú Thọ (4), Thanh Hoá (4), Hưng Yên (4), Vĩnh Long (3), Bắc Ninh (3), Cần Thơ (3), Ninh Bình (3), Đồng Tháp (2), Sơn La (2), Lai Châu (2), Lạng Sơn (1), Điện Biên (1), Cà Mau (1), An Giang (1), Tuyên Quang (1), Nationwide (1), Thái Nguyên (1), Undefined (16)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (33), Bình Thuận (18), Đắk Lắk (16), Huế (16), Quảng Ngãi (15), Quảng Ninh (13), Quảng Nam (13), Hà Tĩnh (11), Quảng Bình (11), Kon Tum (11), Khánh Hòa (11), Bình Định (10), Đồng Nai (9), Gia Lai (8), Phú Yên (7), Đắk Nông (7), Quảng Trị (5), Hà Nội (5), Nghệ An (5), Ninh Thuận (5), Bà Rịa - Vũng Tàu (4), Thanh Hoá (4), Hải Phòng (3), Bình Dương (3), Phú Thọ (3), Bắc Giang (3), Thái Bình (3), Lâm Đồng (3), Trà Vinh (2), Hải Dương (2), TP.Hồ Chí Minh (2), Tiền Giang (2), Cần Thơ (2), Sơn La (2), Lai Châu (2), Hà Nam (2), Lạng Sơn (1), Bến Tre (1), Điện Biên (1), Ninh Bình (1), Cà Mau (1), Kiên Giang (1), Hòa Bình (1), Tuyên Quang (1), Nationwide (1), Thái Nguyên (1), Undefined (50)
- Has relationships with 104 Bid Solicitors
- Has relationships with 99 Bid Investors
- Has competed against 93 contractors in 121 bidding packages, won 52 packages, lost 60 packages, 4 are pending results, and 5 were canceled.
- Has collaborated with 12 contractors in 16 bidding packages, won 15 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
blockquote>
- Announced Contractor selection plan of 56 project with total 61 bidding packages.
- Inviting bids 4 has been carried out package (with 4 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 85 package, cancel the bid for 0 package (among the packages above).
- Yes 60 package with results without TBMT, TBMST.