Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Decision name | Certification period |
|---|---|---|
| 1 | Certificate 131/GCN-BXD |
This lab belongs to the contractor. The results of data analysis for contractor National Research Institute of Mechanical Engineering are as follows:
You need to Login or Sign up to view all informations.
- Participated in 1008 bidding packages, of which 511 were won, 397 were lost, 56 are pending results, and 44 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7.13% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.98% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (172), Quảng Ninh (122), Phú Thọ (73), Lâm Đồng (46), TP.Hồ Chí Minh (34), Hà Nội (32), Vĩnh Long (30), Hưng Yên (30), Sơn La (26), Thanh Hoá (24), Gia Lai (21), Ninh Bình (20), Đồng Nai (16), Bắc Ninh (15), Quảng Ngãi (15), Lai Châu (14), Đắk Lắk (13), Cần Thơ (13), Hà Tĩnh (12), Đà Nẵng (11), Lạng Sơn (9), Lào Cai (8), Thái Nguyên (7), Nghệ An (7), Nationwide (3), An Giang (2), Đồng Tháp (2), Cà Mau (2), Quảng Trị (2), Tây Ninh (2), Huế (2), Tuyên Quang (2), Khánh Hòa (1), Undefined (230)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (122), Hải Phòng (85), Hải Dương (81), Hòa Bình (42), Hà Nội (32), Trà Vinh (29), Thái Bình (28), Bình Thuận (26), Sơn La (26), Phú Thọ (26), Bà Rịa - Vũng Tàu (24), Thanh Hoá (24), Ninh Bình (20), Gia Lai (18), Kon Tum (14), Lai Châu (14), Hà Tĩnh (12), Đắk Nông (11), Bắc Giang (10), Lạng Sơn (9), Bình Phước (8), Đồng Nai (8), Đắk Lắk (8), TP.Hồ Chí Minh (8), Lâm Đồng (8), Hậu Giang (8), Nghệ An (7), Quảng Nam (7), Thái Nguyên (6), Yên Bái (5), Phú Yên (4), Bình Định (3), Đà Nẵng (3), Bắc Ninh (3), Lào Cai (3), Kiên Giang (2), Sóc Trăng (2), Cà Mau (2), Quảng Bình (2), Huế (2), Tuyên Quang (2), Nationwide (2), Cần Thơ (1), Tiền Giang (1), Tây Ninh (1), Long An (1), Ninh Thuận (1), Undefined (270)
- Has relationships with 158 Bid Solicitors
- Has competed against 707 contractors in 718 bidding packages, won 237 packages, lost 393 packages, 54 are pending results, and 34 were canceled.
- Has collaborated with 70 contractors in 96 bidding packages, won 51 packages, lost 31 packages, 11 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 9 bidding packages with 4 roles.
blockquote>
- Announced Contractor selection plan of 19 project with total 35 bidding packages.
- Inviting bids 63 has been carried out package (with 63 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 14 package, cancel the bid for 0 package (among the packages above).
- Yes 5 package with results without TBMT, TBMST.