Laboratory LAS-XD 207

Management Unit Info: Viện Quy hoạch và Thiết kế xây dựng Quảng Ninh

Address
Phố Hải Thịnh, Phường Hồng Hải, TP. Hạ Long
Address (After merger)
Phố Hải Thịnh, TP. Hạ Long, Huế
Tax code
5700287452

Laboratory information

Lab Name
Testing and Testing Center
Laboratory address
Phố Hải Thịnh, Phường Hồng Hải, TP. Hạ Long
Laboratory address (After merger)
Phố Hải Thịnh, Huế
Lab code
LAS-XD 207
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 207 laboratory includes: Physical and mechanical testing of cement; Heavy concrete and concrete mixtures; Testing aggregates for concrete and mortar; Testing of fired clay bricks; Laboratory soil mechanical testing; Test the mechanical properties of metals; Mortar and mortar mixtures; Mechanical testing of self-inserting concrete blocks and concrete bricks; Mechanical testing of roofing tiles; Granite tile testing; Testing tiles and paving; Terrazo mechanical testing; Chemical analysis of water for construction; Mechanical testing of asphalt concrete; Bitumen; Emulsion; Physical and mechanical testing of mineral powder materials in asphalt concrete; Geotextile testing; Field testing; Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 5 years from the date of issue and replaces Decision No. 391/QD-BXD dated July 13, 2015 of the Minister of Construction.
Last update
26/02/2025 - 5 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 157/GCN-BXD.  March 11, 2019

This lab belongs to the contractor. The results of data analysis for contractor Viện Quy hoạch và Thiết kế xây dựng Quảng Ninh are as follows:

  • Participated in 245 bidding packages, of which 229 were won, 13 were lost, 1 are pending results, and 2 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 69.35% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 95.99% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (140), Hải Phòng (1), Undefined (104)
  • Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (140), Hải Dương (1), Undefined (104)
  • Has relationships with 61 Bid Solicitors
  • Has relationships with 62 Bid Investors
  • Has competed against 40 contractors in 27 bidding packages, won 13 packages, lost 13 packages, 0 are pending results, and 1 were canceled.
  • Has collaborated with 20 contractors in 24 bidding packages, won 22 packages, lost 1 packages, 0 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 35 bidding packages with 10 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second