Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Decision name | Certification period |
|---|---|---|
| 1 | Certificate 63/GCN-SXD Hà Nội | July 31, 2024 |
This lab belongs to the contractor. The results of data analysis for contractor Hydraulic Construction Institute are as follows:
You need to Login or Sign up to view all informations.
- Participated in 306 bidding packages, of which 282 were won, 19 were lost, 4 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 34.85% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (26), Phú Thọ (24), Điện Biên (18), Quảng Ninh (17), Thái Nguyên (14), Ninh Bình (13), Lạng Sơn (12), Quảng Trị (9), Lâm Đồng (9), Bắc Ninh (8), Hưng Yên (8), Hải Phòng (8), Thanh Hoá (7), Gia Lai (6), Cà Mau (5), Đà Nẵng (5), Hà Tĩnh (5), Lào Cai (4), Sơn La (3), Tây Ninh (3), Huế (3), Cần Thơ (2), Cao Bằng (2), An Giang (2), Nghệ An (2), Đồng Nai (1), TP.Hồ Chí Minh (1), Đắk Lắk (1), Quảng Ngãi (1), Khánh Hòa (1), Undefined (114)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (26), Hòa Bình (18), Điện Biên (18), Quảng Ninh (17), Lạng Sơn (12), Bắc Kạn (9), Bắc Giang (7), Quảng Bình (7), Thanh Hoá (7), Hà Nam (6), Quảng Nam (5), Hà Tĩnh (5), Gia Lai (4), Nam Định (3), Sơn La (3), Tây Ninh (3), Phú Thọ (3), Bình Thuận (3), Huế (3), Hải Phòng (3), Thái Bình (3), Ninh Bình (3), Bình Định (2), Hưng Yên (2), Bạc Liêu (2), Cần Thơ (2), Yên Bái (2), Cà Mau (2), Vĩnh Phúc (2), Lào Cai (2), Thái Nguyên (2), Hải Dương (2), Cao Bằng (2), Kiên Giang (2), Lâm Đồng (2), Nghệ An (2), Đắk Nông (2), Bắc Ninh (1), Đồng Nai (1), Bình Dương (1), Đắk Lắk (1), Quảng Ngãi (1), Khánh Hòa (1), Quảng Trị (1), Undefined (124)
- Has relationships with 123 Bid Solicitors
- Has relationships with 132 Bid Investors
- Has competed against 111 contractors in 97 bidding packages, won 76 packages, lost 19 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 100 contractors in 103 bidding packages, won 93 packages, lost 9 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 82 bidding packages with 19 roles.
blockquote>
- Announced Contractor selection plan of 21 project with total 31 bidding packages.
- Inviting bids 13 has been carried out package (with 18 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 27 package, cancel the bid for 0 package (among the packages above).
- Yes 20 package with results without TBMT, TBMST.