Laboratory LAS-XD 361

Management Unit Info: CIC KIEN GIANG CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY

Address
Số 34 Trần Phú, Phường Vĩnh Thanh, Thành phố Rạch Giá, Kiên Giang
Address (After merger)
Số 34 Trần Phú, Thành phố Rạch Giá, Tỉnh Kiên Giang, An Giang
Tax code
1702142310

Laboratory information

Lab Name
Laboratory of soil mechanics and construction materials
Laboratory address
Số 34 Trần Phú, Phường Vĩnh Thanh, Thành phố Rạch Giá, Kiên Giang
Laboratory address (After merger)
Số 34 Trần Phú, An Giang
Lab code
LAS-XD 361
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 361 laboratory includes: Concrete mixture and heavy concrete; Testing concrete aggregates and mortar; Laboratory soil testing; Field testing. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This certificate is valid for 05 years from the date of issue and replaces Certificate No. 565/GCN-BXD dated May 30, 2019.
Last update
07/03/2022 - 4 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 132/GCN-BXD May 9, 2023
2 Certificate 565/GCN-BXD.  May 30, 2019

This lab belongs to the contractor. The results of data analysis for contractor CIC KIEN GIANG CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY are as follows:

  • Participated in 75 bidding packages, of which 60 were won, 12 were lost, 3 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 9.48% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 69.47% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : An Giang (64), TP.Hồ Chí Minh (2), Vĩnh Long (2), Đồng Tháp (1), Cần Thơ (1), Undefined (5)
  • Provinces before the merger where the contractor has participated in bidding : Kiên Giang (43), TP.Hồ Chí Minh (2), Đồng Tháp (1), An Giang (1), Undefined (28)
  • Has relationships with 26 Bid Solicitors
  • Has relationships with 24 Bid Investors
  • Has competed against 54 contractors in 29 bidding packages, won 14 packages, lost 12 packages, 3 are pending results, and 0 were canceled.
  • Has collaborated with 5 contractors in 11 bidding packages, won 7 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 66 bidding packages with 13 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party CIC KIEN GIANG CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY are as follows:
  • Announced Contractor selection plan of 0 project with total 0 bidding packages.
  • Inviting bids 1 has been carried out package (with 1 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 1 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second