Laboratory LAS-XD 418

Management Unit Info: Trung tâm Giám định chất lượng xây dựng tỉnh Lào Cai

Address
Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Lào Cai.
Address (After merger)
Km3 Đại lộ Trần Hưng Đạo, TP. Lào Cai, Lào Cai.
Tax code
5300225726

Laboratory information

Lab Name
Construction specialized laboratory.
Laboratory address
Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Lào Cai.
Laboratory address (After merger)
Km3 Đại lộ Trần Hưng Đạo, Lào Cai
Lab code
LAS-XD 418
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 418 laboratory includes: Cement, aggregates; Mortar, wall putty; Metal, weld; Concrete and concrete mixtures; Bitumen; Asphalt concrete; Paint, Varnish; Reflective material; Roofing tile materials; Plasterboard; Fiber cement panels; Concrete wall panels; Artificial wood planks and floors; Field testing and prefabricated components. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This certificate supplements Certificate No. 138/GCN-BXD dated July 15, 2021 of the Minister of Construction on the issuance of Certificate of eligibility for specialized construction testing activities to the Construction Quality Inspection Center of Lao Cai province and is valid until July 15, 2026.
Last update
09/03/2022 - 2 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 361/GCN-BXD November 29, 2022
2 Certificate 138/GCN-BXD July 15, 2021
3 Certificate 30/GCN-BXD.  January 25, 2017

This lab belongs to the contractor. The results of data analysis for contractor Trung tâm Giám định chất lượng xây dựng tỉnh Lào Cai are as follows:

  • Participated in 1965 bidding packages, of which 1958 were won, 3 were lost, 4 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 8.79% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.64% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Lào Cai (1321), Hà Nội (1), Thái Nguyên (1), Đồng Nai (1), Lai Châu (1), Undefined (640)
  • Provinces before the merger where the contractor has participated in bidding : Lào Cai (1069), Yên Bái (7), Hà Nội (1), Thái Nguyên (1), Đồng Nai (1), Lai Châu (1), Undefined (891)
  • Has relationships with 124 Bid Solicitors
  • Has relationships with 157 Bid Investors
  • Has competed against 17 contractors in 15 bidding packages, won 10 packages, lost 3 packages, 2 are pending results, and 0 were canceled.
  • Has collaborated with 14 contractors in 18 bidding packages, won 17 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 1896 bidding packages with 69 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party Lao Cai construction verfication center are as follows:
  • Announced Contractor selection plan of 7 project with total 12 bidding packages.
  • Inviting bids 7 has been carried out package (with 8 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 5 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second