Laboratory LAS-XD 56.003

Management Unit Info: THUA THIEN HUE CONSTRUCTION JOINT STOCK CORPORATION

Address
số 72 đường Phạm Văn Đồng, Huế, tỉnh Thừa Thiên Huế.
Tax code
3300101156

Laboratory information

Lab Name
Laboratory of construction materials and soil mechanics.
Laboratory address
số 34 đường Tôn Thất Tùng, Huế, tỉnh Thừa Thiên Huế.
Laboratory address (After merger)
số 34 đường Tôn Thất Tùng, Huế
Lab code
LAS-XD 56.003
Recognition date
Recognition content
The list of testing criteria is eligible for specialized construction activities of Las-XD 56.003 laboratory including: Cement mechanical experiments; Experimenting with heavy concrete and concrete mixture; Aggregate experiments for concrete and construction mortar; Laboratory experiments in the laboratory; Construction steel mechanical experiments; Asphalt concrete experiments, scene experiments; Experimental mechanics of construction bricks; Construction mortar experiments; Self -inserting concrete brick mechanical experiments; Terazo brick experiment; Tiles tile experiments; Experimental aerated concrete tiles (ACC); Experimenting with foam concrete bricks, no gas; Experiments of cement tiles; Experiments of roof tile mechanics; Tactory of reinforced concrete sewers. Technical indicators used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of the technical standard to replace the old standard, the corresponding new standard must be applied This certificate takes 05 years from the date of signing and replaces the certificate No. 2207/GCN-SXD dated June 21, 2024 of the Department of Construction.
Last update
12/08/2024 - First update
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 5196/GCN-SXD Thừa Thiên Huế December 20, 2024
2 Certificate December 20, 2024
3 Certificate 2207/GCN-SXD Thừa Thiên Huế  June 21, 2024

This lab belongs to the contractor. The results of data analysis for contractor THUA THIEN HUE CONSTRUCTION JOINT STOCK CORPORATION are as follows:

  • Participated in 53 bidding packages, of which 23 were won, 29 were lost, 1 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 62.92% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 101.39% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Huế (34), Undefined (19)
  • Provinces before the merger where the contractor has participated in bidding : Huế (34), Undefined (19)
  • Has relationships with 27 Bid Solicitors
  • Has relationships with 13 Bid Investors
  • Has competed against 85 contractors in 34 bidding packages, won 4 packages, lost 29 packages, 1 are pending results, and 0 were canceled.
  • Has collaborated with 15 contractors in 16 bidding packages, won 9 packages, lost 7 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second