Laboratory LAS-XD 714

Management Unit Info: CÔNG TY TNHH THÍ NGHIỆM VÀ XÂY DỰNG THÀNH ĐÔ

Address
số 54 Chu Văn An, phường An Tân, thị xã An Khê, Gia Lai
Address (After merger)
số 54 Chu Văn An, Gia Lai
Tax code
5900473216

Laboratory information

Lab Name
General construction laboratory
Laboratory address
số 54 Chu Văn An, phường An Tân, thị xã An Khê, Gia Lai
Laboratory address (After merger)
số 54 Chu Văn An, Gia Lai
Lab code
LAS-XD 714
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 714 laboratory includes: Physical and mechanical testing of cement; Heavy concrete and concrete mixtures; Concrete aggregates and mortar; Physical and mechanical testing of soil and rocks in the room; Inspection of construction steel; Field testing; Testing construction mortar; Mechanical testing of masonry bricks; Asphalt concrete; Bitumen; Mechanical testing of self-inserting concrete bricks; Physical and mechanical testing of mineral powder materials in B.T.N; Mechanical testing of concrete blocks; Mechanical testing of roofing tiles; Testing autoclaved aerated concrete bricks; Testing of tiles; Mechanical testing of Terrazo tiles; Acid-based asphalt emulsion; Liquid asphalt; Concrete sewer pipes for drainage; Lightweight concrete block bricks. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This Certificate is valid for 05 years from the date of issuance and replaces Certificate No. 429/GCN-BXD dated August 8, 2017 of the Minister of Construction.
Last update
16/05/2022 - First update
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 65/GCN-BXD March 16, 2022

This lab belongs to the contractor. The results of data analysis for contractor CÔNG TY TNHH THÍ NGHIỆM VÀ XÂY DỰNG THÀNH ĐÔ are as follows:

  • Participated in 72 bidding packages, of which 58 were won, 9 were lost, 2 are pending results, and 3 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 84.14% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99.49% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Gia Lai (44), Phú Thọ (1), Undefined (27)
  • Provinces before the merger where the contractor has participated in bidding : Gia Lai (41), Hòa Bình (1), Bình Định (1), Undefined (29)
  • Has relationships with 14 Bid Solicitors
  • Has relationships with 13 Bid Investors
  • Has competed against 37 contractors in 28 bidding packages, won 14 packages, lost 9 packages, 2 are pending results, and 3 were canceled.
  • Has collaborated with 10 contractors in 12 bidding packages, won 9 packages, lost 2 packages, 0 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second